Planning Register
Meath County Council · 2561212 · PERMISSION

Upper Inny River , Townlands of Castlecor and Tully , County Meath

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 7 Nov 2025We first saw it 11 Sept 2026, 18:51 (309 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

2561212 is a planning application for permission at Upper Inny River , Townlands of Castlecor and Tully , County Meath, received by Meath County Council on 7 Nov 2025 and first seen by Planning Register on 11 Sept 2026. The application describes: The development will consist of the removal of Castlecor Weir, its associated sluice, and fish passage to restore the natural river conditions and ecological connectivity of the Upper Inny River and all associated works including: I. The reprofiling and restoration of approximately 220m of the river channel to replicate natural stream conditions and enable fish migration including via provision of a low-flow channel. This includes placement of root wads, boulders, and graded rock to replicate healthy, stable, and natural channel conditions. II. Works to Castlecor Bridge to remove the current sediment blockage which results in road flooding and enable the natural flow of sediment and long-term adaptation of the riverbed upstream, as well as installation of sleepers to manage riverbed erosion. III. Sealing of the disused Castlecor Mill headrace inflow to prevent unintended flow diversion. IV. Creation of a temporary site access via the L6813 Road, temporary internal construction road, temporary access gate, permanent internal farm track (agreed with landowner), removal of individual trees to enable construction activities, and temporary construction lay down areas/site compounds. V. Reinstatement of the disturbed lands following weir removal including landscaping consisting of seeding and planting with appropriate native vegetation, removal of temporary construction facilities, and bank stabilisation works. VI. All other associated site development works. VII. This application is accompanied by a Natura Impact Statement. The council granted permission on 8 Jan 2026, with conditions. The five-week observation window closed on 12 Dec 2025. Within 500 m there are 2 other decided applications in the last five years.

Appeal window closes 5 Feb 2026 closed 219 days ago
4 weeks from the council's decision (8 Jan 2026) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

The development will consist of the removal of Castlecor Weir, its associated sluice, and fish passage to restore the natural river conditions and ecological connectivity of the Upper Inny River and all associated works including: I. The reprofiling and restoration of approximately 220m of the river channel to replicate natural stream conditions and enable fish migration including via provision of a low-flow channel. This includes placement of root wads, boulders, and graded rock to replicate healthy, stable, and natural channel conditions. II. Works to Castlecor Bridge to remove the current sediment blockage which results in road flooding and enable the natural flow of sediment and long-term adaptation of the riverbed upstream, as well as installation of sleepers to manage riverbed erosion. III. Sealing of the disused Castlecor Mill headrace inflow to prevent unintended flow diversion. IV. Creation of a temporary site access via the L6813 Road, temporary internal construction road, temporary access gate, permanent internal farm track (agreed with landowner), removal of individual trees to enable construction activities, and temporary construction lay down areas/site compounds. V. Reinstatement of the disturbed lands following weir removal including landscaping consisting of seeding and planting with appropriate native vegetation, removal of temporary construction facilities, and bank stabilisation works. VI. All other associated site development works. VII. This application is accompanied by a Natura Impact Statement.

Status
APPLICATION FINALISED
Decision
Conditional on 8 Jan 2026
Final grant
19 Feb 2026
Permission expires
18 Feb 2031
Site (from polygon)
1.76 ha
Location precision
site (coords_polygon)

Timeline

  • 7 Nov 2025
    New application
    Observation window closed 12 Dec 2025
  • 8 Jan 2026
    Decision
    Appeal window closed 5 Feb 2026

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.77502, -7.20369

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 144582). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/MeathCC/AppFileRefDetails/2561212/0.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open