24273 is a planning application for permission at Stackallen , Slane , Co. Meath, received by Meath County Council on 20 Jun 2024 and first seen by Planning Register on 11 Sept 2026. The application describes: seeking a 10-year construction period, and continuous operation thereafter, for an Agricultural Biagas Renewable Energy Facility, consisting of: • 2 No. Primary Digester Tanks, • 2 No. Secondary Digestor Tanks with Pumproom, • Pasteurisation unit with auxiliary tanks, • Emergency Flare with base and security fencing, • 2 No. Agricultural Solid feeders with associated concrete bases, • 2 No. Underground Pre-reception tanks, • 2 No. Covered Agricultural Digestate Storage Tanks, • A gas Combined Heat & Power (CHP) Unit with concrete base, • Site Office/Control Building with associated staff car parking area. • Wastewater treatment system and percolating area. • Biogas upgrading treatment and compression system. • Electric Transformer and Sub-Station with security fence, • 4 No. Ammonium Sulphate Solution (ASS) Storage tanks with concrete bases • Weighbridge Additionally, the existing agriculture building on the site will change use to house: - • The agricultural feedstock storage clamp, • The Nutrient Recovery System, • The digestate drying, pelletising and storage area. Site works will include: • Construction of new access and entrance improvement works. • Installation of site lighting with security cameras. • Construction of surface Water Drainage System with storage pond and discharge system. • Construction of boundary earth bunded areas, landscaping, and boundary security fencing. Together with all ancillary works on plant area measuring 4.2 hectares and entrance road measuring 0.86 hectares. The planning application is accompanied by a Natura Impact Statement (NIS) and is located on lands measuring a total of 5.06 hectares at. No decision has been recorded yet. The five-week observation window closed on 25 Jul 2024. Within 500 m there are 3 other decided applications in the last five years.
Proposal
seeking a 10-year construction period, and continuous operation thereafter, for an Agricultural Biagas Renewable Energy Facility, consisting of: • 2 No. Primary Digester Tanks, • 2 No. Secondary Digestor Tanks with Pumproom, • Pasteurisation unit with auxiliary tanks, • Emergency Flare with base and security fencing, • 2 No. Agricultural Solid feeders with associated concrete bases, • 2 No. Underground Pre-reception tanks, • 2 No. Covered Agricultural Digestate Storage Tanks, • A gas Combined Heat & Power (CHP) Unit with concrete base, • Site Office/Control Building with associated staff car parking area. • Wastewater treatment system and percolating area. • Biogas upgrading treatment and compression system. • Electric Transformer and Sub-Station with security fence, • 4 No. Ammonium Sulphate Solution (ASS) Storage tanks with concrete bases • Weighbridge Additionally, the existing agriculture building on the site will change use to house: - • The agricultural feedstock storage clamp, • The Nutrient Recovery System, • The digestate drying, pelletising and storage area. Site works will include: • Construction of new access and entrance improvement works. • Installation of site lighting with security cameras. • Construction of surface Water Drainage System with storage pond and discharge system. • Construction of boundary earth bunded areas, landscaping, and boundary security fencing. Together with all ancillary works on plant area measuring 4.2 hectares and entrance road measuring 0.86 hectares. The planning application is accompanied by a Natura Impact Statement (NIS) and is located on lands measuring a total of 5.06 hectares at
- Status
- INCOMPLETED APPLICATION
- Decision
- N/a
- Site (from polygon)
- 5.03 ha
- Location precision
- site (coords_polygon)
Timeline
- 20 Jun 2024Decision
- 20 Jun 2024New applicationObservation window closed 25 Jul 2024

Full planning report for 53.69953, -6.61162
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 144128). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/MeathCC/AppFileRefDetails/24273/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |