PlanningRegister.ie
Tipperary County Council · 18600415

The Glebe , Colman , Fethard

  1. 6 Apr 2018Received
  2. 28 May 2018Conditional
  3. 2 Jul 2018Final grant
  4. 1 Jul 2023Permission expires
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Granted with conditions
Decision
Conditional · 28 May 2018
Council
Tipperary County Council
Type
PERMISSION
Site
3.02 ha

What’s proposed

construct extension to rear/East of existing farmhouse dwelling, demolition of existing sunroom to South and replacement with feature bay window to South, new window to southern elevation at first floor, extension of the dwelling to the West/Northwest and reuse of existing adjoining agricultural out-house as habitable accommodation and this to be integrated into the main dwelling to function as one dwelling, alterations, refurbishment and up grading of existing dwelling, repair and reroofing of existing damaged outhouse, to the South East to be used as garage, upgrading of the existing site effluent system as appropriate, modification of external walls and fencing as appropriate and all associated works

18600415 is a planning application to Tipperary County Council for construct extension to rear/East of existing farmhouse dwelling, demolition of existing, received on 6 Apr 2018; permission was granted with conditions on 28 May 2018.

Planning details

Reference
18600415
Local authority
Tipperary County Council
Status
Granted with conditions · register status “APPLICATION FINALISED”
Received
6 Apr 2018
Observations close
11 May 2018 (closed 3059 days ago)
Decision due
31 May 2018 · decided 28 May 2018
Decision
Conditional on 28 May 2018
Proposed development
construct extension to rear/East of existing farmhouse dwelling, demolition of existing sunroom to South and replacement with feature bay window to South, new window to southern elevation at first floor, extension of the dwelling to the West/Northwest and reuse of existing adjoining agricultural out-house as habitable accommodation and this to be integrated into the main dwelling to function as one dwelling, alterations, refurbishment and up grading of existing dwelling, repair and reroofing of existing damaged outhouse, to the South East to be used as garage, upgrading of the existing site effluent system as appropriate, modification of external walls and fencing as appropriate and all associated works
As published by the register.
Site area
3.02 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby 3 applications within 500 m in the last 5 years

Explore this area on the map →

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 466415). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/18600415/0.

    Source: npad · fetched 18 Sept 2026, 15:44
    SourceLicenceFetchedLink
    npadCC-BY-4.018 Sept 2026, 15:44open