Planning Register
South Dublin County Council · SD21A/0241 · Permission

In the townlands of Ballybane & Kilbride within Profile Park, Clondalkin, Dublin 22

Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness

Council received 21 Mar 2022We first saw it 11 Sept 2026, 18:51 (1636 days after receipt — sources refresh weekly)
Applications only for this county. Appeals, zoning, RZLT and consultations: Dún Laoghaire-Rathdown and Fingal only for now.

SD21A/0241 is a planning application for permission at In the townlands of Ballybane & Kilbride within Profile Park, Clondalkin, Dublin 22, received by South Dublin County Council on 21 Mar 2022 and first seen by Planning Register on 11 Sept 2026. The application describes: Demolition of the abandoned single storey dwelling and associated outbuilding (206sqm); construction of 2 two storey data centers with plant at roof level of each facility and associated ancillary development which will have a gross floor area of 40,589sq.m consisting of 1 two storey data center (Building 11) which will be located to the south of the site and will have a gross floor area of 24,667sq.m. including 22 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; 1 two storey data center (Building 12) which will be located to the north of the site, and to the immediate north of Building 11 and will have a gross floor area of 12,915sq.m including 11 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; each of the two data centers will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces; each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; single storey step-up substation (38sq.m) as well as 2 single storey switch substations (121sq.m); AGI Gas Regulator compound that include 3 single storey buildings (134sq.m); construction of a gas powered generation plant in the form of a 13m high single storey building with a gross floor area of 2,714sq.m that will contain 10 gas generators with associated flues that will be 25m in height, and grouped in pairs and threes; the Gas Plant will be located to the west of Building 11; ancillary site development works, that will include reorientation of the Baldonnel Stream, biodiversity management initiatives, attenuation ponds and the installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park; other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, services road, entrance gates, sprinkler tanks and pump room; a temporary gas powered generation plant within a fenced yard containing 21 generator units in containers, each with associated flues (each 25m high), 12 transformers and 10 containers of controls to be located to the west of, and associated with the first phase of Building 11, and will be required for a period of up to 2 years if connection to the national grid is delayed; this temporary plant will not be built if the connection to the national grid is in place prior to the operation of Building 11 at this site that includes an abandoned single storey residential property on the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 8.7 hectares. The council granted permission on 16 May 2022. The five-week observation window closed on 25 Apr 2022. An Coimisiún Pleanála decided appeal 313787 on 4 Jul 2022 (withdrawn). A commencement notice (CN0124446SD) was lodged on 30 Dec 2024, so works have started on site. The site is zoned C2.1 — economic development and employment under the South Dublin County Council development plan. Within 500 m there are 20 other decided applications in the last five years and 6 appeals.

Appeal window closes 13 Jun 2022 closed 1552 days ago
4 weeks from the council's decision (16 May 2022) · s.37 Planning and Development Act 2000 · €220 to An Coimisiún Pleanála (€110 observer)

