Meath County Council · 2360212

Carranstown, Caulstown, Platin Duleek County Meath

Approved in Feb 2024. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

What’s proposed

The proposed development will comprise a 170MW (electrical output) Open Cycle Gas Turbine (OCGT) Power Plant. The proposed development will comprise an electricity generating plant which will use Hydrotreated Vegetable Oil (HVO) as fuel and will be connected to a previously consented 110kV substation (ABP-303678-19) and associated site works and improved access from the R152.

Show all

The development comprises the following elements: a) Three gas turbine buildings (each 990m2) each housing 1 no. turbine, 1 no. generator and auxiliary equipment with a total of 269 MWth (thermal output) generating capacity all on concrete plinths. b) The power plant will have three exhaust stacks (25m in height), one exhaust stack per OCGT. Therefore, each OCGT will comprise a standalone Large Combustion Plant. The power plant may need to utilise, selective catalytic reduction (SCR) (18m high, 4.5 width, 14m length) for nitrogen oxides abatement. c) Water treatment plant comprising: • a 275m2 Deionising Building (6m high x 11m wide x 25m long) • a raw water treatment tank of 2,262m3 ( 12.8m high) • a deionised water tank (max. volume of 3,925m3). 15.4m high • a processed water tank of 450m3 (9m high) • 1 no. 20m2 firefighting water tank of 45m3 (2m high) • 1 no. 25m2 firewater module (4m high x 5m wide x 5m long) • 1 no. 41m2 sanitary foul water cesspool tank of 79m3 located underground (1.98m high x 2.5m wide x 16m long) • a bulk chemical storage area (4.75m wide x 7.75m long) d) 2 no. HVO tank (max. storage of 2300 m3 of HVO per tank), 13m high with a diameter of 15m and associated fuel pumping and filtering equipment and pipework, within a 43.5m L x 45.5m W x 1.5m Bund capacity is 2970m3. e) 1 ammonia tank –1.8m high x 3.5m length with bund 2.5 m x 5 m with a height of 1.5 m. f) 1 no. fuel polishing system (3m high x 6m wide x 24m long). g) 2 no. 110 kV transformers each 160m2, and each measuring (5m high x 10m wide x 15m long). 3 no. Lightning Masts (18m in height) and kiosks,cable gantry connection to the adjoining consented 110 kV Substation. h) A 520m2 services building (6m high x 13m wide x 40m long). i) A 160m2 Switchgear (MV) building (5m high x 6.1m wide x 26.3m long). j) All other miscellaneous and ancillary site works, including: 12 no. Car parking spaces and 1 No. fuel unloading bay, one lowered site platform area, new internal roads and hard and soft landscaping including material berms (1.2m to 2m high), a temporary construction compound…

Cut short by the council feed. Full text ↗

  1. 11 Aug 2023Received
  2. 15 Feb 2024Conditional
  3. 20 Jan 2035Approval runs out

Planning details

Status
Appeal decided
Decision
Conditional · 15 Feb 2024
Reference
2360212
Received
11 Aug 2023
Further information
Requested 4 Oct 2023 · received 22 Nov 2023
Site
10.66 ha

1 other application within 500 m in the last year

Get the full report

Nearby 1 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Appeal

Appeal ABP-319278-24 (status unknown), not yet matched.

Zoning

P5 — Rural and agricultural

Land zoned to stay rural. New houses are restricted to demonstrated local need under the rural-housing policy of the development plan.

Protections nearby 250 m

  • Recorded monument · 4
    Embanked enclosure; Enclosure
Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.011 Sept 2026, 18:51open
Summary

2360212 is a planning application to Meath County Council for the proposed development will comprise a 170MW (electrical output) Open Cycle Gas, received on 11 Aug 2023; permission was granted with conditions on 15 Feb 2024.