Curragha Water Treatment Plant , Knavinstown Curragha , County Meath.

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 17 Apr 2026We first saw it 11 Sept 2026, 18:51 (148 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

2660428 is a planning application for permission at Curragha Water Treatment Plant , Knavinstown Curragha , County Meath., received by Meath County Council on 17 Apr 2026 and first seen by Planning Register on 11 Sept 2026. The application describes: the development will consists of: • A 10-year planning permission for an operational life of 30 years. • Construction of a new building (9.5m x 8.5m) replacing the existing building which would be demolished (6m x 4.2m). This new building will have 3 separate compartments: chemical dosing, MCC and filtration room. In the Chemical dosing room, a 1200l chemical dosing tank will be installed in bund with within the room .2No. dosing pumps will be installed in a dosing cabinet, within the chemical dosing room. The filtration system will consist of 4 pressure filters to be installed, with its associated pipework, 2 pumps, 2 blowers and a compressor; • 2No. new pre oxidisation contact tanks (12.73m³ each) will be installed in the existing building, which is currently the filter building. The existing 2No, pressure filters in the building will be replaced by the new proposed contact tanks; • A new backwash holding tank (15.9m³) will be installed onsite to replace the existing tank but will be on a different location within the site; • The filtration process produce residual water (dirty wash water) in the process of backwashing. This water will undergo treatment (settlement and separation) before being discharged into the environment. 1 No. Equalisation precast tank (23m³), 1No. Settlement tanks (7m³) and 1 No. Sludge tank (4.75m³) will be installed within the site layout; • Demolition of existing welfare and building (To be replaced by new filter building) and holding tank on site; • Increasing boreholes output from 35m³/hr to 49m³/hr; and • Installation of new underground pipework from the boreholes onsite to the new filter building and to the residual treatment tanks. New pipework to be connected to the existing mains pipework. • Construction of hammerhead road to allow for vehicle turning for delivery trucks, improvement of site entrance, all associated ancillary works and any required landscaping. No decision has been recorded yet. The five-week observation window closed on 22 May 2026. Within 500 m there are 7 other decided applications in the last five years.

Observations close 22 May 2026 closed 113 days ago
5 weeks from receipt (17 Apr 2026) · s.34 Planning and Development Act 2000 · art. 29 Regulations 2001 · €20 to the council

Proposal

the development will consists of: • A 10-year planning permission for an operational life of 30 years. • Construction of a new building (9.5m x 8.5m) replacing the existing building which would be demolished (6m x 4.2m). This new building will have 3 separate compartments: chemical dosing, MCC and filtration room. In the Chemical dosing room, a 1200l chemical dosing tank will be installed in bund with within the room .2No. dosing pumps will be installed in a dosing cabinet, within the chemical dosing room. The filtration system will consist of 4 pressure filters to be installed, with its associated pipework, 2 pumps, 2 blowers and a compressor; • 2No. new pre oxidisation contact tanks (12.73m³ each) will be installed in the existing building, which is currently the filter building. The existing 2No, pressure filters in the building will be replaced by the new proposed contact tanks; • A new backwash holding tank (15.9m³) will be installed onsite to replace the existing tank but will be on a different location within the site; • The filtration process produce residual water (dirty wash water) in the process of backwashing. This water will undergo treatment (settlement and separation) before being discharged into the environment. 1 No. Equalisation precast tank (23m³), 1No. Settlement tanks (7m³) and 1 No. Sludge tank (4.75m³) will be installed within the site layout; • Demolition of existing welfare and building (To be replaced by new filter building) and holding tank on site; • Increasing boreholes output from 35m³/hr to 49m³/hr; and • Installation of new underground pipework from the boreholes onsite to the new filter building and to the residual treatment tanks. New pipework to be connected to the existing mains pipework. • Construction of hammerhead road to allow for vehicle turning for delivery trucks, improvement of site entrance, all associated ancillary works and any required landscaping

Status
FURTHER INFORMATION
Decision
N/a
Site (from polygon)
964 m²
Location precision
site (coords_polygon)

Timeline

  • 17 Apr 2026
    Decision
  • 17 Apr 2026
    New application
    Observation window closed 22 May 2026
  • 11 Jun 2026
    Further information requested

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.54151, -6.44180

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    OPW flood extent nearby — flag only (licence); floodinfo.ie.

    • Radon risk area · 3
      About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels
    • Recorded monument · 5
      Field system; Enclosure; Ringfort - rath

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 146369). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/MeathCC/AppFileRefDetails/2660428/0.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open