2460979 is a planning application for permission at Townlands of Clonymeath and Arodstown , Summerhill , Co. Meath, received by Meath County Council on 19 Nov 2024 and first seen by Planning Register on 11 Sept 2026. The application describes: the development will consist of: (i) An extension to the permitted Clonymeath Solar Farm (Pl. Ref: 21/546, ABP Ref. 311760, Pl. Ref: 24/60288) comprising the construction and operation of a solar photovoltaic (PV) farm consisting of solar arrays on ground mounted steel frames with a maximum overall height of 3 metres above ground; (ii) 11 no. medium voltage power stations, underground electrical cabling and ducting, security fencing and CCTV stands; (iii) Provision of new internal access tracks and upgrading of existing access tracks, linking with the access track permitted under Planning Reference 21/546, ABP Reference 311760; (iv) Temporary construction compound with temporary site offices and staff facilities; (v) Construction and operational access will be provided via the existing farm entrance off the L2210, to the east of the site; (vi) The removal of the existing hedgerow and boundary wall in the field opposite the existing farm entrance to provide for sufficient sightlines; (vii) The hedgerow will be reinstated set back from the roadside to maintain the necessary sightlines; (viii) Site drainage and; (ix) All ancillary site development works and apparatus.Planning permission is sought for a period of 10 years with an operational life of 35 years from the date of commissioning. Significant further information/revised plans submitted on this application. The council granted permission on 2 May 2025, with conditions. The five-week observation window closed on 2 Jan 2025.

Appeal window closes 30 May 2025 closed 472 days ago
4 weeks from the council's decision (2 May 2025) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

the development will consist of: (i) An extension to the permitted Clonymeath Solar Farm (Pl. Ref: 21/546, ABP Ref. 311760, Pl. Ref: 24/60288) comprising the construction and operation of a solar photovoltaic (PV) farm consisting of solar arrays on ground mounted steel frames with a maximum overall height of 3 metres above ground; (ii) 11 no. medium voltage power stations, underground electrical cabling and ducting, security fencing and CCTV stands; (iii) Provision of new internal access tracks and upgrading of existing access tracks, linking with the access track permitted under Planning Reference 21/546, ABP Reference 311760; (iv) Temporary construction compound with temporary site offices and staff facilities; (v) Construction and operational access will be provided via the existing farm entrance off the L2210, to the east of the site; (vi) The removal of the existing hedgerow and boundary wall in the field opposite the existing farm entrance to provide for sufficient sightlines; (vii) The hedgerow will be reinstated set back from the roadside to maintain the necessary sightlines; (viii) Site drainage and; (ix) All ancillary site development works and apparatus.Planning permission is sought for a period of 10 years with an operational life of 35 years from the date of commissioning. Significant further information/revised plans submitted on this application

Status
APPLICATION FINALISED
Decision
Conditional on 2 May 2025
Final grant
9 Jun 2025
Permission expires
8 Jun 2035
Site (from polygon)
41.16 ha
Location precision
site (coords_polygon)

Timeline

  • 19 Nov 2024
    New application
    Observation window closed 2 Jan 2025
  • 21 Jan 2025
    Further information requested
  • 28 Feb 2025
    Further information received
  • 2 May 2025
    Decision
    Appeal window closed 30 May 2025

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.49515, -6.70127

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    • Radon risk area · 1
      About 1 in 20 homes in this area is likely to have high radon levels

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 146003). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/MeathCC/AppFileRefDetails/2460979/0.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open