PlanningRegister.ie
Meath County Council · 23351

No. 2 Saint Bridges Villas, Ballivor, Co. Meath

Declared invalid.

  1. 31 Mar 2023Received
Status
Withdrawn or invalid
Decision
Not yet
Council
Meath County Council
Type
PERMISSION
Site
78 m²

What’s proposed

the proposed development will consist of the demolition of two existing single story extensions to the rear of existing house, the construction of a 2 story extension to the side of existing house, consisting of an attic storage space, first floor bedroom and ensuite over a ground level entrance to the side of the existing house providing access to rear of the side and a single story rear extension to the existing house, consisting of kitchen and dining room and alterations to existing house, to include an attic conversion with 3 no. roof light windows to the rear for storage

Planning details

Reference
23351
Local authority
Meath County Council
Status
Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
Received
31 Mar 2023
Decision
Not decided
Site area
78 m² from the mapped boundary, not the council's figure

Live near No. 2 Saint Bridges Villas?

Everything else planned on your street, in one report.

Check my street
Council register ↗

Nearby 9 · 500 m · 12 months

Distance
Time
Show all 9

Explore this area on the map →

Homes nearby

Zoning

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

  • NIAH-recorded building · 3
    water pump; Saint Columbanus's Catholic Church

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

23351 is a planning application to Meath County Council for the proposed development will consist of the demolition of two existing single story, received on 31 Mar 2023; the file is recorded as incompleted application.