Planning Register
South Dublin County Council · SD21A/0042 · Permission

Site within the townland of Ballymakaily, West of Newcastle Road (R120), Lucan, Co. Dublin

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 14 Dec 2021We first saw it 11 Sept 2026, 18:51 (1733 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

SD21A/0042 is a planning application for permission at Site within the townland of Ballymakaily, West of Newcastle Road (R120), Lucan, Co. Dublin, received by South Dublin County Council on 14 Dec 2021 and first seen by Planning Register on 11 Sept 2026. The application describes: Construction of two single storey data centres with associated office and service areas; and three gas powered generation plant buildings with an overall gross floor area of 24,624sq.m that will comprise of the following: Demolition of abandoned single storey dwelling, remaining agricultural shed and derelict former farm building; Construction of 2 single storey data centres (12,797sq.m), both with associated plant at roof level, with 24 standby diesel generators with associated flues (each 25m high) that will be attached to a single storey goods receiving area/store and a single storey office area (2,404sq.m) located to the west of the data centres as well as associated water tower and sprinkler tank and other services; Amendments to the internal access road and omission of access to loading bay permitted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948 that include the relocation of permitted, and new, internal security gates; and new internal access roads to serve the proposed development that will provide access to 39 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; The development will also include the phased development of 3 two storey gas powered generation plants (9,286sq.m) within three individual buildings and ancillary development to provide power to facilitate the development of the overall site to be located within the south-west part of the overall site. Gas plant 1 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high) will facilitate, once operational the decommissioning of the temporary Gas Powered Generation Plant within its open compound as granted under SDCC Planning Ref. SD19A/0042/ABP Ref. PL06S.305948. Gas plant 2 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high). and, Gas plant 3 (3,196sq.m) will contain 21 generator units (19+2) with associated flues (each 25m high). These plants will be built to provide power to each data centre, if and, when required. The gas plants will be required as back up power generation once the permitted power connection via the permitted substation is achieved; New attenuation pond to the north of the site; Green walls are proposed on the southern elevation of each power plant, as well as to the northern elevation of the generator compound of the data centres, and enclosing the water tower/pump room compound, and a new hedgerow is proposed linking east and west of the site; Proposed above ground gas installation compound to contain single storey kiosk (93sq.m) and boiler room (44sq.m). The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage. The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. The site will remain enclosed by landscaping to all boundaries. The development will be accessed off the R120 via the permitted access granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. An EPA-Industrial Emissions (IE) licence will be applied for to facilitate the operation of the gas powered generation plant. An Environment Impact Assessment Report (EIAR) has been submitted with this application. All on a site of 22.1hectares. The council granted permission on 19 Jan 2022. The five-week observation window closed on 27 Jan 2022. An Coimisiún Pleanála decided appeal 312749 on 8 Mar 2022 (withdrawn). A commencement notice (SN0008741SD) was lodged on 17 Jul 2023, so works have started on site. The site is zoned C2.1 — economic development and employment under the South Dublin County Council development plan. Within 500 m there are 11 other decided applications in the last five years and 3 appeals.

Appeal window closes 16 Feb 2022 closed 1670 days ago
4 weeks from the council's decision (19 Jan 2022) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

