Clonarrow or Riverlyons , and Killoneen , Co. Offaly.
- 1 May 2025Received
- 5 Jun 2025Observations closed
- Status
- Withdrawn or invalid
- Decision
- Not yet
- Council
- Offaly County Council
- Type
- PERMISSION
- Site
- 29.63 ha
What’s proposed
the dev.will incl.the following main components:•Erection of 4wind turbines;The candidate wind turbines for T1, T2 and T4 have a rotor diameter of 150m, a hub height of 105m and a tip height of 180m. The candidate wind turbine for T3 has a rotor diameter of 117m,a hub height of 91.5m & a tip height of 150m;•Construction of permanent Turbine Hardstands & Turbine Foundations;•Construction of new permanent internal Access Tracks & upgrade of existing internal Access Tracks;•Development of an internal site drainage network & sediment control systems;•Construction of a permanent 38kV Onsite Substation with surrounding palisade fence 2.6m in height;•Installation of battery arrays located within container units (4 no. units) and associated electrical plant for grid stabilisation adjacent to Onsite Substation building with surrounding palisade fence 2.6m in height;•All associated internal underground electrical &communications cabling connecting the wind turbines to the Onsite Substation;•All associated site development works including soil excavation, spoil storage & biodiversity enhancement measures;•Installation of a meteorological mast (32m in height) for monitoring wind speeds, set in a 5m x 5m reinforced concrete foundation with surrounding paladin fence 2.4m in height;•Installation of a Relay Mast (to re-route the Three Ireland radio link between Mount Lucas and Curragh) 19.8m in height including lightning protection rods set in an 8m x 8m reinforced concrete foundation with surrounding paladin fence 2.4m in height with an adjacent outdoor cabinet on a 3m x 2m concrete base;•Temporary Road widening and strengthening works at the R402 and L50203 junction to accommodate abnormal load deliveries;•Existing bridge on L50203 (ITM 650044E, 727144N) to be permanently upgraded to accommodate abnormal load deliveries;•Temporary bridge & temporary local access road to facilitate local traffic while the bridge upgrade works are being carried out;•Upgrade of an existing Site entrance located on a private road off the L50203; and•Construction of a Temporary Construction Compound with associated temporary site offices, parking areas, security fencing welfare facilities & wastewater holding tank. An additional Temporary Construction Compound will be constructed for the bridge upgrade & temporary bridge works. A 10 year planning permission & 35year operational life from the date of commissioning of the entire wind farm is being sought. EIAR & NIS accompany this application
2560151 is a planning application to Offaly County Council for the dev.will incl.the following main components:•Erection of 4wind turbines;The, received on 1 May 2025; the file is recorded as incompleted application.
Planning details
- Reference
- 2560151
- Local authority
- Offaly County Council
- Status
- Withdrawn or invalid · register status “INCOMPLETED APPLICATION”
- Received
- 1 May 2025
- Observations close
- 5 Jun 2025 (closed 471 days ago)
- Decision due
- No due date published
- Decision
- Not decided
- Proposed development
- the dev.will incl.the following main components:•Erection of 4wind turbines;The candidate wind turbines for T1, T2 and T4 have a rotor diameter of 150m, a hub height of 105m and a tip height of 180m. The candidate wind turbine for T3 has a rotor diameter of 117m,a hub height of 91.5m & a tip height of 150m;•Construction of permanent Turbine Hardstands & Turbine Foundations;•Construction of new permanent internal Access Tracks & upgrade of existing internal Access Tracks;•Development of an internal site drainage network & sediment control systems;•Construction of a permanent 38kV Onsite Substation with surrounding palisade fence 2.6m in height;•Installation of battery arrays located within container units (4 no. units) and associated electrical plant for grid stabilisation adjacent to Onsite Substation building with surrounding palisade fence 2.6m in height;•All associated internal underground electrical &communications cabling connecting the wind turbines to the Onsite Substation;•All associated site development works including soil excavation, spoil storage & biodiversity enhancement measures;•Installation of a meteorological mast (32m in height) for monitoring wind speeds, set in a 5m x 5m reinforced concrete foundation with surrounding paladin fence 2.4m in height;•Installation of a Relay Mast (to re-route the Three Ireland radio link between Mount Lucas and Curragh) 19.8m in height including lightning protection rods set in an 8m x 8m reinforced concrete foundation with surrounding paladin fence 2.4m in height with an adjacent outdoor cabinet on a 3m x 2m concrete base;•Temporary Road widening and strengthening works at the R402 and L50203 junction to accommodate abnormal load deliveries;•Existing bridge on L50203 (ITM 650044E, 727144N) to be permanently upgraded to accommodate abnormal load deliveries;•Temporary bridge & temporary local access road to facilitate local traffic while the bridge upgrade works are being carried out;•Upgrade of an existing Site entrance located on a private road off the L50203; and•Construction of a Temporary Construction Compound with associated temporary site offices, parking areas, security fencing welfare facilities & wastewater holding tank. An additional Temporary Construction Compound will be constructed for the bridge upgrade & temporary bridge works. A 10 year planning permission & 35year operational life from the date of commissioning of the entire wind farm is being sought. EIAR & NIS accompany this applicationAs published by the register.
- Site area
- 29.63 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 3 applications within 500 m in the last 5 years
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 450915). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/OffalyCC/AppFileRefDetails/2560151/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |