4055, Kingswood Avenue, Citywest Business Campus, Dublin 24, D24 HX79
- 15 Jul 2026Received
- 20 Jul 2026Withdraw the application
- Status
- Withdrawn or invalid
- Decision
- Withdraw the application · 20 Jul 2026
- Council
- South Dublin County Council
- Type
- Permission
- Site
- 6,854 m²
What’s proposed
Installation of a rooftop solar photovoltaic system on the roof of the existing building within the FAAC Electronics Limited premises. The development will have an approximate capacity of 307.2 kWp, comprising approximately 640 photovoltaic panels, within a site application area of approximately 0.669 hectares, together with associated mounting systems, electrical cabling, connection to the existing on-site electrical infrastructure, ancillary electrical equipment and all associated site development works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413), and it is important to note that the planning application may be subject to Section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with Section 34D(b), the provisions of Article 26A of the Planning and Development Regulations 2001 to 2025 shall apply
RED26A/0019W is a planning application to South Dublin County Council for installation of a rooftop solar photovoltaic system on the roof of the existing building, received on 15 Jul 2026; it was withdrawn on 20 Jul 2026.
Planning details
- Reference
- RED26A/0019W
- Local authority
- South Dublin County Council
- Status
- Withdrawn or invalid · register status “Referral”
- Received
- 15 Jul 2026
- Observations close
- 19 Aug 2026 (closed 26 days ago)
- Decision due
- 8 Sept 2026 · decided 20 Jul 2026
- Decision
- Withdraw the application on 20 Jul 2026
- Proposed development
- Installation of a rooftop solar photovoltaic system on the roof of the existing building within the FAAC Electronics Limited premises. The development will have an approximate capacity of 307.2 kWp, comprising approximately 640 photovoltaic panels, within a site application area of approximately 0.669 hectares, together with associated mounting systems, electrical cabling, connection to the existing on-site electrical infrastructure, ancillary electrical equipment and all associated site development works. This development is covered by the provisions of the Renewable Energy Directive III (Directive (EU) 2023/2413), and it is important to note that the planning application may be subject to Section 34D of the Planning and Development Act 2000, as amended. When a notice issues in accordance with Section 34D(b), the provisions of Article 26A of the Planning and Development Regulations 2001 to 2025 shall applyAs published by the register.
- Site area
- 6,854 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 53.29455, -6.41800
Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
EE: To provide for enterprise and employment related uses
Zoned for employment uses. Housing is not the intended use here.
Designations within 250 m
OPW flood extent nearby — flag only (licence); floodinfo.ie.
- Radon risk area · 3
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 119119). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/southdublin/application-details/70659.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |