Dalystown , Longwood , Co. Meath
- 2 Jun 2026Received
- 7 Jul 2026Observations closed
- Status
- With the council, no decision yet
- Decision
- Not yet
- Council
- Meath County Council
- Type
- PERMISSION
- Site
- 2.20 ha
What’s proposed
the proposed Project includes the installation and operation of a Mobile Wash Plant for the grading and washing of aggregates. The Mobile Wash Plant will be used for grading and washing aggregates to National Standards Authority of Ireland (NSAI) Specification for use on construction projects. Aggregates will be sourced from existing stockpiles from a restoration site (PL Ref: 2360451) which bounds the area of the proposed Mobile Wash Plant. These materials will be processed through the plant and will be directed via pipeline through an existing settlement pond on site. Subsequently silts will be percolated through washed aggregates into a secondary pond for further settlement. The facility will process approximately 25,000 tonnes of material per annum, with an anticipated duration of eight years
2660659 is a planning application to Meath County Council for the proposed Project includes the installation and operation of a Mobile Wash Plant for, received on 2 Jun 2026; no decision has been recorded yet.
Planning details
- Reference
- 2660659
- Local authority
- Meath County Council
- Status
- With the council, no decision yet · register status “FURTHER INFORMATION”
- Received
- 2 Jun 2026
- Observations close
- 7 Jul 2026 (closed 70 days ago)
- Decision due
- No due date published
- Decision
- Not decided
- Proposed development
- the proposed Project includes the installation and operation of a Mobile Wash Plant for the grading and washing of aggregates. The Mobile Wash Plant will be used for grading and washing aggregates to National Standards Authority of Ireland (NSAI) Specification for use on construction projects. Aggregates will be sourced from existing stockpiles from a restoration site (PL Ref: 2360451) which bounds the area of the proposed Mobile Wash Plant. These materials will be processed through the plant and will be directed via pipeline through an existing settlement pond on site. Subsequently silts will be percolated through washed aggregates into a secondary pond for further settlement. The facility will process approximately 25,000 tonnes of material per annum, with an anticipated duration of eight yearsAs published by the register.
- Site area
- 2.20 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 53.50192, -6.89960
Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 146602). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/MeathCC/AppFileRefDetails/2660659/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |