Blenders, Whitestown Road, Tallaght, Dublin, D24 VY75
Approved in May 2024. Building started in 2024, signed off as finished in Aug 2025.
What’s proposed
In plain English
A new warehouse extension at the Blenders manufacturing facility
The applicant wants to build a new warehouse with a freezer room at their existing site. This includes adding new parking, loading docks, and a sprinkler tank.
- The new warehouse will be 20.5m high
- Includes 4 EV charging spaces and 35 cycle parking spaces
- Adds a new HGV staging area for 4 trucks
- Includes a 10m high sprinkler tank and pump room
Written by AI from the council’s description
An AI model rewrote the council’s description below in everyday words on 9 Oct 2026. It was told to use only that text, and every number it wrote was checked against it. It says nothing about whether the application will be approved. The council’s wording and planning file are the record.
The council’s description
Construction of a finished goods warehouse (including freezer room) at the south side of the existing Blenders manufacturing facility. The proposed extension will have a gross floor area of 3,900 sq.m and a maximum height of 20.5m.
Show all
Also, ancillary works including: PV panels to new proposed warehouse roofs, 3 no. additional loading dock levellers, Relocation of existing carparking (no change in numbers) including provision of 4 no. EV charging spaces and 2 no. accessible parking spaces, 35 no. cycle parking spaces., New HGV staging area to accommodate 4 trucks., Construction of new sprinkler tank (10m high) and pump room (3m high) to the south west of the site along with retaining wall., Provision of internal connections to the main Blenders building., Fire escape door to western elevation of main Blenders building. All associated site works including landscaping, drainage infrastructure and a new path to east of site
- 25 Oct 2023Received
- 27 Mar 2024Approved
- 10 May 2024Final approval
- 24 Jun 2024Building started
- 27 Aug 2025Signed off
Planning details
- Status
- Building started
- Decision
- Approved · 27 Mar 2024
- Reference
- SD23A/0277
- Received
- 25 Oct 2023
- Further information
- Requested 13 Dec 2023 · received 6 Mar 2024
- Site
- 4.44 ha
10 other applications within 500 m in the last year
Get the full reportNearby 10 · 500 m · 12 months
- Awaiting decision1A Maplewood Lawn, Springfield, Tallaght Dublin 24, D24W6N3
- GrantedWestend Gate, Cookstown Way, Tallaght, Dublin 24
- WithdrawnTallaght Stadium, Whitestown Way, Tallaght, Dublin 24, D24 FNK6
- GrantedA site of approximately 1.32 Ha principally located at, Whitestown Way, Tallaght, Dublin 24.
- Awaiting decision9, AlderPark Court, Tallaght, Dublin
- GrantedUnit 3, Springfield Shopping Centre, Alderwood Court, Tallaght, D24H5NT
- GrantedTallaght Stadium, Whitestown Way, Tallaght, Dublin 24
- Appealed2, Raheen Green, Tallaght, Dublin 24, D24X7H9
Show all 10
- GrantedBlenders, Whitestown, Tallaght, Dublin 24, D24 VY75
- GrantedUnit A1/A2, South City Business Park, Tallaght, Co. Dublin, D24 HT95
- CommencedThe Former Meridian Building, Whitestown Drive, Tallaght Business Park, Dublin 24, D24 HH50
- Granted30, Alderwood Grove, Springfield, Tallaght, Dublin 24, D24 VXC5
- Granted74, Alderwood Avenue, Springfield, Tallaght, D24 Y5N9
- Granted7, Maplewood Way, Springfield, Dublin 24, D24 H6F5
- GrantedBlenders, Whitestown Road, Tallaght, Dublin, D24 VY75
- Appeal decided29, Raheen Park, Dublin 24
- GrantedUnit 3, Whitestown Industrial Estate, Tallaght, Dublin 24
- Refused29, Raheen Park, Springfield, Tallaght, Dublin 24 D24 W2T6
- GrantedParcel of land on the western side of Whitestown Way, adjacent South City Business Park, within the Townlands of Tallaght, centered at approx., Irish Traverse Mercator
- CommencedUnits 30 and 31, Tallaght Business Centre, Whitestown Road, Tallaght, Dublin 24
- GrantedUnit 1, Arena Retail Park, Whitestown Way, Tallaght, Dublin 24
- Awaiting decisionD24 Neighbourhood
- Granted97, Killinarden Estate, Tallaght, Dublin 24
- GrantedUnit B12, South City Business Park, Killinarden Link Road, Whitestown Way, Tallaght, Dublin 24.
- CommencedUnit 4, The Square Motor Centre, Belgard Square, Tallaght, Dublin 24
- RefusedUnit F2, South City Business Centre, Killinarden Link Road, Whitestown, Tallaght, Dublin 24
- GrantedThe Arena Centre, Whitestown Way, Dublin 24
- Appeal decidedThe Arena Centre, Whitestown Way, Dublin 24
Homes nearby
- For sale34 Maplewood Park, Springfield, Tallaght, Dublin 24, D24 R2K0
- For saleApt 168, Block E, New Seskin Court, Whitestown Way, Tallaght, Dublin 24
- For sale255 Old Blessington Road, Tallaght, Dublin 24, D24 ETE5
- For sale151 New Seskin Court, Tallaght, Dublin 24
- For sale45 Tallow Hall, Belgard Square, Tallaght, Dublin 24, D24 KN2D
- For saleApartment 15, Tallow Hall, Belgard Square, Tallaght, Dublin 24, D24 E284
Development land nearby
- Permitted, not started · 169 homes granted 01 Sep 2026, expires 31 Aug 2031 — Whitestown Way Development (0.3 km)
- Permitted, not started · 199 homes granted 27 May 2026, expires 27 May 2031 — Belgard Square East (1.0 km)
- Public land off Alderpark Court, Springfield, Dublin 24 (0.2 km)
- Public land off Former Uchiya Factory, Tallaght Business Centre… (0.2 km)
- Residential land off Alderpark Court, Tallaght, Dublin 24 (0.2 km)
Building started
- 24 Jun 2024 · Builder told the council work was starting CN0116342SD
Zoning
Zoned for employment uses. Housing is not the intended use here.
A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.
Protections nearby 250 m
Flood area nearby (OPW maps). floodinfo.ie ↗
- EPA-licensed facility · 3
Where this comes from
National planning feed (NPAD), fetched 25 Nov 2026, 23:00.
Source: National Planning Application Database · fetched 25 Nov 2026, 23:00
| Source | Licence | Fetched | Link |
|---|---|---|---|
| National Planning Application Database | CC BY 4.0 | 25 Nov 2026, 23:00 | open |
Summary
SD23A/0277 is a planning application to South Dublin County Council for construction of a finished goods warehouse (including freezer room) at the south side of, received on 25 Oct 2023; permission was granted on 27 Mar 2024.