Ballindery House, Ballinderry, Longwood Co. Meath
Approved in May 2023. Building started in 2024.
What’s proposed
The development consists of restoration and refurbishment of existing house which will include the following: (a) Pointing and lime plastering to all external walls. (b) Remove temporary blockwork from existing window openings and fit new double glazed timber sliding sash windows throughtout. (c) New timber floors and restoration of existing joinery internally.
Show all
(d) Refurbishment of existing roof and associated parapets. (e) Modifications to internal plan layout. (f) Lime plastering to internal walls. (g) New staircase from basement to first floor. (h) New external doors. (i) Installation of proprietary waste water treatment system and polishing filter together with all associated site works. This is a Protected Structure - ID. No. MH047-109
- 25 Jan 2023Received
- 20 Mar 2023Conditional
- 2 May 2023Final approval
- 1 Oct 2024Building started
Planning details
- Status
- Building startedi
- Decision
- Conditional · 20 Mar 2023
- Reference
- 2365
- Received
- 25 Jan 2023
- Site
- 5,522 m²
1 other application within 500 m in the last year
Get the full reportNearby 1 · 500 m · 12 months
Homes nearby
Building started
- 1 Oct 2024 · Builder told the council work was starting CN0120029MH
Zoning
Land zoned to stay rural. New houses are restricted to demonstrated local need under the rural-housing policy of the development plan.
Protections nearby 250 m
- Recorded monument · 1
Where this comes from
National planning feed (NPAD), fetched 11 Sept 2026, 18:51.
Source: National Planning Application Database · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 11 Sept 2026, 18:51 | open |
Summary
2365 is a planning application to Meath County Council for the development consists of restoration and refurbishment of existing house which will, received on 25 Jan 2023; permission was granted with conditions on 20 Mar 2023.