PlanningRegister.ie
Offaly County Council · 2295

Chapel Lane, Clara, Co. Offaly

Approved in May 2022. Building started in 2022.

  1. 1 Mar 2022Received
  2. 22 Apr 2022Conditional
  3. 30 May 2022Final approval
  4. 9 Dec 2022Building started
Status
Building startedi
Decision
Conditional · 22 Apr 2022
Council
Offaly County Council
Type
PERMISSION
Units
1
Site
804 m²

What’s proposed

THE CONSTRUCTION OF A TWO-STOREY DWELLING, DOMESTIC OUTBUILDING, A PEDESTRIAN AND VEHICULAR ENTRANCE, PARKING, LANDSCAPING AND ALL ASSOCIATED SITEWORKS. THE PROPOSED DEVELOPMENT WILL COMPRISE OF THE CARRYING OUT OF WORKS WITHIN THE CURTILAGE OF A PROTECTED STRUCTURE LISTED UNDER RECORD OF PROTECTED STRUCTURES IN THE COUNTY OFFALY DEVELOPMENT PLAN (RPS REF. 12-57)

Planning details

Reference
2295
Local authority
Offaly County Council
Status
Commenced · register status “APPLICATION FINALISED”
Received
1 Mar 2022
Decision due
25 Apr 2022 · decided 22 Apr 2022
Decision
Conditional on 22 Apr 2022
Site area
804 m² from the mapped boundary, not the council's figure

Live near Chapel Lane?

Everything else planned on your street, in one report.

Check my street
Council register ↗

Nearby 4 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Building started

  • 9 Dec 2022 · Builder told the council work was starting (opted out of the finish sign-off) CN0096283OY

Zoning

M1 — Metro / rail economic corridor

A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

  • NIAH-recorded building · 16
    Saint Brigid's Catholic Church; house

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2295 is a planning application to Offaly County Council for the construction of a two-storey dwelling, domestic outbuilding, a pedestrian and, received on 1 Mar 2022; permission was granted with conditions on 22 Apr 2022.