Ballina Rd , Abbeytown , Ballysadare
- 7 Mar 2022Received
- 11 Apr 2022Observations closed
- Status
- Withdrawn or invalid
- Decision
- Not yet
- Council
- Sligo County Council
- Type
- PERMISSION
- Site
- 8,788 m²
What’s proposed
development consisting of the following: (a) Construction of a new 520sqm single storey building, comprising of retail area with ancillary off-licence use, 2 no. ancillary food offer counters, seating area, toilets, manager's office and ancillary storage and food preparation areas; (b) 'drive thru' take away facility associated with the food offer including ordering/collection windows; (c) Construction of a new forecourt with 4 no. pump islands and canopy over; (d) Installation of 4 no. 40,000L underground fuel storage tanks, associated pipeworks and overground fill points; (e) Installation of 1 no. truck pump island and associated storage tanks, pipework and overground fill points. (f) Installation of 1 No. jet wash facility; (g) Installation of 1 No. main totem sign and (h) Installation of on-site wastewater treatment system (i) Construction of all ancillary site features including screened bin compound, screened refuse compound, signage, boundary treatments, drainage systems, landscaping and car parking And associated site works
2288 is a planning application to Sligo County Council for development consisting of the following: (a) Construction of a new 520sqm single storey, received on 7 Mar 2022; the file is recorded as withdrawn.
Planning details
- Reference
- 2288
- Local authority
- Sligo County Council
- Status
- Withdrawn or invalid · register status “WITHDRAWN”
- Received
- 7 Mar 2022
- Observations close
- 11 Apr 2022 (closed 1621 days ago)
- Decision due
- No due date published
- Decision
- Not decided
- Proposed development
- development consisting of the following: (a) Construction of a new 520sqm single storey building, comprising of retail area with ancillary off-licence use, 2 no. ancillary food offer counters, seating area, toilets, manager's office and ancillary storage and food preparation areas; (b) 'drive thru' take away facility associated with the food offer including ordering/collection windows; (c) Construction of a new forecourt with 4 no. pump islands and canopy over; (d) Installation of 4 no. 40,000L underground fuel storage tanks, associated pipeworks and overground fill points; (e) Installation of 1 no. truck pump island and associated storage tanks, pipework and overground fill points. (f) Installation of 1 No. jet wash facility; (g) Installation of 1 No. main totem sign and (h) Installation of on-site wastewater treatment system (i) Construction of all ancillary site features including screened bin compound, screened refuse compound, signage, boundary treatments, drainage systems, landscaping and car parking And associated site worksAs published by the register.
- Site area
- 8,788 m² from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Full planning report for 54.20969, -8.52739
Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.
No account, no payment. Not a statutory planning search.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 460425). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/SligoCC/AppFileRefDetails/2288/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |