PlanningRegister.ie
South Dublin County Council · SD23A/0337

Tallaght Enterprise Centre, Main Road, Tallaght, Dublin 24

Approved in Jun 2024. Building started in 2025, signed off as finished in Nov 2026.

What’s proposed

Renovate and extend part of the existing single and two storey enterprise centre (existing gross floor area: 2,379 sq.m.) to create a food and beverage enterprise centre to be called Priory Market including (i) a single storey extension (114 sq.m) on the west (side) elevation; a two storey extension (290 sq.m) on the east (side) elevation, 2 new mezzanine areas (51 sq.m and 19 sq.m); a new disability accessible…

Show all

toilet at first floor level; plant area at roof level (overall proposed gross floor area: 2,853 sq.m); (ii) the open plan market area will comprise 12 vendor stalls with unreserved seating and tables, extended and reconfigured toilets, a shared kitchen area (123 sq.m), a dishwasher room, etc., and a bar area ancillary to the existing Priory Brewery (that will be extended internally by 50 sq.m); (iii) a new entrance door at the northern elevation with existing entrance replaced by a window; (iv) optional solar panels on the roof; (v) revisions to the existing surface level car park to provide for 37 car parking spaces, 3 mobility impaired spaces, and 10 electric vehicle charging point spaces, and 66 bicycle spaces; (vi) revisions to the existing vehicular entrance at Main Road to provide for a new pathway; (vii) 8 Priory Market signs as follows; 1 double sided sign (1400 x 2000 mm) within the existing freestanding Bryan S Ryan sign; 2 signs (1000 x 5600 mm each) at the site entrance wing walls, 3 freestanding flag type signs (1700 x 700 mm each) with an overall height of 3.9 metres; 1 no. freestanding sign (1400 x 7000 mm) on a support frame with an overall height of 4.4 metres; and hand painted sign (1600 x c. 38000 mm) below eaves level across the rear elevation; and (viii) landscaping and ancillary site development works

  1. 21 Dec 2023Received
  2. 7 May 2024Approved
  3. 18 Jun 2024Final approval
  4. 30 Jun 2025Building started
  5. 9 Nov 2026Signed off

Planning details

Status
Building started
Decision
Approved · 7 May 2024
Reference
SD23A/0337
Received
21 Dec 2023
Further information
Requested 23 Feb 2024 · received 9 Apr 2024
Site
6,862 m²

6 other applications within 500 m in the last year

Get the full report

Nearby 6 · 500 m · 12 months

Distance
Time

Explore this area on the map →

Homes nearby

Development land nearby

See all development land near here →

Building started

  • 6 Jul 2026 · Builder told the council work was starting (seven-day notice) SN0014419SD
  • 30 Jun 2025 · Builder told the council work was starting (seven-day notice) SN0012677SD

Zoning

M1 — Metro / rail economic corridor

A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

Where this comes from

National planning feed (NPAD), fetched 14 Oct 2026, 01:45.

Source: National Planning Application Database · fetched 14 Oct 2026, 01:45
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.014 Oct 2026, 01:45open
Summary

SD23A/0337 is a planning application to South Dublin County Council for renovate and extend part of the existing single and two storey enterprise centre, received on 21 Dec 2023; permission was granted on 7 May 2024.