Approved in Mar 2023. Building started in 2024.
- 21 Dec 2022Received
- 23 Feb 2023Conditional
- 30 Mar 2023Final approval
- 16 May 2024Building started
Planning details
- Status
- Building startedi
- Decision
- Conditional · 23 Feb 2023
- Reference
- 22664
- Received
- 21 Dec 2022
- Site
- 1.05 ha
What’s proposed
EIRGRID PLC (WITH THE CONSENT AND APPROVAL OF THE ELECTRICITY SUPPLY BOARD (ESB)), INTENDS TO APPLY FOR PERMISSION FOR DEVELOPMENT AT SITE OF APPROXIMATELY 1 HECTARE AT DERRYIRON 110KV SUBSTATION, CLONIN, RHODE, CO. OFFALY.
Show all
DEVELOPMENT CONSISTING OF WORKS TO UPGRADE THE EXISTING SUBSTATION INCLUDING: THE INSTALLATION OF ADDITIONAL AIR INSULATED SWITCHGEAR ELECTRICAL APPARATUS (APPROXIMATELY 7M IN HEIGHT) TO FACILITATE THE PROVISION OF A 110KV BUSBAR; INSTALLATION OF 3 NO. ADDITIONAL BAYS (EACH CONSISTING OF BUSBAR DISCONNECTS, SECTIONALISERS, CIRCUIT BREAKERS, CURRENT TRANSFORMERS, VOLTAGE TRANSFORMERS, LINE TRAPS, COUPLING CAPACITORS AND OTHER ELECTRICAL APPARATUS); AN EXTENSION TO THE NORTH OF THE EXISTING CONTROL BUILDING (APPROXIMATELY 73 SQUARE METERS) TO PROVIDE ACCOMMODATION FOR CABINETS, OTHER ELECTRICAL APPARATUS AND A BATTERY ROOM; INSTALLATION OF 2 NO. CIRCUIT BYPASS ARRANGEMENTS (APPROXIMATELY 14M AND APPROXIMATELY 4M IN HEIGHT, RESPECTIVELY) TO FACILITATE NORMAL OPERATION OF THE SUBSTATION DURING CONSTRUCTION; AND AN EXTENSION TO THE HARDSTAND COMPOUND (APPROXIMATELY 0.03 HECTARES). THE DEVELOPMENT WILL ALSO CONSIST OF: ALL ANCILLARY AND ASSOCIATED ELECTRICAL WORKS TO FACILITATE THE PROPOSED DEVELOPMENT; AND ALL OTHER ASSOCIATED SITE EXCAVATION, INFRASTRUCTURAL AND SITE DEVELOPMENT WORKS ABOVE AND BELOW GROUND, INCLUDING SITE PREPARATION WORKS, SITE CLEARANCE AND LEVELLING; HARDSTANDING, INTERNAL ACCESS TRACKS AND TEMPORARY CONSTRUCTION COMPOUND; EARTHGRID, SURFACE WATER DRAINAGE NETWORK; PALISADE FENCING (APPROXIMATELY 2.7M HIGH) AND GATES; AND LANDSCAPING
5 other applications within 500 m in the last year · 1 open for comments
Open the reportNearby 5 · 500 m · 12 months
- OpenClonin Coolcor , Rhode , Co. Offaly
- WithdrawnClonin Coolcor , Rhode , Co. Offaly
- GrantedCoolcor , Rhode , County Offaly
- WithdrawnCoolcor , Rhode , County Offaly
- GrantedCOOLCOR AND CLONIN , RHODE , CO. OFFALY
- GrantedClonin , Rhode , Co. Offaly
- WithdrawnClonin , Rhode , Co. Offaly
- CommencedCoolcor , Rhode , Co. Offaly
- WithdrawnCoolcor , Rhode , Co. Offaly
- GrantedCoolcor , Rhode , County Offaly
- WithdrawnCoolcor , Rhode , County Offaly
- Grantedin the townlands of Clonin , & Coolcor , Rhode Co. Offaly
- GrantedClonin Rhode , Co. Offaly , Ireland
- WithdrawnClonin , Co. Offaly , Ireland
- WithdrawnCLONIN , CO. OFFALY
Homes nearby
Building started
- 16 May 2024 · Builder told the council work was starting (seven-day notice) SN0010358OY
Where this comes from
National planning feed (NPAD), fetched 18 Sept 2026, 15:44.
Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 18 Sept 2026, 15:44 | open |
Summary
22664 is a planning application to Offaly County Council for eirgrid plc (with the consent and approval of the electricity supply board (esb)), received on 21 Dec 2022; permission was granted with conditions on 23 Feb 2023.