Templehouse , Rathbaun , Co. Sligo
- 1 Apr 2021Received
- 26 May 2021Refused
- 10 Jul 2028Permission expires
- Status
- Appeal decided — granted
- Decision
- Refused · 26 May 2021
- Council
- Sligo County Council
- Type
- PERMISSION
- Site
- 9.62 ha
What’s proposed
development consisting of the construction of one wind turbine up to 5MW with overall tip height of up to 180m; Construct the wind turbine foundation, hard standing and assembly area; Provide a site entrance and an access track within the site; Construct an on-site 20kV substation and underground electrical cable; Install a 7.9km underground grid connection, which passes throught the following townlands: Rathbaun, Templehouse Demesne, Kilbrattan, Portinch, Emlaghnaghtan, Cartron (Percival), Cartron (Phibbs), Lecarrow, Carrowkeel, Cloonkeevy, Ballybrennan, connecting into the existing ESB Substation; and construct all associated site development and ancillary works. A Natura Impact Statement has been prepared with this planning application
21113 is a planning application to Sligo County Council for development consisting of the construction of one wind turbine up to 5MW with overall, received on 1 Apr 2021; permission was refused on 26 May 2021.
Planning details
- Reference
- 21113
- Local authority
- Sligo County Council
- Status
- Appeal decided — granted · register status “APPLICATION FINALISED”
- Received
- 1 Apr 2021
- Observations close
- 6 May 2021 (closed 1964 days ago)
- Decision due
- 26 May 2021 · decided 26 May 2021
- Decision
- Refused on 26 May 2021
- Proposed development
- development consisting of the construction of one wind turbine up to 5MW with overall tip height of up to 180m; Construct the wind turbine foundation, hard standing and assembly area; Provide a site entrance and an access track within the site; Construct an on-site 20kV substation and underground electrical cable; Install a 7.9km underground grid connection, which passes throught the following townlands: Rathbaun, Templehouse Demesne, Kilbrattan, Portinch, Emlaghnaghtan, Cartron (Percival), Cartron (Phibbs), Lecarrow, Carrowkeel, Cloonkeevy, Ballybrennan, connecting into the existing ESB Substation; and construct all associated site development and ancillary works. A Natura Impact Statement has been prepared with this planning applicationAs published by the register.
- Site area
- 9.62 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby nothing else within 500 m in the last 5 years
No other application within 500 m in the last 5 years.
Appeal
The register records appeal ABP-310612-21 (status unknown) but we have not matched the ACP case yet.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 459546). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/SligoCC/AppFileRefDetails/21113/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |