PlanningRegister.ie
South Dublin County Council · SD25A/0051W

The Court and at the corner of The Court and Citywest Village Avenue, Citywest Village, Citywest, Dublin 24

Approved in Sept 2025. No sign of building yet.

  1. 23 Jun 2025Received
  2. 21 Jul 2025Approved
  3. 2 Sept 2025Final approval
  4. 1 Sept 2030Approval runs out

Development site Granted for 12 homes; no commencement notice yet. Permission runs to 1 Sept 2030: this site on Buildable

Status
Approved
Decision
Approved · 21 Jul 2025
Council
South Dublin County Council
Type
Permission
Units
12
Site
2,179 m²

Live near The Court and at the corner of The…?

Everything else planned on your street, in one report.

Check my street
Council register ↗

What’s proposed

In plain English

Construction of 12 residential units, a coffee kiosk and childcare facility

The applicant wants to build 12 homes, a coffee kiosk and a childcare facility across two sites. The apartments, kiosk and childcare facility will be in a single three-storey building.

  • Includes 4 apartments and 8 houses
  • Childcare facility includes an external play area
  • Proposes 17 new car parking spaces and a vehicular drop-off zone
  • Includes a new raised pedestrian crossing over The Court road
Written by AI from the council’s description

An AI model rewrote the council’s description below in everyday words on 9 Oct 2026. It was told to use only that text, and every number it wrote was checked against it. It says nothing about whether the application will be approved. The council’s wording and planning file are the record.

The council’s description

Permission for development at this site of c. 0.22 hectares at lands. This application site consists of: Parcel A, measuring c. 0.13 hectares, which is principally bounded by the red line rail LUAS tracks associated with the Citywest Campus Luas stop to the north/northwest, existing dwelling No. 19 Citywest Village Avenue to the south, The Mews, Citywest Village residential development and existing dwellings No. 1 The Court and No. 4 The Place to the east and Citywest Village Avenue (road) to the west; Parcel B, measuring c. 0.08 hectares, is principally bounded by The Court (road) to the north, existing dwellings Nos. 10, 12 and 14 The Place to the south, residential development known as Árd Mor Dale to the east and existing dwelling No. 4 The Court to the west; and Two existing parking spaces north of The Court road will be allocated to the proposed childcare facility. The development will consist of the construction of a mixed-use development comprising 12 no. residential units (4 no. apartments and 8 no. houses), coffee kiosk and childcare facility. The apartments, coffee kiosk and childcare facility will be located in a single building arranged across three storeys. The residential units will comprise of 4 no. 1 bedroom apartments (ranging from c.50-52sqm GFA each) with northeast and southwest facing balconies, 4 no. 2 bedroom mid-terrace two-storey houses (c.74sqm GFA each) and 4 no. 3 bedroom end terrace two-storey houses (ranging from c.93-103sqm GFA each) with associated rear private gardens. The apartment building will contain residential bin and bike storage (c.10sqm GFA combined), a coffee kiosk (c.13sqm GFA) with separate bin storage (c.1.5sqm GFA) and outdoor seating area, a three classroom childcare facility with associated office, staff, toilet and laundry facilities (c.135sqm GFA), an external play area (c.67sqm GFA) and external bin and bike store (c.6sqm) serving the childcare facility, all located at ground floor level. The development will also consist of 17 no. proposed car parking spaces, 2 no. existing spaces allocated to the proposed childcare facility, vehicular drop-off zone serving the childcare facility, dedicated bicycle stores in front gardens serving houses, secure visitor bicycle parking throughout, bin storage, open space, public realm areas serving the mixed-use apartment building, hard and soft landscaping, boundary treatment works, photovoltaic panels to houses, pedestrian access, road works consisting of a proposed raised platform/pedestrian crossing over The Court road, provision of Sustainable Urban Drainage systems (SUDS) and all other associated site excavation, infrastructural and site development works above and below ground, including site servicing (foul and surface water drainage and water supply including minor diversion to the existing watermain)

Planning details

Reference
SD25A/0051W
Local authority
South Dublin County Council
Status
Granted · register status “Final Grant”
Received
23 Jun 2025
Observations close
28 Jul 2025 (closed 442 days ago)
Decision due
21 Jul 2025 · decided 21 Jul 2025
Decision
Grant permission on 21 Jul 2025
Site area
2,179 m² from the mapped boundary, not the council's figure
Applicant
Marshall Yards Development Company Limited council register

Nearby 40 · 500 m · 5 years

Show all 40

Explore this area on the map →

Homes nearby

Development land nearby

From Buildable, our sister site for development land in Dublin.

See all development land near here →

Zoning

R2 — Existing residential

An established residential area. The objective is to protect existing residential amenity as well as to provide housing — which is the objective a neighbour's objection to an overbearing extension is usually argued under.

Protections nearby 250 m

Flood area nearby (OPW maps). floodinfo.ie ↗

Nothing else protected nearby.

Where this comes from

National planning feed (NPAD), fetched 11 Sept 2026, 18:51.

Source: npad · fetched 11 Sept 2026, 18:51
SourceLicenceFetchedLink
npadCC-BY-4.011 Sept 2026, 18:51open
Summary

SD25A/0051W is a planning application to South Dublin County Council for permission for development at this site of c. 0.22 hectares at lands. This application, received on 23 Jun 2025; permission was granted on 21 Jul 2025.