Red Cow Complex, Naas Road, Dublin 12.

  1. 22 Jun 2007Received
  2. 16 Aug 2007Grant permission
  3. 23 Feb 2008Permission expires
  4. 26 Feb 2008Final grant
Status
Appeal decided — withdrawn
Decision
Grant permission · 16 Aug 2007
Council
South Dublin County Council
Type
Permission
Site
2.20 ha

What’s proposed

The proposed development will be carried out over 2 phases. Phase 1 will comprise the following: demolition of the existing Exhibition and Business Centre (c. 2,719sq.m. gross floor area (GFA) comprising business centre, exhibition room, warehouse and ancillary areas; existing Red Cow Hotel entrance lobby (c.44sq.m.); and existing substation (c. 40sq.m.); construction of a six storey (including roof level) car park building (c. 17,755sq.m. GFA excluding basement area) over semi-basement area) over semi-basement (c. 1,845sq.m. with 1,041 no. parking bays (44 of which are disabled parking), 70 no. bicycle parking spaces and ancillary areas; construction of a new 2 storey Nightclub building (c. 1,073 sq.m. GFA) adjacent to the existing Red Cow Inn building with dance areas, bars, east facing terraces and balcony (c. 121sq.m. total), goods delivery access at the east elevation and ancillary areas; construction of a new Hotel and Conference building within the existing surface car park area to the north of the existing Hotel building: this building comprises 17 storey (16 floors plus mezzanine floor) over basement at the western corner of the site, 6 storey over basement wing along Naas Road and a 2 storey over basement wing along Turnpike Road. The Phase 1 Hotel and Conference building will include: a Hotel Leisure Centre (c. 705 sq.m. GFA) at basement level with swimming pool, gym, saunas, steam room, treatment centre, changing rooms and shower areas; Conference Centre (c. 3,598sq.m. GFA) with main conference room (c. 1,505sq.m.), first floor gallery (c. 580sq.m.), foyer, bar areas, first floor south facing roof garden (c. 223sq.m.) ancillary areas; 10 no. Meeting Rooms with reception and ancillary areas at ground floor level (c. 581sq.m. GFA); Restaurant and Bar areas (c.1,377sq.m. GFA) comprising ground floor hotel bar (c.355sq.m. GFA) with west facing terrace (c.54sq.m.), 1st floor hotel restaurant (c. 556sq.m. GFA) with west facing terrace (c.25sq.m.) and public restaurants (c.466 sq.m. GFA) at 15th and 16th floors with south facing terrace (c.53sq.m.); Hotel Accommodation (c.9,856sq.m. GFA) comprising 310 no. hotel bedrooms (all en-suite) with 26 no. bedrooms at 1st floor level, 39 no. bedrooms at 2nd floor level, 44 no. bedrooms each at 3rd and 4th floor levels, 31 no. bedrooms at 5th floor level, and 14 no. bedrooms each at 6th to 14th floor levels. Ancillary developments as part of Phase 1 include the following: a covered walkway between the proposed car park and the main entrance to the new Hotel and Conference building; glazed canopy between the new and existing Hotel buildings; revised internal road layout; 14 no. taxi parking spaces; private coach set down areas; pedestrian crossing; landscaping and external lighting schemes. Phase 2 of the proposed development will comprise the following: demolition of the existing Red Cow Hotel building (c. 8,051sq.m. including basement) comprising 128 no. hotel bedrooms; restaurant and bar areas; conference/banquet suite; meeting rooms and ancillary areas; construction of an 8 storey over basement wing with single storey conference extension to the Phase 1 Hotel and Conference building and comprising the following: Conference Centre extension (c. 2,100sq.m. GFA) with second conference room (c. 1,302sq.m.), extended foyer and bar area and ancillary areas; a Business Centre (c.526sq.m. GFA) at ground floor level with 8 no. meetings, reception and ancillary areas; additional Hotel Accommodation (c.5,596sq.m. GFA) comprising 201 no. hotel bedrooms (all en-suite) with 31 no. bedrooms each at 1st floor to 5th floor levels and 23 no. bedrooms each at 6th and 7th floor levels. Ancillary developments as part of Phase 2 include the following: redesign of the covered walkway and glazed canopy; redesign of the internal road layout to include underpassing of the Phase 2 Hotel wing; redesign of the taxi parking areas and creation of an additional 2 no. parking spaces; alterations to Phase 1 landscaping scheme to include the creation of a Plaza; alterations to the external lighting scheme. Ancillary areas throughout the Phase 1 and 2 Hotel and Conference buildings include: Foyer and Lounge areas (c.939sq.m. GFA); Staff and Administration areas (c.657sq.m. GFA); and ancillary areas (kitchens, WCs, services, storage, plant, switch rooms, water storage, lifts, stairs, fire escapes, deliveries, goods handling, waste management and general circulation) (c.9,989sq.m. GFA). All ancillary site development works. Plant is located on the roof of the proposed Hotel and Conference building. The 1no. ESB substation proposed for demolition as part of Phase 1 will be replaced with 2 substations. The roof height above ground floor level of the overall proposed development will range from c.6.9 metres (nightclub) to c.55.5 metres (17 storey tall building element). the existing vehicular entrances to the site will be maintained with the Naas Road entrance to be used by incoming traffic only. The total proposed gross floor area for both phases including multi-storey Car Park but excluding basement areas is c.52,277sq.m. (total basement area is c7,423sq.m.). The total gross floor area of Phase 1 is c41,572sq.m. (total basement area is c.6,219sq.m.) and Phase 2 is c.10,705sq.m. (total basement area is c.1,204sq.m.). Overall Hotel Accommodation gross floor area (both phases) is c.15,452sq.m. with a total of 511 no. hotel bedrooms. The total gross floor area proposed for demolition (both phases) is c.10,854sq.m. The existing Red Cow Inn building (c.3,098sq.m.GFA) and existing uses will not be altered as part of this application. The planning application is accompanied by an Environmental Impact Statement (EIS)

SD06A/0927 is a planning application to South Dublin County Council for the proposed development will be carried out over 2 phases. Phase 1 will comprise the, received on 22 Jun 2007; permission was granted on 16 Aug 2007.

Planning details

Reference
SD06A/0927
Local authority
South Dublin County Council
Status
Appeal decided — withdrawn · register status “Appeal decided”
Received
22 Jun 2007
Observations close
27 Jul 2007 (closed 7003 days ago)
Decision due
16 Aug 2007 · decided 16 Aug 2007
Decision
Grant permission on 16 Aug 2007
Proposed development
The proposed development will be carried out over 2 phases. Phase 1 will comprise the following: demolition of the existing Exhibition and Business Centre (c. 2,719sq.m. gross floor area (GFA) comprising business centre, exhibition room, warehouse and ancillary areas; existing Red Cow Hotel entrance lobby (c.44sq.m.); and existing substation (c. 40sq.m.); construction of a six storey (including roof level) car park building (c. 17,755sq.m. GFA excluding basement area) over semi-basement area) over semi-basement (c. 1,845sq.m. with 1,041 no. parking bays (44 of which are disabled parking), 70 no. bicycle parking spaces and ancillary areas; construction of a new 2 storey Nightclub building (c. 1,073 sq.m. GFA) adjacent to the existing Red Cow Inn building with dance areas, bars, east facing terraces and balcony (c. 121sq.m. total), goods delivery access at the east elevation and ancillary areas; construction of a new Hotel and Conference building within the existing surface car park area to the north of the existing Hotel building: this building comprises 17 storey (16 floors plus mezzanine floor) over basement at the western corner of the site, 6 storey over basement wing along Naas Road and a 2 storey over basement wing along Turnpike Road. The Phase 1 Hotel and Conference building will include: a Hotel Leisure Centre (c. 705 sq.m. GFA) at basement level with swimming pool, gym, saunas, steam room, treatment centre, changing rooms and shower areas; Conference Centre (c. 3,598sq.m. GFA) with main conference room (c. 1,505sq.m.), first floor gallery (c. 580sq.m.), foyer, bar areas, first floor south facing roof garden (c. 223sq.m.) ancillary areas; 10 no. Meeting Rooms with reception and ancillary areas at ground floor level (c. 581sq.m. GFA); Restaurant and Bar areas (c.1,377sq.m. GFA) comprising ground floor hotel bar (c.355sq.m. GFA) with west facing terrace (c.54sq.m.), 1st floor hotel restaurant (c. 556sq.m. GFA) with west facing terrace (c.25sq.m.) and public restaurants (c.466 sq.m. GFA) at 15th and 16th floors with south facing terrace (c.53sq.m.); Hotel Accommodation (c.9,856sq.m. GFA) comprising 310 no. hotel bedrooms (all en-suite) with 26 no. bedrooms at 1st floor level, 39 no. bedrooms at 2nd floor level, 44 no. bedrooms each at 3rd and 4th floor levels, 31 no. bedrooms at 5th floor level, and 14 no. bedrooms each at 6th to 14th floor levels. Ancillary developments as part of Phase 1 include the following: a covered walkway between the proposed car park and the main entrance to the new Hotel and Conference building; glazed canopy between the new and existing Hotel buildings; revised internal road layout; 14 no. taxi parking spaces; private coach set down areas; pedestrian crossing; landscaping and external lighting schemes. Phase 2 of the proposed development will comprise the following: demolition of the existing Red Cow Hotel building (c. 8,051sq.m. including basement) comprising 128 no. hotel bedrooms; restaurant and bar areas; conference/banquet suite; meeting rooms and ancillary areas; construction of an 8 storey over basement wing with single storey conference extension to the Phase 1 Hotel and Conference building and comprising the following: Conference Centre extension (c. 2,100sq.m. GFA) with second conference room (c. 1,302sq.m.), extended foyer and bar area and ancillary areas; a Business Centre (c.526sq.m. GFA) at ground floor level with 8 no. meetings, reception and ancillary areas; additional Hotel Accommodation (c.5,596sq.m. GFA) comprising 201 no. hotel bedrooms (all en-suite) with 31 no. bedrooms each at 1st floor to 5th floor levels and 23 no. bedrooms each at 6th and 7th floor levels. Ancillary developments as part of Phase 2 include the following: redesign of the covered walkway and glazed canopy; redesign of the internal road layout to include underpassing of the Phase 2 Hotel wing; redesign of the taxi parking areas and creation of an additional 2 no. parking spaces; alterations to Phase 1 landscaping scheme to include the creation of a Plaza; alterations to the external lighting scheme. Ancillary areas throughout the Phase 1 and 2 Hotel and Conference buildings include: Foyer and Lounge areas (c.939sq.m. GFA); Staff and Administration areas (c.657sq.m. GFA); and ancillary areas (kitchens, WCs, services, storage, plant, switch rooms, water storage, lifts, stairs, fire escapes, deliveries, goods handling, waste management and general circulation) (c.9,989sq.m. GFA). All ancillary site development works. Plant is located on the roof of the proposed Hotel and Conference building. The 1no. ESB substation proposed for demolition as part of Phase 1 will be replaced with 2 substations. The roof height above ground floor level of the overall proposed development will range from c.6.9 metres (nightclub) to c.55.5 metres (17 storey tall building element). the existing vehicular entrances to the site will be maintained with the Naas Road entrance to be used by incoming traffic only. The total proposed gross floor area for both phases including multi-storey Car Park but excluding basement areas is c.52,277sq.m. (total basement area is c7,423sq.m.). The total gross floor area of Phase 1 is c41,572sq.m. (total basement area is c.6,219sq.m.) and Phase 2 is c.10,705sq.m. (total basement area is c.1,204sq.m.). Overall Hotel Accommodation gross floor area (both phases) is c.15,452sq.m. with a total of 511 no. hotel bedrooms. The total gross floor area proposed for demolition (both phases) is c.10,854sq.m. The existing Red Cow Inn building (c.3,098sq.m.GFA) and existing uses will not be altered as part of this application. The planning application is accompanied by an Environmental Impact Statement (EIS)
As published by the register.
Site area
2.20 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 28 applications within 500 m in the last 5 years

Show all 28

Explore this area on the map →

Homes nearby

Development land nearby

From Buildable, our sister site for development land in Dublin.

See all development land near here →

Appeal

The register records appeal PL06S.225311 (Appeal decided) but we have not matched the ACP case yet.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    M1 — Metro / rail economic corridor

    REGEN: To facilitate enterprise and/or residential led regeneration

    A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.

    Designations within 250 m

    No OPW flood extent nearby.

    • EPA-licensed facility · 4
      Proposed Facility at GaelSafe Ltd.; Sorundon Ltd t/a Irish Environmental Services; SRCL Limited
    • Radon risk area · 2
      About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels
    • Recorded monument · 2
      Kiln - lime; R187639

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 120127). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/southdublin/application-details/30639.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open