Friarspark 6th Division , Trim , Co. Meath
- 22 Feb 2018Received
- 17 Apr 2018Conditional
- 23 May 2018Final grant
- 27 Oct 2023Commenced
- 22 May 2028Permission expires
- Status
- Commenced
- Decision
- Conditional · 17 Apr 2018
- Council
- Meath County Council
- Type
- PERMISSION
- Site
- 78 m²
What’s proposed
the development will consist of solar PV arrays with a surface area of approximately 31,000m2 mounted on steel support structures, associated underground cabling and ducting, grid control building, 2 No. inverter/transformer cabins, 2 no. battery enclosures, site entrance, access tracks, hardstanding area, boundary security fence, CCTV, landscaping and ancillary works. The solar PV arrays will have a height above ground level of up to 3m and an export electrical capacity of up to 4 megawatts. An appropriate period of 10 years (i.e. duration of the planning permission to construct the development) is sought, with an operational life of 25 years after that date of commissioning
TA180167 is a planning application to Meath County Council for the development will consist of solar PV arrays with a surface area of approximately, received on 22 Feb 2018; permission was granted with conditions on 17 Apr 2018.
Planning details
- Reference
- TA180167
- Local authority
- Meath County Council
- Status
- Commenced · register status “APPLICATION FINALISED”
- Received
- 22 Feb 2018
- Observations close
- 29 Mar 2018 (closed 3101 days ago)
- Decision due
- 18 Apr 2018 · decided 17 Apr 2018
- Decision
- Conditional on 17 Apr 2018
- Proposed development
- the development will consist of solar PV arrays with a surface area of approximately 31,000m2 mounted on steel support structures, associated underground cabling and ducting, grid control building, 2 No. inverter/transformer cabins, 2 no. battery enclosures, site entrance, access tracks, hardstanding area, boundary security fence, CCTV, landscaping and ancillary works. The solar PV arrays will have a height above ground level of up to 3m and an export electrical capacity of up to 4 megawatts. An appropriate period of 10 years (i.e. duration of the planning permission to construct the development) is sought, with an operational life of 25 years after that date of commissioningAs published by the register.
- Site area
- 78 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 2 applications within 500 m in the last 5 years
Appeal
Not appealed.
Commencement
- Seven day notice SN0009383MH
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 152399). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/MeathCC/AppFileRefDetails/TA180167/0.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |