BROUGHAL AND DRINAGH , CO OFFALY

  1. 6 Oct 2021Received
  2. 29 Sept 2022Conditional
  3. 10 Nov 2022Final grant
  4. 9 Nov 2032Permission expires
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Granted with conditions
Decision
Conditional · 29 Sept 2022
Council
Offaly County Council
Type
PERMISSION
Site
31.18 ha

What’s proposed

A 10 YEAR PERMISSION FOR THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 25MW COMPRISING OF CA.55,000 NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 10 NO. POWER HUBS (CA. 15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 1 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 7 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING, LANDSCAPING, A NEW SITE ENTRANCE AND ALL ANCILLARY WORKS. THE TOTAL DEVELOPMENT AREA WIL BE CA. 31.1HA. AN NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION

21622 is a planning application to Offaly County Council for a 10 YEAR PERMISSION FOR THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM, received on 6 Oct 2021; permission was granted with conditions on 29 Sept 2022.

Planning details

Reference
21622
Local authority
Offaly County Council
Status
Granted with conditions · register status “APPLICATION FINALISED
Received
6 Oct 2021
Observations close
10 Nov 2021 (closed 1773 days ago)
Decision due
29 Sept 2022 · decided 29 Sept 2022
Decision
Conditional on 29 Sept 2022
Proposed development
A 10 YEAR PERMISSION FOR THE CONSTRUCTION OF A SOLAR PV DEVELOPMENT WITH A MAXIMUM EXPORT CAPACITY (MEC) OF UP TO 25MW COMPRISING OF CA.55,000 NO. PHOTOVOLTAIC PANELS LAID OUT IN ARRAYS, ALONG WITH ANCILLARY DEVELOPMENT INCLUDING: 10 NO. POWER HUBS (CA. 15.25M2 X 2.4M) WHICH INCORPORATE AN INVERTER AND A TRANSFORMER, 1 NO. SINGLE STOREY COMMUNICATIONS BUILDING (11.1M2 X 2.5M), 1 NO. SINGLE STOREY CLIENT SIDE SUB-STATION BUILDING (15.25M2 X 2.9M), 1 NO. SINGLE STOREY EQUIPMENT STORAGE BUILDING (7.5M2 X 2.7M), 7 NO. CCTV CAMERAS MOUNTED ON 4M HIGH POLES, PERIMETER SECURITY FENCING, LANDSCAPING, A NEW SITE ENTRANCE AND ALL ANCILLARY WORKS. THE TOTAL DEVELOPMENT AREA WIL BE CA. 31.1HA. AN NATURA IMPACT STATEMENT (NIS) WILL ACCOMPANY THE PLANNING APPLICATION
As published by the register.
Site area
31.18 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Around this site this application first, then everything within 500 m

Explore from here
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 53.18798, -7.80077

Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.

No account, no payment. Not a statutory planning search.

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 449843). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/OffalyCC/AppFileRefDetails/21622/0.

    Source: npad · fetched 18 Sept 2026, 15:44
    SourceLicenceFetchedLink
    npadCC-BY-4.018 Sept 2026, 15:44open