Approved in Apr 2019. Building started.

  1. 4 Mar 2019Received
  2. 1 Apr 2019Refuse permission
  3. 29 Apr 2019Appealed
  4. 29 Aug 2019Approval runs out
  5. 2 Sept 2019Appeal: Approved with conditions
  6. 17 May 2021Building started
Status
Building started
Decision
Refuse permission · 1 Apr 2019
Council
South Dublin County Council
Type
Permission
Site
3,513 m²
Appeal
ACP 304332 · Approved with conditions

Live near Buglers Ballyboden House?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

(I) Construction of a single storey extension (219.9sq.m) to rear of existing public house comprising additional bar and seating area, enclosed smoking area, new ground floor w.c. and new rear entrance from existing car park; (II) Provision of beer garden along the southern elevation of the existing public house; (III) Construction of covered smoking area along the northern elevation of the existing public house; (IV) Erection of single storey storage unit (100sq.m) ancillary to the public house; (V) Provision of new vehicular entrance from rear carpark to serve storage unit; (VI) Change of use of existing male bathroom to provide additional kitchen pace (14sq.m); And all ancillary works necessary to facilitate the proposed development including boundary treatments and landscaping

Planning details

Reference
SD18A/0255
Local authority
South Dublin County Council
Status
Commenced · register status “Officer Allocation”
Received
4 Mar 2019
Observations close
8 Apr 2019 (closed 2741 days ago)
Decision due
31 Mar 2019 · decided 1 Apr 2019
Decision
Refuse permission on 1 Apr 2019
Proposed development
(I) Construction of a single storey extension (219.9sq.m) to rear of existing public house comprising additional bar and seating area, enclosed smoking area, new ground floor w.c. and new rear entrance from existing car park; (II) Provision of beer garden along the southern elevation of the existing public house; (III) Construction of covered smoking area along the northern elevation of the existing public house; (IV) Erection of single storey storage unit (100sq.m) ancillary to the public house; (V) Provision of new vehicular entrance from rear carpark to serve storage unit; (VI) Change of use of existing male bathroom to provide additional kitchen pace (14sq.m); And all ancillary works necessary to facilitate the proposed development including boundary treatments and landscaping
As published by the register.
Site area
3,513 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 87 · 500 m · 5 years

Show all 87

Explore this area on the map →

Homes nearby

Development land nearby

From Buildable, our sister site for development land in Dublin.

See all development land near here →

Appeal

ACP 304332 · Planning Appeal · decided · Approved with conditions 2 Sept 2019
received by the Commission 29 Apr 2019 · inspector's report · board order

Building started

  • 17 May 2021 · Builder told the council work was starting (seven-day notice) SN0006041SD

Zoning

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • NIAH-recorded building · 3
    milestone/milepost; Bolton Hall
  • Radon risk area · 1
    About 1 in 20 homes in this area is likely to have high radon levels

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open
Summary

SD18A/0255 is a planning application to South Dublin County Council for (I) Construction of a single storey extension (219.9sq.m) to rear of existing public, received on 4 Mar 2019; permission was refused on 1 Apr 2019.