South Dublin County Council · SD21A/0139

St. Basil's Training Centre, Greenhills Road, Tallaght, Dublin 24

  1. 15 Nov 2021Received
  2. 13 Dec 2021Refuse permission
  3. 17 Jan 2022Appealed
  4. 18 Aug 2022Permission expires
  5. 29 Aug 2023Appeal: Refused
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.
Status
Appeal decided — refused
Decision
Refuse permission · 13 Dec 2021
Council
South Dublin County Council
Type
Permission
Units
26
Site
2,150 m²
Appeal
ACP 312504 · Refused

What’s proposed

The demolition of three existing apartment units (c. 239sq.m) and bin store (c.18sq.m) and the construction of a residential development arranged in two building blocks (Block A & Block B) ranging from 3 to 6 storeys in height over basement level (c. 3,728sq.m, including basement). Block A comprises 11 residential apartments (c. 1256sq.m) in a 5 to 6 storey building and including a ground floor level cafe (c. 93sq.m) at the buildings south eastern corner; Block B comprises 15 residential apartments (c.1393sq.m) in a 3 to 5 storey building; The proposed development will comprise 26 new residential units (5 studio apartments, 6 1-bedroom apartments, 7 2-bedroom apartments & 8 3-bedroom apartments) with associated balconies and terraces. The proposed development will comprise a total of 40 apartment units derived from 26 new apartments and 14 existing apartments; relocation of existing basement access on Old Greenhills Road and the upgrade and extension of the existing basement level ; provision of internal footpaths; landscaped communal open space (including outdoor gym equipment, children's play area and 'working from home' area); public open space; 13 car parking spaces and 74 long-stay bicycle parking spaces and 1 motorcycle parking spaces at basement level; 2 shared car parking spaces and 20 short-stay bicycle parking spaces at surface level (15 car parking spaces, 94 cycle parking spaces and 1 motorcycle parking in total); all piped infrastructure and ducting; elevation treatments; plant room; lift access and stair cores; hard and soft landscaping and boundary treatments; changes in level; waste management areas; attenuation tank; backup generator; solar photovoltaic panels; lighting; and all associated site development and excavation works above and below ground. The subject site is currently partly developed with an existing residential scheme known as Greenhill's Court comprising 17 apartment units in 4 apartment blocks ranging in height from 2 to 4 storeys, including basement car park all on a site of approximately 0.23ha. on lands bounded to the north by St Basil's Training Centre, to the east by Greenhills Road, to the west by Old Greenhills Road, and to the southeastern corner by Main Street, Tallaght, Dublin 24

SD21A/0139 is a planning application to South Dublin County Council for the demolition of three existing apartment units (c. 239sq.m) and bin store (c.18sq.m), received on 15 Nov 2021; permission was refused on 13 Dec 2021.

Planning details

Reference
SD21A/0139
Local authority
South Dublin County Council
Status
Appeal decided — refused · register status “Application under appeal
Received
15 Nov 2021
Observations close
20 Dec 2021 (closed 1729 days ago)
Decision due
13 Dec 2021 · decided 13 Dec 2021
Decision
Refuse permission on 13 Dec 2021
Proposed development
The demolition of three existing apartment units (c. 239sq.m) and bin store (c.18sq.m) and the construction of a residential development arranged in two building blocks (Block A & Block B) ranging from 3 to 6 storeys in height over basement level (c. 3,728sq.m, including basement). Block A comprises 11 residential apartments (c. 1256sq.m) in a 5 to 6 storey building and including a ground floor level cafe (c. 93sq.m) at the buildings south eastern corner; Block B comprises 15 residential apartments (c.1393sq.m) in a 3 to 5 storey building; The proposed development will comprise 26 new residential units (5 studio apartments, 6 1-bedroom apartments, 7 2-bedroom apartments & 8 3-bedroom apartments) with associated balconies and terraces. The proposed development will comprise a total of 40 apartment units derived from 26 new apartments and 14 existing apartments; relocation of existing basement access on Old Greenhills Road and the upgrade and extension of the existing basement level ; provision of internal footpaths; landscaped communal open space (including outdoor gym equipment, children's play area and 'working from home' area); public open space; 13 car parking spaces and 74 long-stay bicycle parking spaces and 1 motorcycle parking spaces at basement level; 2 shared car parking spaces and 20 short-stay bicycle parking spaces at surface level (15 car parking spaces, 94 cycle parking spaces and 1 motorcycle parking in total); all piped infrastructure and ducting; elevation treatments; plant room; lift access and stair cores; hard and soft landscaping and boundary treatments; changes in level; waste management areas; attenuation tank; backup generator; solar photovoltaic panels; lighting; and all associated site development and excavation works above and below ground. The subject site is currently partly developed with an existing residential scheme known as Greenhill's Court comprising 17 apartment units in 4 apartment blocks ranging in height from 2 to 4 storeys, including basement car park all on a site of approximately 0.23ha. on lands bounded to the north by St Basil's Training Centre, to the east by Greenhills Road, to the west by Old Greenhills Road, and to the southeastern corner by Main Street, Tallaght, Dublin 24
As published by the register.
Site area
2,150 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Around this site this application first, then everything within 500 m

Explore from hereFree report
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 53.28876, -6.35800

Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.

No account, no payment. Not a statutory planning search.

Appeal

ACP 312504 · Planning Appeal · decided · Refused 29 Aug 2023
received by the Commission 17 Jan 2022 · inspector's report · board order

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    M2 — Major town centre

    VC: To protect, improve and provide for the future development of Village Centres

    The main town centre — retail, offices, civic uses, apartments.

    Designations within 250 m

    OPW flood extent nearby — flag only (licence); floodinfo.ie.

    • NIAH-recorded building · 3
      Saint Mary's Priory; Saint Mary's Priory; Saint Basil's
    • Radon risk area · 1
      About 1 in 20 homes in this area is likely to have high radon levels
    • Recorded monument · 8
      Gatehouse; Ritual site - holy tree/bush; Castle - unclassified

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 116619). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/southdublin/application-details/60888.

    Source: npad · fetched 11 Sept 2026, 18:51
    SourceLicenceFetchedLink
    npadCC-BY-4.011 Sept 2026, 18:51open