South Dublin County Council · LRD23A/0011 · Permission

Within the townland of Newcastle South, Newcastle, And along Athgoe Road & Hazelhatch Road (R405) to (Ground Investigations Ireland premises), Co. Dublin.

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 19 Feb 2024We first saw it 11 Sept 2026, 18:51 (936 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

LRD23A/0011 is a planning application for permission at Within the townland of Newcastle South, Newcastle, And along Athgoe Road & Hazelhatch Road (R405) to (Ground Investigations Ireland premises), Co. Dublin., received by South Dublin County Council on 19 Feb 2024 and first seen by Planning Register on 11 Sept 2026. The application describes: The proposal comprises the 2nd phase (phase 2B) of a 2 phase development (first phase [phase2A] under planning reg. ref SD23A/0136 will comprise 48 no. duplex dwellings and phase 2 of Taobh Chnoic public park of c.1.74 hectares of open space, along with car parking and ancillary infrastructure) to result in an overall Phase 2 development of 179 no. dwellings (consisting of 119 no. 2 storey houses and 60 no apartments / duplex apartments in 5 no. 3 storey duplex buildings, and ancillary infrastructure). The phase 2B development will consist of the construction of 131 no. dwellings and open space as follows: A) 119 no. 2 storey houses (10 no. 2 bedroom houses, 95 no. 3 bedroom houses, 13 no. 4 bedroom houses and 1 no. 5 bedroom house. B) 12 no. apartments / duplex apartments in 1 no. 3 storey building - (6 no. 2 bedroom apartments and 6 no. 3 bedroom duplex apartments) all with terrace. C) Open space (c. 1.34 ha. in a series of open space areas) hard and soft landscaping (including public lighting & boundary treatment), communal open space for duplex apartments and apartments; along with single storey bicycle/bin stores and ESB substations; D) Vehicle access from the Athgoe Road from a new signalised junction along with upgrades to footpath and pedestrian crossing (on the Athgoe Road) as well as provision of vehicular/pedestrian/cycle link to permitted 'Graydon' (TA06S.305343) 'Newcastle Boulevard' to the East as well as 237 no car parking spaces and 94 no. bicycle spaces (4 no. motorcycle space) and all internal roads, cycleways, green routes and paths. E) Provision of surface water attenuation SuDs measures connection to water supply and provision of foul drainage infrastructure as well as an underground local pumping station (in northern pa rt of site) to Irish Water specifications and all ancillary site development / construction / landscaping works. F) The proposal also includes upgrades (to provide surface water pipe upgrades) to the surface water network along Athgoe Road and Hazelhatch Road (for c. 1.2 km). The council granted permission on 19 Mar 2024. The five-week observation window closed on 25 Mar 2024. An Coimisiún Pleanála decided appeal 319500 on 31 Jul 2024 (grant conditions). A commencement notice (SN0011800SD) was lodged on 20 Dec 2024, so works have started on site. The site is zoned G1 — open space with recreation under the South Dublin County Council development plan. The scheme is for 131 units. Within 500 m there are 33 other decided applications in the last five years and 12 appeals.

Appeal window closes 16 Apr 2024 closed 879 days ago
4 weeks from the council's decision (19 Mar 2024) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

The proposal comprises the 2nd phase (phase 2B) of a 2 phase development (first phase [phase2A] under planning reg. ref SD23A/0136 will comprise 48 no. duplex dwellings and phase 2 of Taobh Chnoic public park of c.1.74 hectares of open space, along with car parking and ancillary infrastructure) to result in an overall Phase 2 development of 179 no. dwellings (consisting of 119 no. 2 storey houses and 60 no apartments / duplex apartments in 5 no. 3 storey duplex buildings, and ancillary infrastructure). The phase 2B development will consist of the construction of 131 no. dwellings and open space as follows: A) 119 no. 2 storey houses (10 no. 2 bedroom houses, 95 no. 3 bedroom houses, 13 no. 4 bedroom houses and 1 no. 5 bedroom house. B) 12 no. apartments / duplex apartments in 1 no. 3 storey building - (6 no. 2 bedroom apartments and 6 no. 3 bedroom duplex apartments) all with terrace. C) Open space (c. 1.34 ha. in a series of open space areas) hard and soft landscaping (including public lighting & boundary treatment), communal open space for duplex apartments and apartments; along with single storey bicycle/bin stores and ESB substations; D) Vehicle access from the Athgoe Road from a new signalised junction along with upgrades to footpath and pedestrian crossing (on the Athgoe Road) as well as provision of vehicular/pedestrian/cycle link to permitted 'Graydon' (TA06S.305343) 'Newcastle Boulevard' to the East as well as 237 no car parking spaces and 94 no. bicycle spaces (4 no. motorcycle space) and all internal roads, cycleways, green routes and paths. E) Provision of surface water attenuation SuDs measures connection to water supply and provision of foul drainage infrastructure as well as an underground local pumping station (in northern pa rt of site) to Irish Water specifications and all ancillary site development / construction / landscaping works. F) The proposal also includes upgrades (to provide surface water pipe upgrades) to the surface water network along Athgoe Road and Hazelhatch Road (for c. 1.2 km).

Status
Appeal decided
Decision
Grant permission on 19 Mar 2024
Units
131
Floor area
1.42 ha
Site (from polygon)
11.16 ha
Location precision
site (coords_polygon)

Timeline

  • 12 Dec 2023
    Further information requested
  • 19 Feb 2024
    Further information received
  • 19 Feb 2024
    New application
    Observation window closed 25 Mar 2024
  • 19 Mar 2024
    Decision
    Appeal window closed 16 Apr 2024
  • 11 Apr 2024
    Appeal lodged

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.29808, -6.50522

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

ACP 319500 · Appeal - LRD · decided · Granted with conditions 31 Jul 2024
received by the Commission 11 Apr 2024 · inspector's report · board order

Commencement

  • Seven day notice SN0011800SD
    20 Dec 2024Newcastle South, Newcastle, South Dublinmatched by appeal_ref_npad

Zoning at the site

G1 — Open space with recreation

OS: To preserve and provide for open space and recreational amenities

Open space with active recreational amenities — pitches, courts, play areas.

P1 — Rural

RU: To protect and improve rural amenity and to provide for the development of agriculture

Zoned to protect agriculture, rural enterprise and biodiversity. New houses are restricted to demonstrated local need.

R1 — New residential

RES-N: To provide for new residential communities in accordance with approved area plans

Zoned for new residential communities. This is where large housing schemes are expected to go, subject to the social and physical infrastructure arriving with them.

R2 — Existing residential

RES: To protect and/or improve residential amenity

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Designations within 250 m

No OPW flood extent nearby.

  • NIAH-recorded building · 15
    farm house; water pump; Saint Finian's Catholic Church
  • Radon risk area · 5
    About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels
  • Recorded monument · 12
    Castle - motte; Church; Cross

Provenance

Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 122221). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/southdublin/application-details/65012.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open