Daingean Road (L2025), Cappancur Tullamore, Co. Offaly
Approved in Oct 2023. Building started in 2024.
- 13 Oct 2022Received
- 16 May 2023Conditional
- 3 Oct 2023Final approval
- 16 Apr 2024Building started
Planning details
- Status
- Building startedi
- Decision
- Conditional · 16 May 2023
- Reference
- 22523
- Received
- 13 Oct 2022
- Further information
- Requested 7 Dec 2022 · received 8 Mar 2023
- Units
- 62
- Site
- 5.34 ha
What’s proposed
A LARGE-SCALE RESIDENTIAL DEVELOPMENT (LRD). THE PROPOSED DEVELOPMENT WILL CONSIST OF 102 NO. DWELLINGS IN A MIX OF HOUSES, DUPLEX AND APARTMENT DWELLINGS. A TOTAL OF 62 NO. HOUSES ARE PROPOSED IN DETACHED, SEMI-DETACHED AND TERRACED FORMAT ALL 2 STOREY IN HEIGHT AND RANGING IN SIZE FROM 2 - 4 BEDROOMS. THE BALANCE OF DWELLINGS I.E. 40 NO.
Show all
COMPRISE A MIX OF APARTMENT/DUPLEX DWELLINGS THAT ARE ACCOMMODATED IN 4 SEPARATE 3 STOREY BUILDINGS LOCATED IN THE NORTHERN AND WESTERN PART OF THE SITE. APARTMENT /DUPLEX DWELLINGS RANGE IN SIZE FROM 1 NO. TO 3 NO. BEDROOMS, WITH BALCONIES PROVIDED AT UPPER FLOOR LEVEL. THE PROPOSED DEVELOPMENT ALSO PROVIDES PUBLIC OPEN SPACE AREAS TO SERVE THE DEVELOPMENT. A CRÈCHE IS ALSO PROPOSED TO SERVE THE DEVELOPMENT ITSELF AND THE WIDER AREA. THE CRÈCHE IS ACCOMMODATED IN A SINGLE STOREY L-SHAPED BUILDING WITH A STATED GROSS FLOOR AREA OF 382 SQ.M WITH ASSOCIATED OUTDOOR AMENITY/PLAY AREAS. A TOTAL OF 173 NO. SURFACE CAR PARKING SPACES IN ADDITION TO ENCLOSED BICYCLE STANDS SERVING THE APARTMENT/DUPLEX BUILDINGS AND THE PROPOSED CRÈCHE ARE ALSO PROVIDED. A NEW VEHICULAR ACCESS TO THE SITE IS PROPOSED OFF DAINGEAN ROAD AND THE DEVELOPMENT ALSO PROVIDES FOR THE CONSTRUCTION OF A SECTION OF NEW FOOTPATH AND CYCLE PATH ALONG THE SITE FRONTAGE (APPROXIMATELY 300M) TO TIE IN WITH EXISTING PEDESTRIAN AND CYCLE INFRASTRUCTURE TO THE WEST. THE PROPOSED DEVELOPMENT ALSO INCLUDES THE PROVISION OF A NEW WASTEWATER PUMPING STATION IN THE CENTRAL PART OF THE SITE AND THE CONSTRUCTION OF NEW SURFACE WATER AND WASTE WATER INFRASTRUCTURE ALONG A SECTION OF DAINGEAN ROAD, TO THE WEST OF THE APPLICATION SITE. THE PROPOSED DEVELOPMENT ALSO PROVIDES FOR ALL LANDSCAPING AND BOUNDARY TREATMENTS; PUBLIC LIGHTING; AN ESB SUB-STATION; UNDERGROUNDING OF ESB POWERLINES AND THE REPOSITIONING OF A 38KV PYLON WITHIN THE SITE; AND ALL SITE DEVELOPMENT WORKS, INCLUDING ALTERATIONS TO SITE LEVELS. A NATURA IMPACT STATEMENT (NIS) HAS BEEN UNDERTAKEN IN RESPECT OF THE PROPOSED LRD AND IS INCLUDED WITH THE APPLICATION. THE APPLICATION MAY ALSO BE INSPECTED ONLINE AT THE FOLLOWING WEBSITE SET UP BY THE APPLICANT…
Cut short by the council feed. Full text ↗
1 other application within 500 m in the last year
Open the reportNearby 1 · 500 m · 12 months
- GrantedCAPPINCUR ROAD , TULLAMORE , CO. OFFALY
- GrantedCappincur Industrial Estate , Cappincur , Tullamore Co. Offaly
- WithdrawnCappincur Industrial Estate , Cappincur , Tullamore Co. Offaly
- WithdrawnCappincur Industrial Estate , Cappincur , Tullamore Co. Offaly
- GrantedDaingean Road , Tullamore , Co. Offaly
- GrantedThe Witterings , Daingean Road , Tullamore Co. Offaly
- RefusedCappincur Industrial Estate , Cappincur , Tullamore Co. Offaly
- GrantedCAPPANCUR FILLING STATION CAPPANCUR , TULLAMORE , CO. OFFALY
- GrantedCAPPANCUR , TULLAMORE , CO. OFFALY
- RefusedDAINGEAN ROAD CAPPUNCUR , TULLAMORE , CO. OFFALY
- WithdrawnCAPPANCUR , TULLAMORE , CO. OFFALY
- WithdrawnDAINGEAN ROAD , TULLAMORE , CO. OFFALY
- GrantedDAINGEAN ROAD BOGTOWN CAPPINCUR , TULLAMORE , CO. OFFALY
- GrantedAES BORD NA MÓNA CAPPINCUR INDUSTRIAL ESTATE , CAPPINCUR TULLAMORE , CO. OFFALY R35 HP93
Homes nearby
- For sale57 Whitehall, Tullamore, Co. Offaly, R35 KD98
- For saleAbramis, 11 Whitehall, Tullamore, Co. Offaly, R35 XK07
- For sale91 Whitehall Estate, Tullamore, Co. Offaly, R35 KV59
- For salePuttaghaun, Tullamore, Co. Offaly, R35 T455
- For saleScotts Avenue Development, Scotts Avenue, Tyrells Road, Puttaghan, Tullamore, Co. Offaly
- For sale13 Harbour Drive, Tullamore, Co. Offaly, R35 HH93
Appeal
Appeal ABP-317318-23 (status unknown), not yet matched.
Building started
- 22 Apr 2024 · Builder told the council work was starting CN0113784OY
- 16 Apr 2024 · Builder told the council work was starting (seven-day notice) SN0010024OY
- 16 Apr 2024 · Builder told the council work was starting (seven-day notice) SN0010026OY
- 16 Apr 2024 · Builder told the council work was starting (seven-day notice) SN0010027OY
- 16 Apr 2024 · Builder told the council work was starting (seven-day notice) SN0010028OY
Zoning
Zoned for office, research and development and high-technology manufacturing.
Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.
Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.
An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.
Land zoned for housing. Expect infill, extensions and — on larger plots — apartment or scheme applications that accord with the objective.
Protections nearby 250 m
- NIAH-recorded building · 2
Where this comes from
National planning feed (NPAD), fetched 3 Nov 2026, 23:01.
Source: National Planning Application Database · fetched 3 Nov 2026, 23:01
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 3 Nov 2026, 23:01 | open |
Summary
22523 is a planning application to Offaly County Council for a large-scale residential development (lrd). the proposed development will consist of, received on 13 Oct 2022; permission was granted with conditions on 16 May 2023.