Unit 5A-C, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24
Data updated 13 Sept 2026 · register lag up to 7 days · sources & freshness
SHD3ABP-303803-19 is a planning application for shd3-application to abp at Unit 5A-C, Second Avenue, Cookstown Industrial Estate, Tallaght, Dublin 24, received by South Dublin County Council on 20 Feb 2019 and first seen by Planning Register on 11 Sept 2026. The application describes: Demolition of the existing 2,590sq.m industrial building and the construction of a 'build to rent' housing development providing a total of 196 residential apartments (comprising 45 studio units, 48 one-bed units, 8 two-bed (3-person) units and 95 two-bed (4-person) units) in 4 six-nine storey blocks over basement. The development will include 1 commercial unit (248sq.m, accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2018) at ground floor level, 1 office unit (111sq.m) at ground floor level; a crèche(192sq.m) at ground floor level; a gym (18sq.m) at ground floor level; 6 communal amenity spaces provided at ground and first floor levels across the development (totalling 286sq.m); a communal hot desk room (25sq.m) at ground floor level; and 3 communal secure storage areas (totalling 31sq.m) at ground floor level; along with a ground floor level landscaped courtyard, 408 bicycle spaces (308 resident spaces at basement level and 100 visitor spaces at ground floor level); an underground carpark (accessed from Second Avenue, providing a total of 67 parking spaces (including 61 standard spaces and 6 mobility impaired user parking spaces)) and refuse/waste/recycling stores. Associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB Substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. The breakdown of units is as detailed below: Block A (located in the north-eastern corner of the site) comprises a total of 43 units, as follows: (a) 10 studio apartments, (b) 13 1-bed apartments and (c) 20 2-bed (4-person) apartments. Block B (located in the north-western corner of the site) comprises a total of 50 units, as follows: (a) 6 studio apartments, (b) 16 1-bed apartments, (c) 8 2-bed (3-person) apartments and (d) 20 2-bed (4-person) apartments. Block C (located to the west of the site) comprises a total of 50 units, as follows: (a) 15 studio apartments, (b) 6 1-bed apartments and (c) 29 2-bed (4-person) apartments. Block D (located to the south of the site), comprises a total of 53 units, as follows: (a) 14 studio apartments, (b)13 1-bed apartments and (c) 26 2-bed (4-person) apartments. Each unit in Block A, B, C & D has associated private open space in the form of a ground floor terrace or a balcony. Additional discussions regarding the proposed development are provided in the architectural drawings, prepared by C+W O'Brien Architects, and the Statement of Consistency & Planning Report, prepared by Hughes Planning and Development Consultants, submitted with the application. The council granted permission on 25 Jul 2019. The five-week observation window closed on 27 Mar 2019. A commencement notice (SN0006897SD) was lodged on 7 Feb 2022, so works have started on site. The site is zoned M1 — metro / rail economic corridor under the South Dublin County Council development plan. The scheme is for 196 units. Within 500 m there are 29 other decided applications in the last five years and 2 appeals.
Proposal
Demolition of the existing 2,590sq.m industrial building and the construction of a 'build to rent' housing development providing a total of 196 residential apartments (comprising 45 studio units, 48 one-bed units, 8 two-bed (3-person) units and 95 two-bed (4-person) units) in 4 six-nine storey blocks over basement. The development will include 1 commercial unit (248sq.m, accommodating Class 1, 2 and 8 uses as per the Planning and Development Regulations, 2001-2018) at ground floor level, 1 office unit (111sq.m) at ground floor level; a crèche(192sq.m) at ground floor level; a gym (18sq.m) at ground floor level; 6 communal amenity spaces provided at ground and first floor levels across the development (totalling 286sq.m); a communal hot desk room (25sq.m) at ground floor level; and 3 communal secure storage areas (totalling 31sq.m) at ground floor level; along with a ground floor level landscaped courtyard, 408 bicycle spaces (308 resident spaces at basement level and 100 visitor spaces at ground floor level); an underground carpark (accessed from Second Avenue, providing a total of 67 parking spaces (including 61 standard spaces and 6 mobility impaired user parking spaces)) and refuse/waste/recycling stores. Associated site and infrastructural works are also proposed which include: foul and surface water drainage; attenuation tanks; lighting; landscaping; boundary fences; plant areas; ESB Substations; internal hard landscaping, including footpaths and street furniture; and all associated site development works. The breakdown of units is as detailed below: Block A (located in the north-eastern corner of the site) comprises a total of 43 units, as follows: (a) 10 studio apartments, (b) 13 1-bed apartments and (c) 20 2-bed (4-person) apartments. Block B (located in the north-western corner of the site) comprises a total of 50 units, as follows: (a) 6 studio apartments, (b) 16 1-bed apartments, (c) 8 2-bed (3-person) apartments and (d) 20 2-bed (4-person) apartments. Block C (located to the west of the site) comprises a total of 50 units, as follows: (a) 15 studio apartments, (b) 6 1-bed apartments and (c) 29 2-bed (4-person) apartments. Block D (located to the south of the site), comprises a total of 53 units, as follows: (a) 14 studio apartments, (b)13 1-bed apartments and (c) 26 2-bed (4-person) apartments. Each unit in Block A, B, C & D has associated private open space in the form of a ground floor terrace or a balcony. Additional discussions regarding the proposed development are provided in the architectural drawings, prepared by C+W O'Brien Architects, and the Statement of Consistency & Planning Report, prepared by Hughes Planning and Development Consultants, submitted with the application.
- Status
- Decision
- Decision
- Grant permission on 25 Jul 2019
- Units
- 196
- Site (from polygon)
- 6,033 m²
- Location precision
- site (coords_polygon)
Timeline
- 20 Feb 2019New applicationObservation window closed 27 Mar 2019
- 25 Jul 2019DecisionAppeal window closed 22 Aug 2019

Full planning report for 53.29378, -6.38396
One document, every dataset, each section with its source and fetch time. Print it or download it as a PDF. It informs a planning search; it is not a statutory search.
1 Where this is — preview
1 Deadlines still open
Appeal
Not appealed.
Commencement
- Seven day notice SN0006897SD
- Seven day notice SN0006593SD
Zoning at the site
REGEN: To facilitate enterprise and/or residential led regeneration
A high-density mixed-use employment corridor tied to a rail or metro line. Expect the tallest buildings in the area here.
Designations within 250 m
No OPW flood extent nearby.
- Radon risk area · 2
Provenance
Register row from the national planning applications feed (NPAD), fetched 11 Sept 2026, 18:51 (store id 116577). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: https://planning.agileapplications.ie/southdublin/application-details/55929.
Source: npad · fetched 11 Sept 2026, 18:51