a 1.233 hectare Site Located at Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22
Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness
SD23A/0079 is a planning application for permission at a 1.233 hectare Site Located at Grange Castle Business Park, Nangor Road, Clondalkin, Dublin 22, received by South Dublin County Council on 20 Apr 2023 and first seen by Planning Register on 11 Sept 2026. The application describes: Alterations to a previously approved development (Reg. Ref. SD15A/0061 and Reg. Ref. SD16A/0398) which relates to a 10-year permission for the construction of a Peaker Power Plant in a single storey building with a mezzanine level, together with associated plant equipment including water & fuel tanks. The alterations to the previously approved development (Reg. Ref. SD15A/0061 & SD16A/0398) include the following: (i) alterations to the previously approved building within the eastern portion of the site as follows: (a) an increase in the overall footprint of the building to the north-west to include office space, and staff facilities at ground floor level; and to the north-east to include a boiler room at ground floor level; (b) revised roof footprint to the rear of the building, with the roof being lowered to the rear; (c) relocation of stair cores and updates to building elevations, including the introduction of additional glazing; (d) amendments to the external open service yard to the north of the building including the removal of the previously approved transformer rooms, addition of containerised plant and minor alterations to the location of shaft towers; (e) a minor increase in the height (by 600mm) of the screen to the service yard. Alterations to the western portion of the site include; (ii) minor amendments to the positioning of the internal roadway; (iii) amendments to the tank bund area and tank arrangement to the west of the site, and the addition of contained plant and a pump house building; (iv) minor amendment to the location of the approved tanker unloading area; (v) relocation of car parking spaces from the south of the site to the north of the main bund areas, with the exception of the approved accessible parking space; (vi) provision of a gas skid & support structure to the south-west of the site; (vii) provision of an enlarged plant compound to the west of the bund area and relocation of transformers to this compound; (viii) revisions to the positioning and an increase in size of the approved pipe bridge to align with services; (ix) provision of a new bicycle parking shelter comprising 8 no. parking spaces; (x) amendments to soft landscaping to accommodate the revised layout and; (xi) drainage, boundary treatments, site lighting, EV car charging ports; and all associated site development and ancillary works necessary to facilitate the development. The capacity of the plant will be 115MW as approved under Reg. Ref. SD15A/ 0061. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended. The council granted permission on 14 Jun 2023. The five-week observation window closed on 25 May 2023. A commencement notice (CN0122843SD) was lodged on 4 Dec 2024, so works have started on site. The site is zoned C2.1 — economic development and employment under the South Dublin County Council development plan. Within 500 m there are 7 other decided applications in the last five years.
Proposal
Alterations to a previously approved development (Reg. Ref. SD15A/0061 and Reg. Ref. SD16A/0398) which relates to a 10-year permission for the construction of a Peaker Power Plant in a single storey building with a mezzanine level, together with associated plant equipment including water & fuel tanks. The alterations to the previously approved development (Reg. Ref. SD15A/0061 & SD16A/0398) include the following: (i) alterations to the previously approved building within the eastern portion of the site as follows: (a) an increase in the overall footprint of the building to the north-west to include office space, and staff facilities at ground floor level; and to the north-east to include a boiler room at ground floor level; (b) revised roof footprint to the rear of the building, with the roof being lowered to the rear; (c) relocation of stair cores and updates to building elevations, including the introduction of additional glazing; (d) amendments to the external open service yard to the north of the building including the removal of the previously approved transformer rooms, addition of containerised plant and minor alterations to the location of shaft towers; (e) a minor increase in the height (by 600mm) of the screen to the service yard. Alterations to the western portion of the site include; (ii) minor amendments to the positioning of the internal roadway; (iii) amendments to the tank bund area and tank arrangement to the west of the site, and the addition of contained plant and a pump house building; (iv) minor amendment to the location of the approved tanker unloading area; (v) relocation of car parking spaces from the south of the site to the north of the main bund areas, with the exception of the approved accessible parking space; (vi) provision of a gas skid & support structure to the south-west of the site; (vii) provision of an enlarged plant compound to the west of the bund area and relocation of transformers to this compound; (viii) revisions to the positioning and an increase in size of the approved pipe bridge to align with services; (ix) provision of a new bicycle parking shelter comprising 8 no. parking spaces; (x) amendments to soft landscaping to accommodate the revised layout and; (xi) drainage, boundary treatments, site lighting, EV car charging ports; and all associated site development and ancillary works necessary to facilitate the development. The capacity of the plant will be 115MW as approved under Reg. Ref. SD15A/ 0061. This application relates to development which comprises of an activity which requires an Industrial Emissions Licence in accordance with the First Schedule of the EPA Act 1992 as amended.
- Status
- Final Grant
- Decision
- Grant permission on 14 Jun 2023
- Final grant
- 25 Jul 2023
- Floor area
- 3,859 m²
- Site (from polygon)
- 1.36 ha
- Location precision
- site (coords_polygon)
Timeline
- 20 Apr 2023New applicationObservation window closed 25 May 2023
- 14 Jun 2023DecisionAppeal window closed 12 Jul 2023

Full planning report for 53.32915, -6.44540
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
- Commencement notice CN0122843SD
- Seven day notice SN0009468SD
Zoning at the site
EE: To provide for enterprise and employment related uses
Zoned for employment uses. Housing is not the intended use here.
Designations within 250 m
OPW flood extent nearby — flag only (licence); floodinfo.ie.
- EPA-licensed facility · 4
- Natural Heritage Area (incl. proposed) · 1
- Radon risk area · 3
- Recorded monument · 1
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 118853). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/southdublin/application-details/64127.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |