Offaly County Council · 2460137

Kilbeggan Road , Clara , Co. Offaly

  1. 22 Apr 2024Received
  2. 8 Oct 2024Conditional
  3. 12 Nov 2024Final grant
  4. 11 Nov 2034Permission expires
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Granted with conditions
Decision
Conditional · 8 Oct 2024
Council
Offaly County Council
Type
PERMISSION
Site
7.80 ha

What’s proposed

a 10 year permission for the refurbishment of the existing St. Brigid’s Convent building, demolition of existing ball wall and rear extensions, the construction of a 2-storey extension to the rear of the existing building on a phased basis providing, dressing rooms and associated facilities, toilets, storage, plant room, gym, and the erection of a spectator stand, ball wall and all-weather training area. The development will also incorporate the provision of carparking, paths, paving, walking track lighting, floodlighting, alterations to pitches, ball stops, dug-outs, landscaping, fencing and railings, foul sewer drainage, surface water drainage to a soakaway on site, and all associated site development works to complete the development. The proposed development includes works to a Protected Structure, St. Brigid’s Convent, OCC RPS No. 12-016, NIAH Reg No. 14802011

2460137 is a planning application to Offaly County Council for a 10 year permission for the refurbishment of the existing St. Brigid’s Convent, received on 22 Apr 2024; permission was granted with conditions on 8 Oct 2024.

Planning details

Reference
2460137
Local authority
Offaly County Council
Status
Granted with conditions · register status “APPLICATION FINALISED
Received
22 Apr 2024
Observations close
27 May 2024 (closed 845 days ago)
Decision due
9 Oct 2024 · decided 8 Oct 2024
Decision
Conditional on 8 Oct 2024
Proposed development
a 10 year permission for the refurbishment of the existing St. Brigid’s Convent building, demolition of existing ball wall and rear extensions, the construction of a 2-storey extension to the rear of the existing building on a phased basis providing, dressing rooms and associated facilities, toilets, storage, plant room, gym, and the erection of a spectator stand, ball wall and all-weather training area. The development will also incorporate the provision of carparking, paths, paving, walking track lighting, floodlighting, alterations to pitches, ball stops, dug-outs, landscaping, fencing and railings, foul sewer drainage, surface water drainage to a soakaway on site, and all associated site development works to complete the development. The proposed development includes works to a Protected Structure, St. Brigid’s Convent, OCC RPS No. 12-016, NIAH Reg No. 14802011
As published by the register.
Site area
7.80 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 25 applications within 500 m in the last 5 years

Show all 25

Explore this area on the map →

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 448531). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/OffalyCC/AppFileRefDetails/2460137/0.

    Source: npad · fetched 18 Sept 2026, 15:44
    SourceLicenceFetchedLink
    npadCC-BY-4.018 Sept 2026, 15:44open