Kilcommonmore (North) , Cahir , Co. Tipperary
- 16 Feb 2018Received
- 20 Jun 2018Conditional
- Status
- Under appeal
- Decision
- Conditional · 20 Jun 2018
- Council
- Tipperary County Council
- Type
- PERMISSION
- Site
- 1.57 ha
What’s proposed
development consisting of the construction of a 100MW battery energy storage system (BESS) with associated balance of plant, equipment and buildings including:a BESS building of 8m height, 82m length and 44m width (comprising of the ground floor a battery rack room, meeting room, contractor/storeroom, wet room, UPS room, switch gear room, WC, Transformer rooms, inverter rooms, and on a mezzanine floor a HVAC/store room); 2 no. 905m3 firewater storage tanks, an 853m3 underground surface water attenuation tank, an 1030m3 underground firewater retention tank, a 110kV electrical substation and control building of approximately 5.2m height and an access and circulation road with new junction onto the local road, footpath, 8 no. car parking spaces, 3 no. retaining wall structures up to a height of 3m and native tree and scrub planting, 3m paladin security fence, and all other associated site development works including surface water and foul drainage required to facilitate the development
18600187 is a planning application to Tipperary County Council for development consisting of the construction of a 100MW battery energy storage system, received on 16 Feb 2018; permission was granted with conditions on 20 Jun 2018.
Planning details
- Reference
- 18600187
- Local authority
- Tipperary County Council
- Status
- Under appeal · register status “WITHDRAWN”
- Received
- 16 Feb 2018
- Observations close
- 23 Mar 2018 (closed 3109 days ago)
- Decision due
- No due date published
- Decision
- Conditional on 20 Jun 2018
- Proposed development
- development consisting of the construction of a 100MW battery energy storage system (BESS) with associated balance of plant, equipment and buildings including:a BESS building of 8m height, 82m length and 44m width (comprising of the ground floor a battery rack room, meeting room, contractor/storeroom, wet room, UPS room, switch gear room, WC, Transformer rooms, inverter rooms, and on a mezzanine floor a HVAC/store room); 2 no. 905m3 firewater storage tanks, an 853m3 underground surface water attenuation tank, an 1030m3 underground firewater retention tank, a 110kV electrical substation and control building of approximately 5.2m height and an access and circulation road with new junction onto the local road, footpath, 8 no. car parking spaces, 3 no. retaining wall structures up to a height of 3m and native tree and scrub planting, 3m paladin security fence, and all other associated site development works including surface water and foul drainage required to facilitate the developmentAs published by the register.
- Site area
- 1.57 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby 1 application within 500 m in the last 5 years
Homes nearby
Appeal
The register records appeal ABP-302055-18 (status unknown) but we have not matched the ACP case yet.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 463735). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/18600187/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |