Planning Register
Meath County Council · 22708 · PERMISSION

The Murrens , Baltrasna , Oldcastle Co. Meath

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 30 May 2022We first saw it 11 Sept 2026, 18:51 (1566 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

22708 is a planning application for permission at The Murrens , Baltrasna , Oldcastle Co. Meath, received by Meath County Council on 30 May 2022 and first seen by Planning Register on 11 Sept 2026. The application describes: the development will consist - Development within an application area of c. 7 hectares. - A proposed new precast concrete manufacturing factory facility (c. 5.280m2) and all ancillary works. The proposed new factory will form an extension to the northern side of the existing precast concrete manufacturing factory on site as permitted by plan refs. KA101227; KA151329 and 2279; will be c. 160m long x c.33m wide (internal dimensions); with the overall height of the factory extension being the same as the existing factory at c. 14m above ground level. - Erection of 2,650m2 of photovoltaic panels on the roof of the existing and proposed factory units with all associated site works. - Provision of concrete surfacing over yard, storage and access road areas (c. 1.88 hectares). - 2 no. external gantry cranes (referenced 3 & 4 on plans) to be located within the existing external storage area for the movement of finished products within the storage area and for the loading of delivery HGVs. The proposed cranes will be c. 22.5m wide and c. 11.8m high and will move along a fixed track c. 160m in length. Provision for extension of existing external gantry crane no. 2 by c. 42.5m. - Additional (3rd) storage silo associated with the existing concrete batching plant (p. ref. KA101227), with an overall height similar to the existing silos of c.27.3m. - Permission for replacement of the existing waste water treatment system (WWTS) to allow for increased capacity and relocation of the percolation area. The council granted permission on 22 Jul 2022, with conditions. The five-week observation window closed on 4 Jul 2022. Within 500 m there are 2 other decided applications in the last five years.

Appeal window closes 19 Aug 2022 closed 1486 days ago
4 weeks from the council's decision (22 Jul 2022) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

the development will consist - Development within an application area of c. 7 hectares. - A proposed new precast concrete manufacturing factory facility (c. 5.280m2) and all ancillary works. The proposed new factory will form an extension to the northern side of the existing precast concrete manufacturing factory on site as permitted by plan refs. KA101227; KA151329 and 2279; will be c. 160m long x c.33m wide (internal dimensions); with the overall height of the factory extension being the same as the existing factory at c. 14m above ground level. - Erection of 2,650m2 of photovoltaic panels on the roof of the existing and proposed factory units with all associated site works. - Provision of concrete surfacing over yard, storage and access road areas (c. 1.88 hectares). - 2 no. external gantry cranes (referenced 3 & 4 on plans) to be located within the existing external storage area for the movement of finished products within the storage area and for the loading of delivery HGVs. The proposed cranes will be c. 22.5m wide and c. 11.8m high and will move along a fixed track c. 160m in length. Provision for extension of existing external gantry crane no. 2 by c. 42.5m. - Additional (3rd) storage silo associated with the existing concrete batching plant (p. ref. KA101227), with an overall height similar to the existing silos of c.27.3m. - Permission for replacement of the existing waste water treatment system (WWTS) to allow for increased capacity and relocation of the percolation area.

Status
APPLICATION FINALISED
Decision
Conditional on 22 Jul 2022
Final grant
1 Sept 2022
Permission expires
31 Aug 2027
Site (from polygon)
4.88 ha
Location precision
site (coords_polygon)

Timeline

  • 30 May 2022
    New application
    Observation window closed 4 Jul 2022
  • 22 Jul 2022
    Decision
    Appeal window closed 19 Aug 2022

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.72680, -7.22354

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 140398). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/MeathCC/AppFileRefDetails/22708/0.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open