Planning Register
Meath County Council · 2460842 · PERMISSION

CURRAGHTOWN , BROWNSTOWN , NAVAN

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 11 Oct 2024We first saw it 11 Sept 2026, 18:51 (701 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

2460842 is a planning application for permission at CURRAGHTOWN , BROWNSTOWN , NAVAN, received by Meath County Council on 11 Oct 2024 and first seen by Planning Register on 11 Sept 2026. The application describes: development of a 10 year planning permission for 180 Megawatt gas fired peaking power plant on a site comprising 7.87 ha. The electricity generating station will comprise • 3 no. open cycle gas turbines (OCGT) generators each consisting of an air intake filter system, exhaust stack (30m high), fin fan coolers, start transformer, power control centre, fire extinguishing cabinet; and waste process water tank. • Liquid fuel storage (secondary fuel) supply which includes; three bunded fuel storage tanks each with 1,950m3 capacity (15m diameter x 11m high). • unloading area, fuel polishing and transfer system building and fuel pipework. • Three generators and step up transformers with a single storey communication building (6.7m high). • An administration and maintenence building with an area of 800m² (9.6m high) with car parking. • Containerised power control centre (25m by 20m x 4m high). • Fire water tank of 500m3 and pumphouse. • Containerised water treatment unit (12m long x 3m wide x 3m high) with 10m3 with purified water storage tank (2.75m high and 2.27m diameter). • Lube oil and chemical storage, Emergency generator, Air compressor building (8m long x 4m wide x 4m high) and auxiliary unit transformers. • Natural gas supply which includes; Gas Networks Ireland (GNI) above ground installation (AGI), natural gas receiving facility (5m high) including pressure and temperature control, natural gas filter and natural gas pipework. • Temporary construction compound. • All associated ancillary development, including upgrades to site access from the L-10132, upgrades to exisiting site access road, new site access road, site works and services including underground pipework and cabling, drainage infrastructure, emergency backup generator, fire detection and protection system, fencing, gates, internal roadways, lighting all other ancilllary site works. It should be noted in respect of this planning application that permission is sought for a period of 40 years. The application relates to development for the purposes of an activity requiring a license from the Environmental Protection Agency under the Industrial Emissions Directive 2012/18/EU. It also relates to a Lower Tier COMAH establishment and therefore falls under the requirements of the Control of Major Accident Hazard (COMAH) Regulations, 2015. The Planning Application will be accompanied by a Natura Impact Statement (NIS). Significant further information/revised plans submitted on this application. The council granted permission on 1 Aug 2025, with conditions. The five-week observation window closed on 15 Nov 2024. The register records an appeal (ACP-323483-25). Within 500 m there are 3 other decided applications in the last five years.

Appeal window closes 29 Aug 2025 closed 380 days ago
4 weeks from the council's decision (1 Aug 2025) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

development of a 10 year planning permission for 180 Megawatt gas fired peaking power plant on a site comprising 7.87 ha. The electricity generating station will comprise • 3 no. open cycle gas turbines (OCGT) generators each consisting of an air intake filter system, exhaust stack (30m high), fin fan coolers, start transformer, power control centre, fire extinguishing cabinet; and waste process water tank. • Liquid fuel storage (secondary fuel) supply which includes; three bunded fuel storage tanks each with 1,950m3 capacity (15m diameter x 11m high). • unloading area, fuel polishing and transfer system building and fuel pipework. • Three generators and step up transformers with a single storey communication building (6.7m high). • An administration and maintenence building with an area of 800m² (9.6m high) with car parking. • Containerised power control centre (25m by 20m x 4m high). • Fire water tank of 500m3 and pumphouse. • Containerised water treatment unit (12m long x 3m wide x 3m high) with 10m3 with purified water storage tank (2.75m high and 2.27m diameter). • Lube oil and chemical storage, Emergency generator, Air compressor building (8m long x 4m wide x 4m high) and auxiliary unit transformers. • Natural gas supply which includes; Gas Networks Ireland (GNI) above ground installation (AGI), natural gas receiving facility (5m high) including pressure and temperature control, natural gas filter and natural gas pipework. • Temporary construction compound. • All associated ancillary development, including upgrades to site access from the L-10132, upgrades to exisiting site access road, new site access road, site works and services including underground pipework and cabling, drainage infrastructure, emergency backup generator, fire detection and protection system, fencing, gates, internal roadways, lighting all other ancilllary site works. It should be noted in respect of this planning application that permission is sought for a period of 40 years. The application relates to development for the purposes of an activity requiring a license from the Environmental Protection Agency under the Industrial Emissions Directive 2012/18/EU. It also relates to a Lower Tier COMAH establishment and therefore falls under the requirements of the Control of Major Accident Hazard (COMAH) Regulations, 2015. The Planning Application will be accompanied by a Natura Impact Statement (NIS). Significant further information/revised plans submitted on this application

Status
APPEALED
Decision
Conditional on 1 Aug 2025
Site (from polygon)
5,819 m²
Location precision
site (coords_polygon)

Timeline

  • 11 Oct 2024
    New application
    Observation window closed 15 Nov 2024
  • 5 Dec 2024
    Further information requested
  • 28 May 2025
    Further information received
  • 1 Aug 2025
    Decision
    Appeal window closed 29 Aug 2025
  • 25 Aug 2025
    Appeal lodged

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.64358, -6.54899

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

The register records appeal ACP-323483-25 (status unknown) but we have not matched the ACP case yet.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    • Radon risk area · 1
      About 1 in 20 homes in this area is likely to have high radon levels

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 144968). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/MeathCC/AppFileRefDetails/2460842/0.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open