Cooleeny , Derryfadda and Killoran , Co. Tipperary
- 30 Jul 2021Received
- 23 Feb 2022Conditional
- 29 Mar 2022Final grant
- 28 Mar 2027Permission expires
- Status
- Granted with conditions
- Decision
- Conditional · 23 Feb 2022
- Council
- Tipperary County Council
- Type
- PERMISSION
- Units
- 1
- Site
- 77.71 ha
What’s proposed
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x 2.6m) with an integrated bund, 716 string Inverters, 1 no. DNO Substation Building (16.28m2 x 5.42m), 1 No. Storage and maintenance building (ca. 57.31m2 x 4.45m tall), 38 no. CCTV cameras mounted on ca. 3.8m high poles, perimeter security fenching and all ancillary works, the total development area will be ca. 77ha
211128 is a planning application to Tipperary County Council for construction of a Solar PV development with a maximum export capacity (MEC) of up to, received on 30 Jul 2021; permission was granted with conditions on 23 Feb 2022.
Planning details
- Reference
- 211128
- Local authority
- Tipperary County Council
- Status
- Granted with conditions · register status “APPLICATION FINALISED”
- Received
- 30 Jul 2021
- Observations close
- 3 Sept 2021 (closed 1843 days ago)
- Decision due
- 24 Feb 2022 · decided 23 Feb 2022
- Decision
- Conditional on 23 Feb 2022
- Proposed development
- construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x 2.6m) with an integrated bund, 716 string Inverters, 1 no. DNO Substation Building (16.28m2 x 5.42m), 1 No. Storage and maintenance building (ca. 57.31m2 x 4.45m tall), 38 no. CCTV cameras mounted on ca. 3.8m high poles, perimeter security fenching and all ancillary works, the total development area will be ca. 77haAs published by the register.
- Site area
- 77.71 ha from the mapped boundary, not the council's figure
- Applicant
- Not published — the national feed carries no applicant name council register
Nearby nothing else within 500 m in the last 5 years
No other application within 500 m in the last 5 years.
Appeal
Not appealed.
Commencement
No commencement notice matched to this reference.
Zoning at the site
No zoning objective covers this site in the current plan.
Designations within 250 m
No OPW flood extent nearby.
No other designation nearby.
Provenance
Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 468024). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/211128/0.
Source: npad · fetched 18 Sept 2026, 15:44
| Source | Licence | Fetched | Link |
|---|---|---|---|
| npad | CC-BY-4.0 | 18 Sept 2026, 15:44 | open |