Tipperary County Council · 211128

Cooleeny , Derryfadda and Killoran , Co. Tipperary

  1. 30 Jul 2021Received
  2. 23 Feb 2022Conditional
  3. 29 Mar 2022Final grant
  4. 28 Mar 2027Permission expires
Applications, appeals and commencement notices for this county. Consultations, zoning and RZLT maps: Dublin, Kildare, Meath and Wicklow only for now.
Status
Granted with conditions
Decision
Conditional · 23 Feb 2022
Council
Tipperary County Council
Type
PERMISSION
Units
1
Site
77.71 ha

What’s proposed

construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x 2.6m) with an integrated bund, 716 string Inverters, 1 no. DNO Substation Building (16.28m2 x 5.42m), 1 No. Storage and maintenance building (ca. 57.31m2 x 4.45m tall), 38 no. CCTV cameras mounted on ca. 3.8m high poles, perimeter security fenching and all ancillary works, the total development area will be ca. 77ha

211128 is a planning application to Tipperary County Council for construction of a Solar PV development with a maximum export capacity (MEC) of up to, received on 30 Jul 2021; permission was granted with conditions on 23 Feb 2022.

Planning details

Reference
211128
Local authority
Tipperary County Council
Status
Granted with conditions · register status “APPLICATION FINALISED
Received
30 Jul 2021
Observations close
3 Sept 2021 (closed 1843 days ago)
Decision due
24 Feb 2022 · decided 23 Feb 2022
Decision
Conditional on 23 Feb 2022
Proposed development
construction of a Solar PV development with a maximum export capacity (MEC) of up to 122MW comprising of ca. 214,800 no. photovoltaic panels laid out in arrays, the construction of a 38kV substation, (ca.57.31m2 x 4.45m tall) along with associated ancillary development including 30 no. Transformer Stations (ca. 7.27m2 x 2.6m) with an integrated bund, 716 string Inverters, 1 no. DNO Substation Building (16.28m2 x 5.42m), 1 No. Storage and maintenance building (ca. 57.31m2 x 4.45m tall), 38 no. CCTV cameras mounted on ca. 3.8m high poles, perimeter security fenching and all ancillary works, the total development area will be ca. 77ha
As published by the register.
Site area
77.71 ha from the mapped boundary, not the council's figure
Applicant
Not published — the national feed carries no applicant name council register

Nearby nothing else within 500 m in the last 5 years

No other application within 500 m in the last 5 years.

Explore this area on the map →

Appeal

Not appealed.

Commencement

No commencement notice matched to this reference.

    Zoning at the site

    No zoning objective covers this site in the current plan.

    Designations within 250 m

    No OPW flood extent nearby.

    No other designation nearby.

    Provenance

    Register row from the national planning applications feed (NPAD), fetched 18 Sept 2026, 15:44 (store id 468024). Deadlines were computed by the store from the received / decided dates under the Planning and Development Act 2000 and are recorded as events, not recomputed here. Council register: http://www.eplanning.ie/TipperaryCC/AppFileRefDetails/211128/0.

    Source: npad · fetched 18 Sept 2026, 15:44