Proposal

Demolition of the abandoned single storey dwelling and associated outbuilding (206sqm); construction of 2 two storey data centers with plant at roof level of each facility and associated ancillary development which will have a gross floor area of 40,589sq.m consisting of 1 two storey data center (Building 11) which will be located to the south of the site and will have a gross floor area of 24,667sq.m. including 22 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; 1 two storey data center (Building 12) which will be located to the north of the site, and to the immediate north of Building 11 and will have a gross floor area of 12,915sq.m including 11 emergency generators located at ground floor level within a compound to the western side of the data center with associated flues that will be 22.3m in height; each of the two data centers will include data storage rooms, associated electrical and mechanical plant rooms, loading bays, maintenance and storage spaces, office administration areas, and plant including PV panels at roof level as well as a separate house generator for each facility which will provide emergency power to the admin and ancillary spaces; each generator will include a diesel tank and there will be a refuelling area to serve the proposed emergency generators; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; the overall height of each data center apart from the flues and plant at roof level is c. 14.23m above the finished floor level; single storey step-up substation (38sq.m) as well as 2 single storey switch substations (121sq.m); AGI Gas Regulator compound that include 3 single storey buildings (134sq.m); construction of a gas powered generation plant in the form of a 13m high single storey building with a gross floor area of 2,714sq.m that will contain 10 gas generators with associated flues that will be 25m in height, and grouped in pairs and threes; the Gas Plant will be located to the west of Building 11; ancillary site development works, that will include reorientation of the Baldonnel Stream, biodiversity management initiatives, attenuation ponds and the installation and connection to the underground foul and storm water drainage network, and installation of utility ducts and cables, that will include the drilling and laying of ducts and cables under the internal road network within Profile Park; other ancillary site development works will include hard and soft landscaping, lighting, fencing, signage, services road, entrance gates, sprinkler tanks and pump room; a temporary gas powered generation plant within a fenced yard containing 21 generator units in containers, each with associated flues (each 25m high), 12 transformers and 10 containers of controls to be located to the west of, and associated with the first phase of Building 11, and will be required for a period of up to 2 years if connection to the national grid is delayed; this temporary plant will not be built if the connection to the national grid is in place prior to the operation of Building 11 at this site that includes an abandoned single storey residential property on the New Nangor Road (R134), Dublin 22; and on land within the townlands of Ballybane and Kilbride within Profile Park, Clondalkin, Dublin 22 on an overall site of 8.7 hectares.

Status
Appeal decided
Decision
Grant permission on 16 May 2022
Final grant
19 Jul 2022
Permission expires
13 Oct 2022
Floor area
4.06 ha
Site (from polygon)
8.75 ha
Location precision
site (coords_polygon)

Timeline

  • 26 Oct 2021
    Further information requested
  • 21 Mar 2022
    Further information received
  • 21 Mar 2022
    New application
    Observation window closed 25 Apr 2022
  • 16 May 2022
    Decision
    Appeal window closed 13 Jun 2022
  • 13 Jun 2022
    Appeal lodged

Around this site this application first, then everything within 500 m

Explore from hereFull reportWatch
Click a dot to open its row.
Loading planning applications…
Detail from the 1837 Ordnance Survey six-inch map: townland boundaries, field patterns and roads
Full report
Freeduring launch · PDF or print
OS six-inch sheet, 1837 · public domain
Full report · within 0.5 km of the pin

Full planning report for 53.31673, -6.44438

One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.

Freeduring launch

1 Where this is — preview

1 Deadlines still open

Full reportFree while we launch — no account, no payment. Open it on screen or download the PDF.

Appeal

ACP 313787 · Planning Appeal · decided · Withdrawn 4 Jul 2022
received by the Commission 13 Jun 2022

Commencement

  • Commencement notice CN0124446SD
    30 Dec 2024Profile Park Business Park, New Nangor Road,, Dublin 22, South Dublinmatched by ref_exact
  • Seven day notice SN0009324SD
    24 Oct 2023Profile Park Business Park New Nangor Road, Dublin 22, South Dublinmatched by ref_exact
  • Seven day notice SN0008866SD
    4 Aug 2023Profile Park Business Park, New Nangor Road, Dublin 22, South Dublinmatched by ref_exact
  • Seven day notice SN0008867SD
    4 Aug 2023Profile Park Business Park, New Nangor Road, Dublin 22, South Dublinmatched by ref_exact
  • Seven day notice SN0008802SD
    26 Jul 2023Profile Park Business Park, New Nangor Road, Dublin 22, South Dublinmatched by ref_exact
  • Commencement notice CN0100024SD
    20 Apr 2023New Nangor Road, Profile Park, South Dublinmatched by ref_exact

Zoning at the site

C2.1 — Economic development and employment

EE: To provide for enterprise and employment related uses

Zoned for employment uses. Housing is not the intended use here.

Designations within 250 m

OPW flood extent nearby — flag only (licence); floodinfo.ie.

  • EPA-licensed facility · 6
    P1187; P1189; P1191
  • Radon risk area · 1
    About 1 in 20 homes in this area is likely to have high radon levels

Provenance

Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 121386). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/southdublin/application-details/61269.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open