Units 19 and 20, The Mill Shopping Centre, Ninth Lock Road, Clondalkin, D22R2W6
Data updated 12 Sept 2026 · register lag up to 7 days · sources & freshness
SD24A/0171W is a planning application for permission at Units 19 and 20, The Mill Shopping Centre, Ninth Lock Road, Clondalkin, D22R2W6, received by South Dublin County Council on 5 Jul 2024 and first seen by Planning Register on 11 Sept 2026. The application describes: Clonmill Limited are applying for Permission, for the proposed amalgamation of shop units 19 and 20, at The Mill Shopping Centre Clondalkin, Ninth Lock Road, Clondalkin, Dublin 22. The proposed development will consist of the amalgamation of the existing retail Unit 19 (c. 78 sq.m) and existing retail Unit 20 (c. 74 sq.m) into a single retail unit 19/20 c. 155 sq.m through the removal of the existing wall between the two units. The existing entrance to Unit 20 is to be closed with a partition wall and the shop front glazing to be removed and replaced with a glazing unit to match height to Unit 19. Including all associated site services and development works. The council granted permission on 29 Aug 2024. The five-week observation window closed on 9 Aug 2024. The site is zoned M2 — major town centre under the South Dublin County Council development plan. Within 500 m there are 58 other decided applications in the last five years and 8 appeals.
Proposal
Clonmill Limited are applying for Permission, for the proposed amalgamation of shop units 19 and 20, at The Mill Shopping Centre Clondalkin, Ninth Lock Road, Clondalkin, Dublin 22. The proposed development will consist of the amalgamation of the existing retail Unit 19 (c. 78 sq.m) and existing retail Unit 20 (c. 74 sq.m) into a single retail unit 19/20 c. 155 sq.m through the removal of the existing wall between the two units. The existing entrance to Unit 20 is to be closed with a partition wall and the shop front glazing to be removed and replaced with a glazing unit to match height to Unit 19. Including all associated site services and development works.
- Status
- Final Grant
- Decision
- Grant permission on 29 Aug 2024
- Final grant
- 7 Oct 2024
- Permission expires
- 6 Oct 2029
- Floor area
- 3 m²
- Site (from polygon)
- 171 m²
- Location precision
- site (coords_polygon)
Timeline
- 5 Jul 2024New applicationObservation window closed 9 Aug 2024
- 29 Aug 2024DecisionAppeal window closed 26 Sept 2024

Full planning report for 53.32444, -6.39606
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
TC: To protect, improve and provide for the future development of Town Centres
The main town centre — retail, offices, civic uses, apartments.
Designations within 250 m
OPW flood extent nearby — flag only (licence); floodinfo.ie.
- NIAH-recorded building · 15
- Radon risk area · 3
- Recorded monument · 2
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 91184). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/southdublin/application-details/66471.
Source: npad · fetched 11 Sept 2026, 18:51
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 11 Sept 2026, 18:51 | open |