Site at Calmount Road and Ballymount Avenue, Ballymount Industrial Estate, Dublin 12
- 24 Nov 2022Received
- 15 Dec 2022Grant permission
- 3 Feb 2023Final grant
- 23 Mar 2026Commenced
- Status
- Commenced
- Decision
- Grant permission · 15 Dec 2022
- Council
- South Dublin County Council
- Type
- Permission
- Site
- 7.46 ha
What’s proposed
Construction of 5 warehouse / logistics units (Units 1, 2 3, 4 and 6), Including ancillary office use and entrance / reception areas over two levels, with maximum heights of c. 17.09 metres and a combined total gross floor area (GFA) of 20,158sq.m; Each warehouse / logistics unit includes car parking to the front, and service yards, including HGV loading bays, to the rear of each unit; Signage zones are proposed for each unit; A total of 200 car parking spaces and 110 cycle spaces are provided for the 5 warehous2e / logistics units; Construction of 3 three storey own-door office buildings (Block SA, SB and SC) with maximum heights of c. 13.45 metres and a combined GFA of 4,194sq.m; Signage zones are proposed at the entrances to the buildings; A total of 77 car parking spaces, 50 cycle parking spaces and a bin storage area are provided for the proposed office buildings; Construction of a cafe/restaurant unit with a maximum height of c. 6.09 metres and a GFA of 213sq.m to be located in the south western section of the site; The proposal includes signage for the unit, associated outdoor seating and a bin store; 14 car parking spaces and 10 cycle spaces are provided for the cafe/restaurant unit; The proposal includes 5 ESB substation buildings; The development is to be accessed off Ballymount Avenue and Calmount Road and includes for alterations and upgrades to the public footpaths and road; The development provides for vehicular and service access points, associated internal access roads, circulation areas and footpaths; The proposal includes landscaping and planting, entrance signage, boundary treatments, lighting, PV panels, green roofs, underground foul and storm water drainage network, including connections to the foul and surface water drainage network on the public roads, attenuation areas and all associated site works and development
SD22A/0099 is a planning application to South Dublin County Council for construction of 5 warehouse / logistics units (Units 1, 2 3, 4 and 6), Including, received on 24 Nov 2022; permission was granted on 15 Dec 2022.
Planning details
- Reference
- SD22A/0099
- Local authority
- South Dublin County Council
- Status
- Commenced · register status “Decision Following A.I.”
- Received
- 24 Nov 2022
- Observations close
- 9 Jan 2023 (closed 1344 days ago)
- Decision due
- 22 Dec 2022 · decided 15 Dec 2022
- Decision
- Grant permission on 15 Dec 2022
- Proposed development
- Construction of 5 warehouse / logistics units (Units 1, 2 3, 4 and 6), Including ancillary office use and entrance / reception areas over two levels, with maximum heights of c. 17.09 metres and a combined total gross floor area (GFA) of 20,158sq.m; Each warehouse / logistics unit includes car parking to the front, and service yards, including HGV loading bays, to the rear of each unit; Signage zones are proposed for each unit; A total of 200 car parking spaces and 110 cycle spaces are provided for the 5 warehous2e / logistics units; Construction of 3 three storey own-door office buildings (Block SA, SB and SC) with maximum heights of c. 13.45 metres and a combined GFA of 4,194sq.m; Signage zones are proposed at the entrances to the buildings; A total of 77 car parking spaces, 50 cycle parking spaces and a bin storage area are provided for the proposed office buildings; Construction of a cafe/restaurant unit with a maximum height of c. 6.09 metres and a GFA of 213sq.m to be located in the south western section of the site; The proposal includes signage for the unit, associated outdoor seating and a bin store; 14 car parking spaces and 10 cycle spaces are provided for the cafe/restaurant unit; The proposal includes 5 ESB substation buildings; The development is to be accessed off Ballymount Avenue and Calmount Road and includes for alterations and upgrades to the public footpaths and road; The development provides for vehicular and service access points, associated internal access roads, circulation areas and footpaths; The proposal includes landscaping and planting, entrance signage, boundary treatments, lighting, PV panels, green roofs, underground foul and storm water drainage network, including connections to the foul and surface water drainage network on the public roads, attenuation areas and all associated site works and developmentAs published by the register.
- Site area
- 7.46 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 53.31257, -6.35197
Zoning, appeals, sold prices, flood and heritage constraints — everything for this area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
- Commencement notice CN0139802SD
- Commencement notice CN0116532SD
- Commencement notice CN0109583SD
- Short commencement notice CN0108709SD
- Short commencement notice CN0105767SD
Zoning at the site
EE: To provide for enterprise and employment related uses
Zoned for employment uses. Housing is not the intended use here.
Designations within 250 m
OPW flood extent nearby — flag only (licence); floodinfo.ie.
- EPA-licensed facility · 7
- Radon risk area · 5
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 121834). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/southdublin/application-details/62199.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |