PlanningRegister.ie
Sligo County Council · 2360158

Sligo Sudbury School, Faughts Doonally, Co Sligo

Approved in Apr 2024. No sign of building yet.

  1. 29 Jun 2023Received
  2. 26 Feb 2024Conditional
  3. 3 Apr 2024Final approval
  4. 2 Apr 2029Approval runs out
Status
Approved
Decision
Conditional · 26 Feb 2024
Council
Sligo County Council
Type
PERMISSION
Site
2.75 ha

Live near Sligo Sudbury School?

Everything else planned on your street, in one report.

Check my street
Council register ↗

One email to confirm. Unsubscribe in one click.

What’s proposed

(A) Proposed development to the existing Sudbury School, “Former Doonally School”, a protected structure (RPS No. 289) under Sligo and Environs Development Plan, to consist of: (1) Internal works within main school building consisting of reorganisation of non-original fittings in kitchen, upgrading of non-original radiators in school building, and new heating system to Schoolmaster’s House. (2) Internal works to the 1960 Rear Extension of school building. (3) Additional School Accommodation extending from the 1960 Rear Extension of school building. (Floor Area = 545 m² plus 360 m² of covered external space). (B). Development outside the curtilage of the protected structure to consist of: (4) Demolition of existing 1970s prefabricated accommodation (floor area = 47 m²) and of shed structure (10 m²) at rear of site. (5) Retention of (i) barn structure to rear of school site (floor area = 55 m² ) used for sports equipment storage, and (ii) timber-clad art workshop space (floor area = 24 m²) Total floor area for retention = 79 m². (6) New Sports Hall (837 m² plus 335 m² of covered external space). (7) Landscaping works to rear part of site including new Multi-Sports Outdoor Pitch, Running Track and Grassed overflow car-parking area. (8) Replacement of existing vehicular access to ‘Lizzie’s Cottage’ with new access at eastern end of the site including one accessible and a disabled access drop-off area. Geometry of new site entrance in compliance with Co. Sligo Development Plan 2017-2023. (9) Extension of existing proprietary tertiary effluent treatment system and polishing filter with a new enlarged version to cater for max. 160 people (students and staff) .(10) Carrying out all associated ancillary site works to include provision of services, storm water attenuation pond, landscaping and boundary treatment

Planning details

Reference
2360158
Local authority
Sligo County Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
29 Jun 2023
Observations close
3 Aug 2023 (closed 1173 days ago)
Decision due
29 Feb 2024 · decided 26 Feb 2024
Decision
Conditional on 26 Feb 2024
Site area
2.75 ha from the mapped boundary, not the council's figure

Nearby 5 · 500 m · 5 years

Explore this area on the map →

Homes nearby

Zoning

G3 — High amenity

Protected high-amenity landscape. Development is resisted to preserve the character of the area.

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2360158 is a planning application to Sligo County Council for (A) Proposed development to the existing Sudbury School, “Former Doonally School”, a, received on 29 Jun 2023; permission was granted with conditions on 26 Feb 2024.