PlanningRegister.ie
Meath County Council · 2560539

Athlumney Alexander Reid Ferganstown and Ballymacon, Navan, Co. Meath

Approved in Jan 2026. Building started in 2026, signed off as finished in Oct 2026.

What’s proposed

Permission for a Large-Scale Residential Development - The proposed development will consist of 223no. residential dwellings (26no. 1 -bed, 50no. 2-bed, 138no. 3-bed and 9no. 4-bed) and a crèche. The mix of residential units consists of 155no. houses (18no. 2-bed, 128no. 3-bed, 9no. 4-bed) and 68no. apartments (26no. 1-bed, 32no. 2-bed, 10no. 3-bed).

Show all

Apartments are three to four storey simplex/duplex own door apartments arranged in 5no. blocks. All housing is two storey in height. The crèche is a two storey standalone building (c.443sq.m) with allocated car parking and set down area. The proposed development includes all associated site development works including reprofiling of the site, works to an existing drainage ditch, the construction of a temporary foul water pumping station and rising main, public lighting, three ESB substations, bin and bicycle storage structures, car parking and landscaping of open space. The proposed development also provides for connections both vehicular and pedestrian to the residential development by Meath County Council known as Gort Na Glaise including the culverting part of an existing drainage ditch, removal of part of an existing hedge and existing boundary walls constructed within the Gort Na Glaise development. Provision is also made for future pedestrian/cycle connectivity to the west in keeping with Masterplan MP12. The development includes pedestrian/cycle connections onto the LRD6 and will provide a pedestrian crossing point on Old Road to the south of the application site. The development will be accessed by extending a spur off an existing roundabout junction on the new LRD 6 distributor road to the north of the application site. A portion of this spur road was previously permitted under P.A. Ref. 21-1046/ABP-312746-22. The proposed development also provides for an additional vehicular/pedestrian access to connect to the main access road proposed as part of a development to the north / north-west of the application site under P.A. Ref. 24/60415 (currently on appeal to An Bord Pleanála ABP-322341-25). A footpath and cycle path will be constructed along the western side of the application site as part of this planning application to provide access to the new development. A natura impact statement (NIS) has been prepared in respect to the proposed development and will be submitted to the planning authority with the planning application. Significant further information/revised plans submitted on this…

Cut short by the council feed. Full text ↗

  1. 27 May 2025Received
  2. 15 Oct 2025Conditional
  3. 12 Jan 2026Final approval
  4. 5 Feb 2026Building started
  5. 29 Oct 2026Signed off

Planning details

Status
Building started
Decision
Conditional · 15 Oct 2025
Reference
2560539
Received
27 May 2025
Further information
Requested 21 Jul 2025 · received 19 Aug 2025
Units
223
Site
5.78 ha

5 other applications within 500 m in the last year

Get the full report

Nearby 5 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Appeal

Appeal ACP-323854-25 (status unknown), not yet matched.

Building started

  • 5 Oct 2026 · Builder told the council work was starting CN0148317MH
  • 30 Sept 2026 · Builder told the council work was starting (seven-day notice) SN0014886MH
  • 28 Sept 2026 · Builder told the council work was starting (seven-day notice) SN0014881MH
  • 28 Sept 2026 · Builder told the council work was starting (seven-day notice) SN0014883MH
  • 28 Sept 2026 · Builder told the council work was starting (seven-day notice) SN0014880MH
  • 28 Sept 2026 · Builder told the council work was starting (seven-day notice) SN0014884MH
  • 29 Aug 2026 · Builder told the council work was starting (seven-day notice) SN0014688MH
  • 8 Apr 2026 · Builder told the council work was starting CN0140561MH
  • 13 Mar 2026 · Builder told the council work was starting CN0139588MH
  • 25 Feb 2026 · Builder told the council work was starting (seven-day notice) SN0013786MH
  • 6 Feb 2026 · Builder told the council work was starting CN0138098MH
  • 5 Feb 2026 · Builder told the council work was starting CN0138168MH
  • 5 Feb 2026 · Builder told the council work was starting CN0138171MH

Zoning

C3 — High technology

Zoned for office, research and development and high-technology manufacturing.

G1 — Open space with recreation

Open space with active recreational amenities — pitches, courts, play areas.

R1 — New residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Where this comes from

National planning feed (NPAD), fetched 3 Nov 2026, 23:01.

Source: National Planning Application Database · fetched 3 Nov 2026, 23:01
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.03 Nov 2026, 23:01open
Summary

2560539 is a planning application to Meath County Council for permission for a Large-Scale Residential Development - The proposed development will, received on 27 May 2025; permission was granted with conditions on 15 Oct 2025.