PlanningRegister.ie
South Dublin County Council · SD22A/0352

Colaiste Chilliain, Old Nangor Road, Clondalkin, Dublin 22

Approved in Jun 2023. Building started in 2024.

What’s proposed

In plain English

Two new primary school buildings and a PE hall at Colaiste Chilliain

The applicant wants to build two three-storey primary schools and a single-storey PE hall. The project also includes new vehicle and pedestrian entrances and parking areas.

  • Includes two new pedestrian access routes on New Nangor Road
  • Creates a one-way vehicle route with a bus set down zone
  • Adds new hard play courts and bicycle parking spaces
  • Involves internal refurbishment works to the existing Colaiste Chilliain building
Written by AI from the council’s description

An AI model rewrote the council’s description below in everyday words on 9 Oct 2026. It was told to use only that text, and every number it wrote was checked against it. It says nothing about whether the application will be approved. The council’s wording and planning file are the record.

The council’s description

Construction of two new three storey primary school buildings for Gaelscoil na Camoige agus Gaelscoil Chluain Dolcain providing 16 classrooms each, a shared general purpose area, ancillary teaching and staff accommodation; The development will also consist of the construction of a new single storey PE Hall building for Colaiste Chilliain;

Show all

The development will also include two new pedestrian access routes, with one located on New Nangor Road and with another located at the junction of New Nangor Road and Old Nangor Road; A new vehicle entrance and exit onto Old Nangor Road to provide a one-way vehicle route with a bus/vehicle set down zone, conversion of existing vehicle entrance to Colaiste Chillian to an in-only entrance; 2 new hard play courts and play space at each primary school with site landscaping, bicycle parking spaces and car parking spaces for each primary school including accessible car parking spaces, internal refurbishment works to Colaiste Chilliain to facilitate the reintegration of teaching accommodation upon Gaelscoil Chluain Dolcain's move to the new school; Removal of the existing temporary changing room and relocation of car park at Gaelscoil Chluain to provide accessible parking spaces and associated works; Connections to public utility and drainage services, boundary treatments, installation of PV panels, alterations to existing drainage layout and associated site development works

  1. 8 Sept 2022Received
  2. 25 May 2023Approved
  3. 29 Jun 2023Final approval
  4. 24 Sept 2024Building started

Planning details

Status
Building startedi
Decision
Approved · 25 May 2023
Reference
SD22A/0352
Received
8 Sept 2022
Further information
Requested 2 Nov 2022 · received 28 Apr 2023
Site
4.88 ha

6 other applications within 500 m in the last year

Get the full report

Nearby 6 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Building started

  • 14 May 2025 · Builder told the council work was starting CN0128536SD
  • 24 Sept 2024 · Builder told the council work was starting CN0119758SD

Zoning

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

  • NIAH-recorded building · 8
    house
  • Recorded monument · 1
    R149476
Where this comes from

National planning feed (NPAD), fetched 25 Nov 2026, 23:00.

Source: National Planning Application Database · fetched 25 Nov 2026, 23:00
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.025 Nov 2026, 23:00open
Summary

SD22A/0352 is a planning application to South Dublin County Council for construction of two new three storey primary school buildings for Gaelscoil na Camoige, received on 8 Sept 2022; permission was granted on 25 May 2023.