Planning Register
South Dublin County Council · LRD25A/0002W · Permission

Units 16-21A-B, Parkmore Industrial Estate, Longmile Road, Walkinstown, Dublin 12

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 5 Jun 2025We first saw it 11 Sept 2026, 18:51 (464 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

LRD25A/0002W is a planning application for permission at Units 16-21A-B, Parkmore Industrial Estate, Longmile Road, Walkinstown, Dublin 12, received by South Dublin County Council on 5 Jun 2025 and first seen by Planning Register on 11 Sept 2026. The application describes: The development will comprise the following: Demolition of existing commercial/industrial buildings on site (c.6,711 sq.m in total). Provision of a mixed use, residential and commercial/employment development (c.49,275 sq.m GFA excluding undercroft) within 4 no. blocks ranging in height from 6 to 10 storeys. The development will provide 436 no. apartments (all with individual private open spaces) consisting of: 2 no. studios, 180 no. 1-beds, 158 no. 2-beds and 96 no. 3-beds. The development will also include: internal residential amenity spaces (c.375.3 sq.m in total); community library (c.352.1 sq.m); creche (c.359.1 sq.m), and 4 no. commercial/employment units (c.1,226.6 sq.m) comprising 2 office/co-working units (c.435.8 sq.m in total), medical centre (with ancillary pharmacy)(c.674.1 sq.m) and café (c.116.7 sq.m). • Block A - 9 to 10 storeys in height and will provide 81 no. residential units. • Block B - 9 to 10 storeys in height and will provide 137 no. residential units • Block C - 8 to 10 storeys in height and will provide 85 no. residential units • Block D - 6 storeys in height and will provide 133 no. residential units. Upgrades to the western side of the Parkmore Estate Road and along the Long Mile Road and Robinhood Road to provide a variety of pedestrian/ cyclist access points to the development and with vehicular access provided from the Estate Road with associated upgrades to the Estate entrance. The development will also include 173 no. car parking spaces within 2 no. undercroft car parks on site and including 12 no. parking spaces (for the commercial units) along the Long Mile Road frontage. Provision of 1,040 cycle parking spaces. Provision of public and communal open spaces, landscaping, boundary treatments, plant areas, waste management areas, and services provision (including ESB substations), and all associated works required to enable this development including connection to the Uisce Eireann network. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development. The council granted permission on 28 Jul 2025. The five-week observation window closed on 10 Jul 2025. An Coimisiún Pleanála decided appeal 323479 on 28 Nov 2025 (withdrawn). The site is zoned M1 — metro / rail economic corridor under the South Dublin County Council development plan. The scheme is for 436 units. Within 500 m there are 17 other decided applications in the last five years and 5 appeals.

Appeal window closes 25 Aug 2025 closed 383 days ago
4 weeks from the council's decision (28 Jul 2025) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

The development will comprise the following: Demolition of existing commercial/industrial buildings on site (c.6,711 sq.m in total). Provision of a mixed use, residential and commercial/employment development (c.49,275 sq.m GFA excluding undercroft) within 4 no. blocks ranging in height from 6 to 10 storeys. The development will provide 436 no. apartments (all with individual private open spaces) consisting of: 2 no. studios, 180 no. 1-beds, 158 no. 2-beds and 96 no. 3-beds. The development will also include: internal residential amenity spaces (c.375.3 sq.m in total); community library (c.352.1 sq.m); creche (c.359.1 sq.m), and 4 no. commercial/employment units (c.1,226.6 sq.m) comprising 2 office/co-working units (c.435.8 sq.m in total), medical centre (with ancillary pharmacy)(c.674.1 sq.m) and café (c.116.7 sq.m). • Block A - 9 to 10 storeys in height and will provide 81 no. residential units. • Block B - 9 to 10 storeys in height and will provide 137 no. residential units • Block C - 8 to 10 storeys in height and will provide 85 no. residential units • Block D - 6 storeys in height and will provide 133 no. residential units. Upgrades to the western side of the Parkmore Estate Road and along the Long Mile Road and Robinhood Road to provide a variety of pedestrian/ cyclist access points to the development and with vehicular access provided from the Estate Road with associated upgrades to the Estate entrance. The development will also include 173 no. car parking spaces within 2 no. undercroft car parks on site and including 12 no. parking spaces (for the commercial units) along the Long Mile Road frontage. Provision of 1,040 cycle parking spaces. Provision of public and communal open spaces, landscaping, boundary treatments, plant areas, waste management areas, and services provision (including ESB substations), and all associated works required to enable this development including connection to the Uisce Eireann network. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development.

Status
Final Grant
Decision
Grant permission on 28 Jul 2025
Final grant
4 Dec 2025
Permission expires
3 Dec 2030
Units
436
Floor area
4.93 ha
Site (from polygon)
1.93 ha
Location precision
site (coords_polygon)

Timeline

  • 1 May 2025
    Further information requested
  • 5 Jun 2025
    Further information received
  • 5 Jun 2025
    New application
    Observation window closed 10 Jul 2025
  • 28 Jul 2025
    Decision
    Appeal window closed 25 Aug 2025
  • 25 Aug 2025
    Appeal lodged

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.32298, -6.34521

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

ACP 323479 · Appeal - LRD · decided · Withdrawn 28 Nov 2025
received by the Commission 25 Aug 2025

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    M1 — Metro / rail economic corridor

    REGEN: To facilitate enterprise and/or residential led regeneration

    A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.

    Designations within 250 m

    OPW flood extent nearby — flag only (licence); floodinfo.ie.

    • EPA-licensed facility · 2
      Heiton Buckley Limited; Sherwin-Williams (Ireland) Limited
    • Radon risk area · 4
      About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels
    • Recorded monument · 1
      R149480

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 120444). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/southdublin/application-details/67894.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open