Rin , Ferbane , County Offaly
- 29 Jul 2024Received
- 2 Sept 2024Observations closed
- Status
- Withdrawn or invalid
- Decision
- Not yet
- Council
- Offaly County Council
- Type
- PERMISSION
- Site
- 3.61 ha
What’s proposed
•The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. •All associated ancillary infrastructure and preparatory works such as provision of the site entrance. The power rating associated with the proposed wind turbine is 4.5 megawatts (MW). The proposed Project will have a 30-year lifespan
2460288 is a planning application to Offaly County Council for •The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an, received on 29 Jul 2024; the file is recorded as incompleted application.
Planning details
- Reference
- 2460288
- Local authority
- Offaly County Council
- Status
- Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
- Received
- 29 Jul 2024
- Observations close
- 2 Sept 2024 (closed 746 days ago)
- Decision due
- No due date published
- Decision
- Not decided
- Proposed development
- •The construction of one Enercon E138 Wind Energy Converter on an 81m tower with an electrical rating of 4.5MW and an overall tip height of 149.38m. •Installation of the hardstanding area for the Wind Energy Converter. •Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. •Construction of the proposed substation building which will be located c. 340m from the proposed wind energy converter and surrounded by stock proof fencing. It will be a single storey building, measuring 53m2 and c. 5m in height. •Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. •All associated ancillary infrastructure and preparatory works such as provision of the site entrance. The power rating associated with the proposed wind turbine is 4.5 megawatts (MW). The proposed Project will have a 30-year lifespanAs published by the register.
- Site area
- 3.61 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 53.22963, -7.76259
Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 448278). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/OffalyCC/AppFileRefDetails/2460288/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |