PlanningRegister.ie
Offaly County Council · 2560112

Arden Lane, Ardan, Tullamore Co. Offaly

Approved in Dec 2025. No sign of building yet.

  1. 4 Apr 2025Received
  2. 31 Dec 2025Conditional
  3. 28 May 2031Approval runs out
Status
Appeal decided — granted
Decision
Conditional · 31 Dec 2025
Council
Offaly County Council
Type
PERMISSION
Units
1
Site
1.91 ha

Open on the full map →

Live near Arden Lane?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

In plain English

Construction of a new hospice building on Arden Lane

The applicant wants to build a new 3,805m2 palliative care unit. This includes 20 in-patient bedrooms and daycare facilities.

  • Includes 80 car parking spaces and 30 covered bicycle spaces
  • Building height varies between 1 and 2 storeys
  • Requires road upgrades to a portion of Arden Lane
  • Includes a new foul pumping station and ESB sub-station
Written by AI from the council’s description

An AI model rewrote the council’s description below in everyday words on 9 Oct 2026. It was told to use only that text, and every number it wrote was checked against it. It says nothing about whether the application will be approved. The council’s wording and planning file are the record.

The council’s description

The development consisting of a new Midlands Specialist Palliative Care Unit on a greenfield site accessible from Arden Lane, Tullamore. The development will consist of the construction of a new hospice (3,805m2), with all associated site development works, including road upgrades to a portion of Arden Lane, a site entrance, 80no. car parking spaces for staff and visitors, including 7no. accessible parking bays, and 30no. covered bicycle parking spaces. The new part 1-storey and 2-storey building will provide 20no. in-patient bedrooms, daycare facilities along with associated administrative areas and all ancillary spaces. New drainage connections (including a new foul pumping station), surface water attenuation and associated site services including provision of a service building and new ESB sub-station. Landscaping, boundary treatments, external lighting and all related site development works. Road upgrades to a portion of Arden Lane to provide for a two-way carriageway and footpath, street lighting, and new utilities to extend to the site from a new junction with a Distributor Road, and all associated site works

Planning details

Reference
2560112
Local authority
Offaly County Council
Status
Appeal decided — granted · register status “APPLICATION FINALISED”
Received
4 Apr 2025
Decision due
1 Jan 2026 · decided 31 Dec 2025
Decision
Conditional on 31 Dec 2025
Site area
1.91 ha from the mapped boundary, not the council's figure

Nearby 9 · 500 m · 5 years

Show all 9

Explore this area on the map →

Homes nearby

Appeal

Appeal PL-500695-OY-26 (status unknown), not yet matched.

Zoning

C2.1 — Economic development and employment

Zoned for employment uses. Housing is not the intended use here.

G5 — Open space and amenity

Land zoned to stay open — parks, playing fields, amenity corridors. Built development is very hard to justify, which also means the view is protected.

R1 — New residential

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

  • Recorded monument · 4
    Ringfort - rath; Ring-ditch

Where this comes from

National planning feed (NPAD), fetched 21 Oct 2026, 02:10.

Source: National Planning Application Database · fetched 21 Oct 2026, 02:10
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.021 Oct 2026, 02:10open
Summary

2560112 is a planning application to Offaly County Council for the development consisting of a new Midlands Specialist Palliative Care Unit on a, received on 4 Apr 2025; permission was granted with conditions on 31 Dec 2025.