COOLCOR , RHODE , CO OFFALY

  1. 23 Jun 2020Received
  2. 6 May 2021Conditional
  3. 22 Jun 2021Final grant
  4. 21 Jun 2026Permission expires
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Granted with conditions
Decision
Conditional · 6 May 2021
Council
Offaly County Council
Type
PERMISSION
Site
2.85 ha

What’s proposed

DEVELOPMENT OF A COMBINED HEAT AND POWER GENERATING BIOMASS GASIFICATION PLANT WITH INTEGRATED CARBON CAPTURE AND UTILISATION TECHNOLOGY TO PROVIDE RENWABLE ENERGY AND ELECTRICAL GRID SUPPORT SERVICES ON A 2.45-HECTARE SITE. THE DEVELOPMENT WILL COMPRISE: (I) OPEN AREA FEEDSTOCK RECEPTION BUNKERS (GROSS AREA OF 425.58SQM), WHICH WILL PROVIDE FOR THE INTAKE AND TEMPORARY STORAGE OF BIOMASS MATERIAL FOR GASIFICATION, (II) OFFICE, WELFARE AND CONTROL ROOM BUILDING (GROSS AREA OF 110.90SQM AND 5.145M), (III) GASIFICATION PLANT (GROSS AREA OF 1,178SQM AND HEIGHT OF 20.87M)) WHICH WILL CONVERT BIOMASS INTO SYNTHETIC GAS (SYNGAS), (IV) GASIFICATION CONTROL BUILDING (GROSS AREA OF 36.97SQM AND HEIGHT OF 3.05M), (V) METHANATION UNIT (GROSS AREA OF 429SQM AND HEIGHT OF 12.83M) WHICH WILL CONVERT SYNGAS INTO RENEWABLE GAS (RNG), (VI) RNG FILLING AREA (GROSS AREA OF 451.63SQM), (VII) 2NO. BUNDED THERMAL ENERGY STORAGE TANKS (GROSS AREA OF 78.12SQM AND HEIGHT OF 10M), (VIII) GAS ENGINE COMPOUND (GROSS AREA OF 246.44SQM) CONTAINING 5NO. CONTAINERISED COMBINED HEAT AND POWER (CHP) GAS ENGINES (EACH 5.55M IN HEIGHT), (IX) ELECTRICAL SUBSTATION (GROSS AREA OF 910.8SQM) CONTAINING SWITCHYARD, ESB SUBSTATION BUILDING (GROSS AREA OF 110.62SQM AND HEIGHT OF 5.96M), ANCILLARY ELECTRICAL PLANT AND BUNDED TRANSFORMER WHICH WILL ELECTRICALLY CONNECT THE DEVELOPMENT TO THE EXISTING 110KV DERRYIRON SUBSTATION LOCATED ON LANDS TO THE SOUTH OF THE DEVELOPMENT SITE, (X) AN OPEN AREA COMPOUND CONTAINING SOLID OXIDE FUEL ELECTROLYSIS CELL (SOFEC) ENCLOSURES WHICH WILL CONVERT CARBON DIOXIDE, STEAM AND METHANE INTO RENEWABLE ENERGY, (XI) 2NO. STORE CONTAINERS, CONTAINERISED STEAM ENGINE AND CONTAINERISED HEAT RECOVERY PLANT (EACH OF GROSS AREA OF 29.77M AND HEIGHT OF 2.9M), (XII) SYNGAS AND FUEL STORAGE TANKS (GROSS AREA OF 295SQM), AND (XIII) ALL ANCILLARY DEVELOPMENT, INCLUDING; PERIMETER LANDSCAPED SOIL BERMS WITH TREE SCREENING, PERIMETER FENCING WITH ACCESS GATE AT PRIMARY VEHICLE SITE ENTRANCE WHICH WILL CONNECT THE DEVELOPMENT TO THE EXISTING ROADS OF THE ADJACENT RHODE BUSINESS PARK PROVIDING ACCESS TO THE R400, CAR PARKING, LIGHTING, INTERNAL ACCESS ROADS, WEIGHBRIDGE, CARBON FILTER, PROCESS WATER AND FIREFIGHTING WATER STORAGE TANKS AND ALL CIVIL ENGINEERING WORKS FOR THE DISPOSAL OF FOUL AND SURFACE WATER. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND ACCOMPANIES THE PLANNING APPLICATION

20237 is a planning application to Offaly County Council for dEVELOPMENT OF A COMBINED HEAT AND POWER GENERATING BIOMASS GASIFICATION PLANT WITH, received on 23 Jun 2020; permission was granted with conditions on 6 May 2021.

Planning details

Reference
20237
Local authority
Offaly County Council
Status
Granted with conditions · register status “APPLICATION FINALISED
Received
23 Jun 2020
Observations close
28 Jul 2020 (closed 2243 days ago)
Decision due
6 May 2021 · decided 6 May 2021
Decision
Conditional on 6 May 2021
Proposed development
DEVELOPMENT OF A COMBINED HEAT AND POWER GENERATING BIOMASS GASIFICATION PLANT WITH INTEGRATED CARBON CAPTURE AND UTILISATION TECHNOLOGY TO PROVIDE RENWABLE ENERGY AND ELECTRICAL GRID SUPPORT SERVICES ON A 2.45-HECTARE SITE. THE DEVELOPMENT WILL COMPRISE: (I) OPEN AREA FEEDSTOCK RECEPTION BUNKERS (GROSS AREA OF 425.58SQM), WHICH WILL PROVIDE FOR THE INTAKE AND TEMPORARY STORAGE OF BIOMASS MATERIAL FOR GASIFICATION, (II) OFFICE, WELFARE AND CONTROL ROOM BUILDING (GROSS AREA OF 110.90SQM AND 5.145M), (III) GASIFICATION PLANT (GROSS AREA OF 1,178SQM AND HEIGHT OF 20.87M)) WHICH WILL CONVERT BIOMASS INTO SYNTHETIC GAS (SYNGAS), (IV) GASIFICATION CONTROL BUILDING (GROSS AREA OF 36.97SQM AND HEIGHT OF 3.05M), (V) METHANATION UNIT (GROSS AREA OF 429SQM AND HEIGHT OF 12.83M) WHICH WILL CONVERT SYNGAS INTO RENEWABLE GAS (RNG), (VI) RNG FILLING AREA (GROSS AREA OF 451.63SQM), (VII) 2NO. BUNDED THERMAL ENERGY STORAGE TANKS (GROSS AREA OF 78.12SQM AND HEIGHT OF 10M), (VIII) GAS ENGINE COMPOUND (GROSS AREA OF 246.44SQM) CONTAINING 5NO. CONTAINERISED COMBINED HEAT AND POWER (CHP) GAS ENGINES (EACH 5.55M IN HEIGHT), (IX) ELECTRICAL SUBSTATION (GROSS AREA OF 910.8SQM) CONTAINING SWITCHYARD, ESB SUBSTATION BUILDING (GROSS AREA OF 110.62SQM AND HEIGHT OF 5.96M), ANCILLARY ELECTRICAL PLANT AND BUNDED TRANSFORMER WHICH WILL ELECTRICALLY CONNECT THE DEVELOPMENT TO THE EXISTING 110KV DERRYIRON SUBSTATION LOCATED ON LANDS TO THE SOUTH OF THE DEVELOPMENT SITE, (X) AN OPEN AREA COMPOUND CONTAINING SOLID OXIDE FUEL ELECTROLYSIS CELL (SOFEC) ENCLOSURES WHICH WILL CONVERT CARBON DIOXIDE, STEAM AND METHANE INTO RENEWABLE ENERGY, (XI) 2NO. STORE CONTAINERS, CONTAINERISED STEAM ENGINE AND CONTAINERISED HEAT RECOVERY PLANT (EACH OF GROSS AREA OF 29.77M AND HEIGHT OF 2.9M), (XII) SYNGAS AND FUEL STORAGE TANKS (GROSS AREA OF 295SQM), AND (XIII) ALL ANCILLARY DEVELOPMENT, INCLUDING; PERIMETER LANDSCAPED SOIL BERMS WITH TREE SCREENING, PERIMETER FENCING WITH ACCESS GATE AT PRIMARY VEHICLE SITE ENTRANCE WHICH WILL CONNECT THE DEVELOPMENT TO THE EXISTING ROADS OF THE ADJACENT RHODE BUSINESS PARK PROVIDING ACCESS TO THE R400, CAR PARKING, LIGHTING, INTERNAL ACCESS ROADS, WEIGHBRIDGE, CARBON FILTER, PROCESS WATER AND FIREFIGHTING WATER STORAGE TANKS AND ALL CIVIL ENGINEERING WORKS FOR THE DISPOSAL OF FOUL AND SURFACE WATER. A NATURA IMPACT STATEMENT (NIS) HAS BEEN PREPARED AND ACCOMPANIES THE PLANNING APPLICATION
As published by the register.
Site area
2.85 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Around this site this application first, then everything within 500 m

Explore from here
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 53.36123, -7.21658

Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.

No account, no payment. Not a statutory planning search.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 446995). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/OffalyCC/AppFileRefDetails/20237/0.

    Source: npad · fetched 18 Sept 2026, 15:44
    SourceLicenceFetchedLink
    npadCC-BY-4.018 Sept 2026, 15:44open