Tipperary County Council · 20972

Farranrory Upper Farranrory Lower Coolnashinnagh and Gortnasmuttaun , Co. Tipperary

  1. 1 Sept 2020Received
  2. 24 Feb 2021Conditional
  3. 30 Mar 2021Final grant
  4. 31 Mar 2025Commenced
  5. 29 Mar 2026Permission expires
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Commenced
Decision
Conditional · 24 Feb 2021
Council
Tipperary County Council
Type
PERMISSION
Site
61.55 ha

What’s proposed

a ten year planning permission for a renewable energy development with a 40-year operational life (from the date of commissioning of the renewable energy development). The entirety of the development constitutes the provision of a 9-turbine wind farm and all associated works on lands in both Counties Tipperary and Kilkenny. This development comprises part of an overall development for which planning permission is also sought for a 38kV substation in the townland of Killeen, Co. Kilkenny. A separate planning application will be made for an underground grid connection to Tipperary County Council and to Kilkenny County Council. The proposed development will constitute the provision of the following: • Construction of up to 9 turbines each with a maximum overall ground to blade tip height of up to 150 metres and associated foundations and hardstand areas; • Construction of new site entrances and upgrade of existing site entrances; • Internal wind farm underground power and communications cabling; • Upgrade of existing access tracks and provision of new site access roads; • Removal of existing Meteorological Masts and construction of 1 new Meteorological Mast for monitoring wind speeds with a maximum height of up to 85 metres; • Site drainage network • Construction of a new temporary site compound for use during construction; • Two Borrow Pits • Construction of a new on-site 38kV substation The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement

20972 is a planning application to Tipperary County Council for a ten year planning permission for a renewable energy development with a 40-year, received on 1 Sept 2020; permission was granted with conditions on 24 Feb 2021.

Planning details

Reference
20972
Local authority
Tipperary County Council
Status
Commenced · register status “APPLICATION FINALISED
Received
1 Sept 2020
Observations close
6 Oct 2020 (closed 2173 days ago)
Decision due
25 Feb 2021 · decided 24 Feb 2021
Decision
Conditional on 24 Feb 2021
Proposed development
a ten year planning permission for a renewable energy development with a 40-year operational life (from the date of commissioning of the renewable energy development). The entirety of the development constitutes the provision of a 9-turbine wind farm and all associated works on lands in both Counties Tipperary and Kilkenny. This development comprises part of an overall development for which planning permission is also sought for a 38kV substation in the townland of Killeen, Co. Kilkenny. A separate planning application will be made for an underground grid connection to Tipperary County Council and to Kilkenny County Council. The proposed development will constitute the provision of the following: • Construction of up to 9 turbines each with a maximum overall ground to blade tip height of up to 150 metres and associated foundations and hardstand areas; • Construction of new site entrances and upgrade of existing site entrances; • Internal wind farm underground power and communications cabling; • Upgrade of existing access tracks and provision of new site access roads; • Removal of existing Meteorological Masts and construction of 1 new Meteorological Mast for monitoring wind speeds with a maximum height of up to 85 metres; • Site drainage network • Construction of a new temporary site compound for use during construction; • Two Borrow Pits • Construction of a new on-site 38kV substation The planning application will be accompanied by an Environmental Impact Assessment Report (EIAR) and Natura Impact Statement
As published by the register.
Site area
61.55 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Around this site this application first, then everything within 500 m

Explore from here
Click a dot to open its row.
Loading planning applications…
Free · during launch · limited time

Full planning report for 52.61262, -7.51633

Zoning, appeals, sold prices, flood and heritage — the whole area in one PDF.

No account, no payment. Not a statutory planning search.

Appeal

Not appealed.

Commencement

  • Commencement notice CN0126923TT
    31 Mar 2025Coolnashinnagh, Farranrory, Tipperarymatched by ref_exact

Zoning at the site

No zoning objective covers this site in the current plan.

Designations within 250 m

No OPW flood extent nearby.

No other designation nearby.

Provenance

Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 470352). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/20972/0.

Source: npad · fetched 18 Sept 2026, 15:44