Construction of two single storey data centres with associated office and service areas; and three gas powered generation plant buildings with an overall gross floor area of 24,624sq.m that will comprise of the following: Demolition of abandoned single storey dwelling, remaining agricultural shed and derelict former farm building; Construction of 2 single storey data centres (12,797sq.m), both with associated plant at roof level, with 24 standby diesel generators with associated flues (each 25m high) that will be attached to a single storey goods receiving area/store and a single storey office area (2,404sq.m) located to the west of the data centres as well as associated water tower and sprinkler tank and other services; Amendments to the internal access road and omission of access to loading bay permitted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948 that include the relocation of permitted, and new, internal security gates; and new internal access roads to serve the proposed development that will provide access to 39 new car parking spaces (including 4 electric and 2 disabled spaces) and sheltered bicycle parking to serve the new data centres; The development will also include the phased development of 3 two storey gas powered generation plants (9,286sq.m) within three individual buildings and ancillary development to provide power to facilitate the development of the overall site to be located within the south-west part of the overall site. Gas plant 1 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high) will facilitate, once operational the decommissioning of the temporary Gas Powered Generation Plant within its open compound as granted under SDCC Planning Ref. SD19A/0042/ABP Ref. PL06S.305948. Gas plant 2 (3,045sq.m) will contain 20 generator units (18+2) with associated flues (each 25m high). and, Gas plant 3 (3,196sq.m) will contain 21 generator units (19+2) with associated flues (each 25m high). These plants will be built to provide power to each data centre, if and, when required. The gas plants will be required as back up power generation once the permitted power connection via the permitted substation is achieved; New attenuation pond to the north of the site; Green walls are proposed on the southern elevation of each power plant, as well as to the northern elevation of the generator compound of the data centres, and enclosing the water tower/pump room compound, and a new hedgerow is proposed linking east and west of the site; Proposed above ground gas installation compound to contain single storey kiosk (93sq.m) and boiler room (44sq.m). The development will also include ancillary site works, connections to existing infrastructural services as well as fencing and signage. The development will include minor modifications to the permitted landscaping to the west of the site as granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. The site will remain enclosed by landscaping to all boundaries. The development will be accessed off the R120 via the permitted access granted under SDCC planning Ref. SD19A/0042/ABP Ref. PL06S.305948. An EPA-Industrial Emissions (IE) licence will be applied for to facilitate the operation of the gas powered generation plant. An Environment Impact Assessment Report (EIAR) has been submitted with this application. All on a site of 22.1hectares.

Status
Appeal decided
Decision
Grant permission on 19 Jan 2022
Final grant
24 Mar 2022
Permission expires
15 Jul 2022
Floor area
2.46 ha
Site (from polygon)
21.78 ha
Location precision
site (coords_polygon)

Timeline

  • 20 Apr 2021
    Further information requested
  • 2 Sept 2021
    Further information received
  • 14 Dec 2021
    New application
    Observation window closed 27 Jan 2022
  • 19 Jan 2022
    Decision
    Appeal window closed 16 Feb 2022
  • 15 Feb 2022
    Appeal lodged

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.32776, -6.45973

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

ACP 312749 · Planning Appeal · decided · Withdrawn 8 Mar 2022
received by the Commission 15 Feb 2022

Commencement

  • Seven day notice SN0008741SD
    17 Jul 2023Newcastle Road, Lucan, South Dublinmatched by ref_exact
  • Commencement notice CN0102388SD
    3 Jul 2023Newcastle Road, Lucan, South Dublinmatched by ref_exact

Zoning at the site

C2.1 — Economic development and employment

EE: To provide for enterprise and employment related uses

Zoned for employment uses. Housing is not the intended use here.

G1 — Open space with recreation

OS: To preserve and provide for open space and recreational amenities

Open space with active recreational amenities — pitches, courts, play areas.

P1 — Rural

RU: To protect and improve rural amenity and to provide for the development of agriculture

Zoned to protect agriculture, rural enterprise and biodiversity. New houses are restricted to demonstrated local need.

Designations within 250 m

OPW flood extent nearby — flag only (licence); floodinfo.ie.

  • EPA-licensed facility · 4
    Takeda Ireland Limited; P0693; P1190
  • Natural Heritage Area (incl. proposed) · 1
    Grand Canal
  • NIAH-recorded building · 6
    12th Lock Bridge; 12th Lock; mill (water)
  • Radon risk area · 2
    About 1 in 10 homes in this area is likely to have high radon levels; About 1 in 5 homes in this area is likely to have high radon levels

Provenance

Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 120556). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/southdublin/application-details/60282.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open