Approved in Nov 2025. No sign of building yet.

  1. 5 Feb 2025Received
  2. 3 Oct 2025Conditional
  3. 5 Nov 2025Final approval
  4. 4 Nov 2030Approval runs out
Status
Approved
Decision
Conditional · 3 Oct 2025
Council
Sligo County Council
Type
PERMISSION
Site
2.16 ha

Open on the full map →

Live near Townland of Ballysumaghan?

Everything else planned on your street, in one report.

Check my street
Council register ↗

One email to confirm. Unsubscribe in one click.

What’s proposed

The development will consist of an enclosed battery energy storage system compound on c. 2.04 hectares. The development will consist of up to 15 no. BESS units comprising of battery cells, modules and racks set within containers stored on concrete bases and ancillary equipment (4 no. BESS containers within each ‘BESS unit’); an individual unit inverter at each BESS unit with some additional ancillary equipment; a Transformer Compound, Control building (including control room and switch room), Interface Kiosk and all associated electrical infrastructure equipment and works; attenuation drainage pond to the northwest of the site; a temporary site compound and all associated works (to be located to the south of the BESS site); a new vehicular entrance to local road and all associated internal access tracks; associated electrical underground cabling and ducting works facilitating the connection of proposed electrical substation to the adjacent Srananagh transmission station; all associated site development, lighting, landscaping, CCTV, security fencing, boundary treatment works above and below ground and all associated ancillary infrastructure

Planning details

Reference
2560036
Local authority
Sligo County Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
5 Feb 2025
Decision due
12 Oct 2025 · decided 3 Oct 2025
Decision
Conditional on 3 Oct 2025
Site area
2.16 ha from the mapped boundary, not the council's figure

Nearby 6 · 500 m · 5 years

Distance
Time

Explore this area on the map →

Homes nearby

Protections nearby 250 m

  • NIAH-recorded building · 1
    Castle Neymoe
  • Recorded monument · 8
    R159293; R159298

Where this comes from

National planning feed (NPAD), fetched 18 Sept 2026, 15:44.

Source: National Planning Application Database · fetched 18 Sept 2026, 15:44
SourceLicenceFetchedLink
National Planning Application DatabaseCC BY 4.018 Sept 2026, 15:44open
Summary

2560036 is a planning application to Sligo County Council for the development will consist of an enclosed battery energy storage system compound on c., received on 5 Feb 2025; permission was granted with conditions on 3 Oct 2025.