  1. 14 May 2024Received
  2. 2 Dec 2024Refused
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Refused
Decision
Refused · 2 Dec 2024
Council
Sligo County Council
Type
PERMISSION
Site
2,355 m²

What’s proposed

1. Refurbishment works to protected structure no. 163 SE in the Sligo County Development Plan 2017-2023. The work will include internal modifications to facilitate ground floor entrance lobby and commercial space circa 213m2. Change of use at first and second floor level from commercial to residential use creating 6 no. 1 bedroom apartments and 2 no. 3 bedroom apartments including elevational upgrade works. 2. Demolition of existing rear extensions circa 1,450 m2 forming part of protected structure no. 163 SE in the Sligo County Development Plan 2017-2023. 3. Proposed 4 Storey rear building linked to the protected structure to accommodate 9 no.1 bedroom apartments, 19 no. 2 bedroom apartments, lift and access stairs and associated circulation space. 4. ESB Substation building circa 24m2. 5. Single storey refuse and storage building circa 61m2. 6. Vehicular access via existing Abbey Street car park entrance. 7. All surface car parking, landscaping and associated site works and service connections

2460166 is a planning application to Sligo County Council for 1. Refurbishment works to protected structure no. 163 SE in the Sligo County Development, received on 14 May 2024; permission was refused on 2 Dec 2024.

Planning details

Reference
2460166
Local authority
Sligo County Council
Status
Refused · register status “APPLICATION FINALISED
Received
14 May 2024
Observations close
18 Jun 2024 (closed 828 days ago)
Decision due
2 Dec 2024 · decided 2 Dec 2024
Decision
Refused on 2 Dec 2024
Proposed development
1. Refurbishment works to protected structure no. 163 SE in the Sligo County Development Plan 2017-2023. The work will include internal modifications to facilitate ground floor entrance lobby and commercial space circa 213m2. Change of use at first and second floor level from commercial to residential use creating 6 no. 1 bedroom apartments and 2 no. 3 bedroom apartments including elevational upgrade works. 2. Demolition of existing rear extensions circa 1,450 m2 forming part of protected structure no. 163 SE in the Sligo County Development Plan 2017-2023. 3. Proposed 4 Storey rear building linked to the protected structure to accommodate 9 no.1 bedroom apartments, 19 no. 2 bedroom apartments, lift and access stairs and associated circulation space. 4. ESB Substation building circa 24m2. 5. Single storey refuse and storage building circa 61m2. 6. Vehicular access via existing Abbey Street car park entrance. 7. All surface car parking, landscaping and associated site works and service connections
As published by the register.
Site area
2,355 m² from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 106 applications within 500 m in the last 5 years

Show all 106

Explore this area on the map →

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 460999). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/SligoCC/AppFileRefDetails/2460166/0.

    Source: npad · fetched 18 Sept 2026, 15:44
    SourceLicenceFetchedLink
    npadCC-BY-4.018 Sept 2026, 15:44open