PlanningRegister.ie
South Dublin County Council · SD21A/0186

Plot 100, Profile Park, Nangor Road, Clondalkin, Dublin 22

Approved in May 2022. No sign of building yet.

Start notices are matched from the national building control register; a start on site can be missed.

  1. 5 Jul 2021Received
  2. 24 Mar 2022Approved
  3. 5 May 2022Final approval
  4. 5 May 2027Approval runs out

An email when the builder tells the council work is starting.

Planning details

Status
Approved
Decision
Approved · 24 Mar 2022
Reference
SD21A/0186
Received
5 Jul 2021
Further information
Requested 30 Aug 2021 · received 10 Dec 2021
Site
2.79 ha

What’s proposed

Construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data halls, electrical/plant rooms including internal generators, offices, lobbies, ancillary staff areas including break rooms and toilets, stores, stair/lift cores throughout and photovoltaic panels at roof level; the total gross floor area excluding hot air plenums and external staircase is c.9,601sq.m and the overall height of the…

Show all

data centre ranges from c.16m to c.20m to roof parapet level and up to c.24.48m including roof top plant, flues and lift overrun; provision of 5 external generators, 8 fuel tanks and ancillary plant contained within a plant yard to the north of DB8; provision of a water tank plant room, air cooled chillers and ancillary plant contained within a chiller plant yard to the south of DB8; provision of a water sprinkler pump room (c.23sqm), 2 sprinkler tanks (c.12m high each), heat recovery plant room (c.17sqm), ESB substation (c.44sqm), waste/bin stores (c.52sqm); total floor area of ancillary structures and plant (c.303sqm); provision of a delivery yard and loading bays, 64 car parking spaces, 5 motorcycle spaces, bicycle shelter serving 14 spaces, smoke shelter, internal access roads and footpaths, vehicular and pedestrian access to the west from Falcon Avenue and closure of an existing vehicular entrance from Falcon Avenue; all associated site development works, services provision, drainage works including attenuation, landscape and boundary treatment works including berming, hedgerow protection areas and security fencing; no buildings are proposed above the existing ESB wayleave and SDCC watermain wayleave to the west and north of the site; the area to the southwest of the site (temporary meadow) is reserved for a future data centre, subject of a separate application to South Dublin County Council on a site bounded to the east and south by Grange Castle Golf Club, to the north by Nangor Road (R134) and to the west by an estate road known as Falcon Avenue. This application is accompanied by a Natura Impact Statement

2 other applications within 500 m in the last year

Get the full report

Nearby 2 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Zoning

C2.1 — Economic development and employment

Zoned for employment uses. Housing is not the intended use here.

G1 — Open space with recreation

Open space with active recreational amenities — pitches, courts, play areas.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • EPA-licensed facility · 3
    P1196; P1203
Where this comes from

National planning feed (NPAD), fetched 14 Oct 2026, 01:45.

Source: National Planning Application Database · fetched 14 Oct 2026, 01:45
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.014 Oct 2026, 01:45open
Summary

SD21A/0186 is a planning application to South Dublin County Council for construction of a 3 storey (part 4 storey) data centre known as 'DB8' to include data, received on 5 Jul 2021; permission was granted on 24 Mar 2022.