Woodland , Batterstown , Co. Meath
Data updated 13 Sept 2026 · register lag up to 7 days · sources & freshness
221550 is a planning application for permission at Woodland , Batterstown , Co. Meath, received by Meath County Council on 30 Nov 2022 and first seen by Planning Register on 11 Sept 2026. The application describes: The development will consist of: 1. Installation of outdoor Air Insulated Switchgear (AIS) electrical apparatus, including an associated extension to the hardstand compound (approximately 4 hectares) to facilitate same. This includes: a. installation of an extension to both sides of the existing 400 kV busbar, with provision of an associated wing coupler at either end of the existing 400 kV busbar. b. additional apparatus and associated works to the two existing busbars to create what is known as sectionalising bays. c. relocation of existing transformer connections from existing busbar to adjacent location on new busbar. d. an associated single-story extension (approximately 80 m2) to the existing control building. 2. The erection of four new lightning masts and relocation of one existing mast (each approximately 45m high). 3. Two bays on opposite sides to the newly extended 400 kV busbars at the southern end of the substation, each bay to incorporate breakers, reactive compensation devices and cable sealing ends. These bays will facilitate the connection of the new 400 kV underground cable links from Dunstown and Belcamp substations respectively. 4. Renewal, alteration and/or removal of associated 400 / 220 kV electrical apparatus and equipment. 5. All ancillary site development works including site preparation works, site clearance and levelling; provision of hardstanding, internal access tracks and temporary construction compound; associated underground cabling and earthgrid; associated extended surface water drainage network including a soakaway; associated palisade fencing and gates (approximately 2.65m high); lighting poles and landscaping as required to facilitate the development. Planning Permission is sought for a period of 10 years. Significant further information/revised plans submitted on this application. The council granted permission on 17 Apr 2023, with conditions. The five-week observation window closed on 13 Jan 2023.
Proposal
The development will consist of: 1. Installation of outdoor Air Insulated Switchgear (AIS) electrical apparatus, including an associated extension to the hardstand compound (approximately 4 hectares) to facilitate same. This includes: a. installation of an extension to both sides of the existing 400 kV busbar, with provision of an associated wing coupler at either end of the existing 400 kV busbar. b. additional apparatus and associated works to the two existing busbars to create what is known as sectionalising bays. c. relocation of existing transformer connections from existing busbar to adjacent location on new busbar. d. an associated single-story extension (approximately 80 m2) to the existing control building. 2. The erection of four new lightning masts and relocation of one existing mast (each approximately 45m high). 3. Two bays on opposite sides to the newly extended 400 kV busbars at the southern end of the substation, each bay to incorporate breakers, reactive compensation devices and cable sealing ends. These bays will facilitate the connection of the new 400 kV underground cable links from Dunstown and Belcamp substations respectively. 4. Renewal, alteration and/or removal of associated 400 / 220 kV electrical apparatus and equipment. 5. All ancillary site development works including site preparation works, site clearance and levelling; provision of hardstanding, internal access tracks and temporary construction compound; associated underground cabling and earthgrid; associated extended surface water drainage network including a soakaway; associated palisade fencing and gates (approximately 2.65m high); lighting poles and landscaping as required to facilitate the development. Planning Permission is sought for a period of 10 years. Significant further information/revised plans submitted on this application
- Status
- APPLICATION FINALISED
- Decision
- Conditional on 17 Apr 2023
- Final grant
- 25 May 2023
- Permission expires
- 24 May 2028
- Site (from polygon)
- 78 m²
- Location precision
- site (coords_polygon)
Timeline
- 30 Nov 2022New applicationObservation window closed 13 Jan 2023
- 1 Feb 2023Further information requested
- 27 Feb 2023Further information received
- 17 Apr 2023DecisionAppeal window closed 15 May 2023

Full planning report for 53.47391, -6.57035
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 139950). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/MeathCC/AppFileRefDetails/221550/0.
Source: npad · fetched 11 Sept 2026, 18:51