TRASCAN & CLONDOOLUSK , COUNTY OFFALY
- 11 Dec 2019Received
- 24 Jan 2020Observations closed
- Status
- Withdrawn or invalid
- Decision
- Not yet
- Council
- Offaly County Council
- Type
- PERMISSION
- Site
- 88.77 ha
What’s proposed
A SOLAR FARM ON A TOTAL SITE AREA OF APPROXIMATELY 86. 7 HECTARES (HA), CONSISTING OF PHOTOVOLTAIC PANELS ON GROUND MOUNTED STEEL FRAMES WITH ASSOCIATED CABLING AND DUCTING; 40 NO. SINGLE STOREY INVERTER STATIONS; 4 NO. STEEL STORAGE CONTAINERS; PERIMETER FENCING; SECURITY GATES; PERMEABLE GRAVEL ACCESS TRACK; 36 NO. ONSITE POLE MOUNTED CCTV CAMERAS C. 3M IN HEIGHT; 2 NO. TEMPORARY CONSTRUCTION COMPOUND/MATERIAL STORAGE AREA; 2 NO. TEMPORARY CONSTRUCTION STAGE MOBY DICK TYPE WHEELWASH SYSTEMS (WITH OVERHEAD SETTLEMENT TANK); AND ALL ASSOCIATED ANCILLARY DEVELOPMENT SERVICES AND WORKS. PERMISSION IS SOUGHT FOR THE PROPOSED SOLAR FARM FOR A PERIOD OF 10 YEARS WITH AN OPERATIONAL PERIOD OF 40 YEARS. A NATURA IMPACT STATEMENT (NIS) IS SUBMITTED WITH THE PLANNING APPLICATION. AN APPLICATION TO OBTAIN PERMISSION FOR THE DEVELOPMENT OF TRANSMISSION INFRASTRUCTURE WHICH CONSISTS OF A 110 KILOVOLT (KV) SUBSTATION AND ASSOCIATED GRID CONNECTION TO FACILITATE THE EXPORT OF POWER FROM THE SOLAR FARM WILL BE SUBMITTED TO AN BORD PLEANALA
19589 is a planning application to Offaly County Council for a SOLAR FARM ON A TOTAL SITE AREA OF APPROXIMATELY 86. 7 HECTARES (HA), CONSISTING OF, received on 11 Dec 2019; the file is recorded as deemed withdrawn.
Planning details
- Reference
- 19589
- Local authority
- Offaly County Council
- Status
- Withdrawn or invalid · register status “DEEMED WITHDRAWN”
- Received
- 11 Dec 2019
- Observations close
- 24 Jan 2020 (closed 2432 days ago)
- Decision due
- No due date published
- Decision
- Not decided
- Proposed development
- A SOLAR FARM ON A TOTAL SITE AREA OF APPROXIMATELY 86. 7 HECTARES (HA), CONSISTING OF PHOTOVOLTAIC PANELS ON GROUND MOUNTED STEEL FRAMES WITH ASSOCIATED CABLING AND DUCTING; 40 NO. SINGLE STOREY INVERTER STATIONS; 4 NO. STEEL STORAGE CONTAINERS; PERIMETER FENCING; SECURITY GATES; PERMEABLE GRAVEL ACCESS TRACK; 36 NO. ONSITE POLE MOUNTED CCTV CAMERAS C. 3M IN HEIGHT; 2 NO. TEMPORARY CONSTRUCTION COMPOUND/MATERIAL STORAGE AREA; 2 NO. TEMPORARY CONSTRUCTION STAGE MOBY DICK TYPE WHEELWASH SYSTEMS (WITH OVERHEAD SETTLEMENT TANK); AND ALL ASSOCIATED ANCILLARY DEVELOPMENT SERVICES AND WORKS. PERMISSION IS SOUGHT FOR THE PROPOSED SOLAR FARM FOR A PERIOD OF 10 YEARS WITH AN OPERATIONAL PERIOD OF 40 YEARS. A NATURA IMPACT STATEMENT (NIS) IS SUBMITTED WITH THE PLANNING APPLICATION. AN APPLICATION TO OBTAIN PERMISSION FOR THE DEVELOPMENT OF TRANSMISSION INFRASTRUCTURE WHICH CONSISTS OF A 110 KILOVOLT (KV) SUBSTATION AND ASSOCIATED GRID CONNECTION TO FACILITATE THE EXPORT OF POWER FROM THE SOLAR FARM WILL BE SUBMITTED TO AN BORD PLEANALAAs published by the register.
- Site area
- 88.77 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 6 applications within 500 m in the last 5 years
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 445691). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/OffalyCC/AppFileRefDetails/19589/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |