Planning Register
South Dublin County Council · SD20A/0121 · Permission

Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 16 Jul 2020We first saw it 11 Sept 2026, 18:51 (2249 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

SD20A/0121 is a planning application for permission at Townlands within Grange Castle South Business Park, Baldonnel, Dublin 22, received by South Dublin County Council on 16 Jul 2020 and first seen by Planning Register on 11 Sept 2026. The application describes: Permission for a period of ten years for development at this site of 16.5 hectares that is located within lands in the Grange Castle South Business Park and includes the residential property of Ballybane, Old Nangor Road on land within the townlands of Milltown; Ballybane and; Aungierstown and Ballybane; and bounding Baldonnel Road to the west; both the Old and New Nangor Road to the north; and Grange Castle South Access Road to the South, Baldonnel, Dublin 22. The development will consist of the following: (1) The demolition of the existing two storey dwelling of Ballybane and associated farm buildings (565sq.m) and the construction of 3 two storey data centres with mezzanine floors at each level of each facility and associated ancillary development that will have a gross floor area of 80,269sq.m on an overall site of 16.5hectares. (2) 1 two storey data centre (Building A) that will be located to the south-west of the site and will have a gross floor area of 28,573sq.m. and will include 26 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts which will be located above the northern end of each emergency generator that will measure 20m in height. (3) 1 two storey data centre (Building B) which will be located to the north-west of the site, and to the immediate north of Building A and will have a gross floor area of 21,725sq.m and which will include 18 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 18 ventilation shafts which will be located above the southern end of each emergency generator that will measure 20m in height. (4) 1 two storey data centre (Building C) which will be constructed last, will be located to the eastern part of the site on a north-south axis and will have a gross floor area of 28,573sq.m. It will include 26 emergency generators located at ground floor level within a compound to the western side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts that will be located above the western end of each emergency generator that will measure 20m in height. (5) Each of the three data centres will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces. Each data centre will also include a diesel tank and a refuelling area to serve the proposed emergency generators. (6) The overall height of each data centre apart from the flues and plant at roof level is c. 19.85m above the finished floor level. (7) 1 temporary and single storey substation (29sq.m). (8) 3 single storey MV buildings (each 249sq.m - 747sq.m in total) which manage the supply of electricity from the substations to each data centre and are located to the immediate west of the generator compound within buildings A and B, and to the south of the generator compound withing building C. (9) 8 prefabricated containerised electrical rooms (65sq.m each and 520sq.m overall) that are stacked in pairs to the immediate south of the temporary substation. (10) Ancillary site development works, which will include attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables which will include the drilling and laying of ducts and cables under Baldonnel stream. Other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, service road, entrance gate, sprinkler tank house (72sq.m), security hut (30sq.m) and 150 car parking spaces and 78 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west. The development will be accessed from the Grange Castle South Access Road from the south via the Baldonnel Road. An Environmental Impact Assessment Report (EIAR) has been submitted with this application. The council granted permission on 29 Jul 2020. The five-week observation window closed on 20 Aug 2020. A commencement notice (SN0010998SD) was lodged on 20 Sept 2024, so works have started on site. The site is zoned C2.1 — economic development and employment under the South Dublin County Council development plan. Within 500 m there are 13 other decided applications in the last five years.

Appeal window closes 26 Aug 2020 closed 2208 days ago
4 weeks from the council's decision (29 Jul 2020) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

Permission for a period of ten years for development at this site of 16.5 hectares that is located within lands in the Grange Castle South Business Park and includes the residential property of Ballybane, Old Nangor Road on land within the townlands of Milltown; Ballybane and; Aungierstown and Ballybane; and bounding Baldonnel Road to the west; both the Old and New Nangor Road to the north; and Grange Castle South Access Road to the South, Baldonnel, Dublin 22. The development will consist of the following: (1) The demolition of the existing two storey dwelling of Ballybane and associated farm buildings (565sq.m) and the construction of 3 two storey data centres with mezzanine floors at each level of each facility and associated ancillary development that will have a gross floor area of 80,269sq.m on an overall site of 16.5hectares. (2) 1 two storey data centre (Building A) that will be located to the south-west of the site and will have a gross floor area of 28,573sq.m. and will include 26 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts which will be located above the northern end of each emergency generator that will measure 20m in height. (3) 1 two storey data centre (Building B) which will be located to the north-west of the site, and to the immediate north of Building A and will have a gross floor area of 21,725sq.m and which will include 18 emergency generators located at ground floor level within a compound to the northern side of the data centre with associated flues that will be 25m in height. The facility will also include 18 ventilation shafts which will be located above the southern end of each emergency generator that will measure 20m in height. (4) 1 two storey data centre (Building C) which will be constructed last, will be located to the eastern part of the site on a north-south axis and will have a gross floor area of 28,573sq.m. It will include 26 emergency generators located at ground floor level within a compound to the western side of the data centre with associated flues that will be 25m in height. The facility will also include 26 ventilation shafts that will be located above the western end of each emergency generator that will measure 20m in height. (5) Each of the three data centres will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces. Each data centre will also include a diesel tank and a refuelling area to serve the proposed emergency generators. (6) The overall height of each data centre apart from the flues and plant at roof level is c. 19.85m above the finished floor level. (7) 1 temporary and single storey substation (29sq.m). (8) 3 single storey MV buildings (each 249sq.m - 747sq.m in total) which manage the supply of electricity from the substations to each data centre and are located to the immediate west of the generator compound within buildings A and B, and to the south of the generator compound withing building C. (9) 8 prefabricated containerised electrical rooms (65sq.m each and 520sq.m overall) that are stacked in pairs to the immediate south of the temporary substation. (10) Ancillary site development works, which will include attenuation ponds and the installation and connection to the underground foul and storm water drainage network and installation of utility ducts and cables which will include the drilling and laying of ducts and cables under Baldonnel stream. Other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, service road, entrance gate, sprinkler tank house (72sq.m), security hut (30sq.m) and 150 car parking spaces and 78 sheltered bicycle parking spaces. The development will be enclosed with landscaping to all frontages including a wetland to the west. The development will be accessed from the Grange Castle South Access Road from the south via the Baldonnel Road. An Environmental Impact Assessment Report (EIAR) has been submitted with this application.

Status
Officer Allocation
Decision
Grant permission on 29 Jul 2020
Final grant
3 Sept 2020
Floor area
8.03 ha
Site (from polygon)
16.41 ha
Location precision
site (coords_polygon)

Timeline

  • 14 Jul 2020
    Further information requested
  • 16 Jul 2020
    Further information received
  • 16 Jul 2020
    New application
    Observation window closed 20 Aug 2020
  • 29 Jul 2020
    Decision
    Appeal window closed 26 Aug 2020

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.31826, -6.45199

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

Not appealed.

Commencement

  • Seven day notice SN0010998SD
    20 Sept 2024New Nangor Road, Lucan, South Dublinmatched by ref_exact
  • Seven day notice SN0010941SD
    20 Sept 2024New Nangor Road, Lucan, South Dublinmatched by ref_exact
  • Commencement notice CN0099408SD
    10 Apr 2023Baldonnel Road, Lucan, South Dublinmatched by ref_exact
  • Seven day notice SN0008297SD
    3 Apr 2023Grange Castle South Business Park, Dublin 22, South Dublinmatched by ref_exact
  • Seven day notice SN0005827SD
    10 Feb 2021Grange Castle South Business Park, Old Nangor Road, Dublin 22, South Dublinmatched by ref_exact
  • Seven day notice SN0005825SD
    10 Feb 2021Grange Castle Business Park, Old Nangor Road, Dublin 22, South Dublinmatched by ref_exact
  • Seven day notice SN0005826SD
    10 Feb 2021Grange Castle South Business Park, 22 Old Nangor Road, Dublin, South Dublinmatched by ref_exact
  • Seven day notice SN0005555SD
    23 Sept 2020Grange Castle South Business Park, Dublin 22, South Dublinmatched by ref_exact

Zoning at the site

C2.1 — Economic development and employment

EE: To provide for enterprise and employment related uses

Zoned for employment uses. Housing is not the intended use here.

Designations within 250 m

OPW flood extent nearby — flag only (licence); floodinfo.ie.

  • EPA-licensed facility · 7
    Amazon Data Services Ireland Limited; P1184; P1187
  • Radon risk area · 2
    About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 20 homes in this area is likely to have high radon levels
  • Recorded monument · 4
    Concentric enclosure; Enclosure; R183273

Provenance

Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 120973). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/southdublin/application-details/58726.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open